Stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station for Watana and Devil Canyon in 2002 and 2020 : report
by
HARZA-EBASCO Susitna Joint Venture.
Title
:
Stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station for Watana and Devil Canyon in 2002 and 2020 : report
by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority.
Publication Information
:
[Anchorage, Alaska] : Alaska Power Authority, [1985]
Physical Description
:
566 p. in various pagings : ill. ; 28 cm.
Series
:
Document ; no. 2603
General Note
:
Chiefly tables and graphs.
At head of title: Susitna Hydroelectric Project.
"February 1985."
"Susitna File No. 6.18.7.5."
"Volume 4, appendix F."
Volume 4 (appendix F) is part of a multi-volume set of seven reports differently titled and numbered 2600-2606 in the Document series.
"Federal Energy Regulatory Commission project no. 7114"--Cover.
Corporate Subject
:
Susitna Hydroelectric Project -- Environmental aspects.
Subject Term
:
Streamflow -- Alaska -- Susitna River.
Stream measurements -- Alaska -- Susitna River.
Added Corporate Author
:
HARZA-EBASCO Susitna Joint Venture.
Type of Report
:
Final report.
Citation Reference Notes
:
Assigned APA document no. 2603 in Susitna Hydroelectric Project document index.
Additional Physical Form Available
:
Available also in microfiche format and electronic format on the Internet.
Variant Title
:
Susitna Hydroelectric Project. Stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station for Watana and Devil Canyon in 2002 and 2020 : report
Cover title: Stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station for Watana and Devil Canyon operation in 2002 and 2020
Added title page title: Appendix F, Susitna Hydroelectric Project, Stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station for Watana and Devil Canyon in 2002 and 2020
Caption title: Case E-VI alternative flow requirements, Appendix F, Weekly flow duration curves for the Susitna River basin 2002 and 2020 energy demands
Library | Call Number | Type | Status |
---|
ARLIS | TK1425.S8F472 no.2603 | Book | General Collection |
ARLIS | TK1425.S8F472 no.2603 | Book | General Collection |
ARLIS | M/Fiche TK1425.S8F472 no.2603 | Microform | Media |
Electronic Resources | ONLINE | ONLINE-ARL | Internet |