prepared by URS Corporation.
Uniform Title:
Initial Study Report. Study plan Section 12.6, Aesthetic resources study.
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2014-2015]
Physical Description:
243 pages in various pagings : color maps ; 28 cm.
General Note:
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.
Abstract:
This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. The objectives for this study are to inventory and document baseline aesthetic (e.g. visual and auditory) conditions within the study area and evaluate the potential effects to aesthetic resources that may result from construction and operation of the proposed project. The analysis will focus on assessing these potential effects and will help identify potential design and other mitigation options. The primary study area is defined as a 30-mile buffer zone surrounding Project components (dam, reservoir, transmission lines, access corridors, dam, and camp facilities, and borrow sites). A secondary study area encompasses a region that mostly overlaps the primary area, but covers an area bounded by the George Parks Highway (western boundary), the Denali Highway (northern boundary), the Richardson Highway (eastern boundary), and the Glenn Highway (southern boundary).
Bibliography Note:
Includes bibliographical references (Part A: pages 43-47).
Added Corporate Author:
Added Uniform Title:
Succeeded by (expression): Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report.
Type of Report:
Initial Study Report.
Citation Reference Notes:
Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Linking Entry Complexity Note:
Succeeded by: Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report / prepared by AECOM. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).
Variant Title:
Running title: Initial Study Report. Aesthetic resources study (12.6)
Contents:
Part A. Sections 1-6, 8-10 -- Appendix A. Aesthetics analysis location map set -- Appendix B. Analysis locations narratives -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report.