Probable maximum flood (PMF) study, Study plan Section 16.5, Final study plan
by
 
Alaska Energy Authority.

Title
Probable maximum flood (PMF) study, Study plan Section 16.5, Final study plan

Alaska Energy Authority.

Corporate Author
Alaska Energy Authority.

Uniform Title
Final study plan. Study plan Section 16.5, Probable maximum flood (PMF) study

Publication Information
[Anchorage] : [Alaska Energy Authority], [2013]

Physical Description
9 p. ; 28 cm.

Series
Susitna-Watana Hydroelectric Project document ; no. 200

General Note
"July 2013."
 
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."
 
ARLIS assigned report number: SuWa 200.

Abstract
As part of the preparation for construction of the Susitna-Watana Hydroelectric Project, the stability of Project facilities need to be accessed for flood loading conditions. The general objectives of this probable maximum flood (PMF) study: (1) develop a site-specific probable maximum precipitation to be used for the derivation of the PMF including both a temporal and spatial distribution of rainfall; (2) model the runoff through the project drainage basin to produce the PMF inflow, including snowmelt considerations for the Project reservoir; (3) route the PMF inflow through the Project to obtain the PMF outflow and maximum flood elevation at the dam; and (4) use the Board of Consultants for technical review during development and performance of the site-specific studies. Geology and soils will be considered only to the extent that they affect flood runoff. Structural aspects of facilities will not be included in the PMF study.

Bibliography Note
Includes bibliographical references (p. 16.5-8 to 16.5-9).

Subject Term
Streamflow -- Research -- Alaska -- Susitna River.
 
Hydrologic models -- Alaska -- Susitna River Watershed.
 
Floods -- Research -- Alaska -- Susitna River Valley.

Added Corporate Author
Susitna-Watana Hydroelectric Project.

Type of Report
Final study plan.

Citation Reference Notes
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.

Additional Physical Form Available
Available also in electronic format on the Internet.

Variant Title
Running title: Final study plan. Probable maximum flood (PMF) study 16.5


LibraryCall NumberTypeStatus
Electronic ResourcesONLINEONLINE-ARLInternet

Bound With These Titles
Title Author Library Shelf Number Status
Final study plan Alaska Energy Authority. ARLIS TK1425.S8S92 no.200 sec.13-16 General Collection
Cultural and paleontological resources, Study plan Section 13 Introduction, Final study plan Alaska Energy Authority. ARLIS XX(2017069.2)
Cultural resources study, Study plan Section 13.5, Final study plan Alaska Energy Authority. ARLIS XX(2017070.2)
Paleontological resources study, Study plan Section 13.6, Final study plan Alaska Energy Authority. ARLIS TK1425 .S8 S92 no. 200 sec. 13.6
Subsistence resources, Study plan Section 14 Introduction, Final study plan Alaska Energy Authority. ARLIS XX(2017072.2)
Subsistence resources study, Study plan Section 14.5, Final study plan Alaska Energy Authority. ARLIS XX(2017073.5)
Socioeconomic and transportation resources, Study plan Section 15 Introduction, Final study plan Alaska Energy Authority. ARLIS XX(2017074.2)
Regional economic evaluation study, Study plan Section 15.5, Final study plan Alaska Energy Authority. ARLIS XX(2017075.2)
Social conditions and public goods and services study, Study plan Section 15.6, Final study plan Alaska Energy Authority. ARLIS TK1425 .S8 S92 no. 200 sec. 15.6
Transportation resources study, Study plan Section 15.7, Final study plan Alaska Energy Authority. ARLIS TK1425 .S8 S92 no. 200 sec. 15.7
Health impact assessment study, Study plan Section 15.8, Final study plan Alaska Energy Authority. ARLIS TK1425 .S8 S92 no. 200 sec. 15.8
Air quality study, Study plan Section 15.9, Final study plan Alaska Energy Authority. ARLIS TK1425 .S8 S92 no. 200 sec. 15.9
Project safety resources, Study plan Section 16 Introduction, Final study plan Alaska Energy Authority. ARLIS XX(2017080.2)
Probable maximum flood (PMF) study, Study plan Section 16.5, Final study plan Alaska Energy Authority. ARLIS XX(2017081.2)
Site-specific seismic hazard study, Study plan Section 16.6, Final study plan Alaska Energy Authority. ARLIS XX(2017082.2)