Skip to:ContentBottom
Cover image for Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
Title:
Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
JLCTITLE245:
Subtask 2.10, Access planning study / prepared for Acres American, Incorporated ; prepared by R & M Consultants, Inc.
Edition:
Prelim. 2nd printing.
Publication Information:
[Anchorage, Alaska?] : R & M Consultants, [1981]
Physical Description:
278 leaves in various foliations : ill., maps, plans ; 28 cm.
General Note:
At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"October 1981."
Abstract:
"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--Leaves 1-2, 1-3.
Added Corporate Author:
Citation Reference Notes:
Assigned SUS document no. 82 in the Susitna Aquatic Impact Assessment Project bibliography.
Additional Physical Form Available:
Available also in microfiche format and electronic format on the Internet.
Variant Title:
Portion of title: Surveys and site facilities. Subtask 2.10, Access planning study

Subtask 2.10. Access planning study

Access planning study

Cover title: Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
Contents:
Introduction -- Summary -- Scope of work -- Previous studies -- Project design -- Project schedule -- Logistics requirements -- Access route design parameters -- Corridor selection -- Access plans -- Conclusions and recommendations -- Appendices.
Go to:Top of Page