El Paso Alaska Company, Docket nos. CP75-96, et al., prepared answering testimony and hearing exhibits. Dated May 18, 1976
Title:
El Paso Alaska Company, Docket nos. CP75-96, et al., prepared answering testimony and hearing exhibits. Dated May 18, 1976
Publication Information:
El Paso Alaska Company
Physical Description:
215 p.
General Note:
This testimony was submitted to the Federal Power Commission by El Paso Alaska Company of El Paso, Texas.

The realignment sheets is an atlas of 35 maps of the realigned route from Prudhoe Bay to Orca Bay (at Gravina Point). The cross section exhibit includes an index page plus 14 cross section plates.
Event Note:
May 18, 1976
Abstract:
This document contains the testimony of Paul C. Wright (of Pipe Line Technologists, Inc.), Robert H. Winn (Manager of Anchorage office of Dames & Moore), and R. Sage Murphy (Director of Pollution Control Services at Dames & Moore) about the realignment of the natural gas pipeline proposed by El Paso (known as the Trans-Alaska Gas Project). Large sets of exhibits (text, maps, graphs, and drawings) accompany each testimony. The purpose of the realignment is to utilize the Haul Road and the pipeline work pad now in place for Alyeska's Trans-Alaska Pipeline System. The three persons discuss the geotechnical feasibility and environmental aspects of the realignment.
Geographic Term:
Local Topical Term:

Added Corporate Author:
Added Title Contained Works:
Geotechnical feasibility of utilizing the Trans-Alaska Pipeline System alignment as a combined alignment for a hot oil pipeline and a chilled gas pipeline

El Paso Alaska Company pipeline realignment study supplemental environmental considerations
Variant Title:
Portion of title: Prepared answering testimony and hearing exhibits
Contents:
Prepared answering testimony of Paul C. Wright -- Description of facilities appendix: Proposed Alaskan Gas Pipeline, pipeline topographic realignment sheets -- El Paso Alaska Gas Pipeline realignment : typical cross sections of the realigned pipeline -- Prepared answering testimony of Robert H. Winn -- Geotechnical feasibility of utilizing the Trans-Alaska Pipeline System alignment as a combined alignment for a hot oil pipeline and a chilled gas pipeline / prepared by Dames & Moore. (iv, 42 pages.) -- Seasonal flow diagrams -- Average day flow diagram -- Flow diagram for maximum capacity -- Summary of the impact on the capital cost estimate by realignment of the Alaskan Gas Pipeline -- Prepared answering testimony of R. Sage Murphy -- Alaskan Gas Pipeline, list of pipeline crossings -- Alaskan Gas Pipeline, list of road crossings -- Alaska Gas Pipeline, list of stream crossings -- El Paso Alaska Company pipeline realignment study supplemental environmental considerations / prepared by Dames & Moore. (iii, 53, [5] pages).