Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
by
 
Alaska Power Authority.

Title
Task 2, Surveys and site facilities. Subtask 2.10, Access planning study

Subtask 2.10, Access planning study / prepared for Acres American, Incorporated ; prepared by R & M Consultants, Inc.

Edition
Prelim. 2nd printing.

Publication Information
[Anchorage, Alaska?] : R & M Consultants, [1981]

Physical Description
278 leaves in various foliations : ill., maps, plans ; 28 cm.

General Note
At head of title: Alaska Power Authority, Susitna Hydroelectric Project.
 
"October 1981."

Abstract
"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--Leaves 1-2, 1-3.

Corporate Subject
Susitna Hydroelectric Project -- Planning.

Subject Term
Transportation -- Alaska -- Susitna River Valley -- Planning.
 
Route surveying -- Alaska -- Susitna River Valley.
 
Roads -- Alaska -- Susitna River Valley -- Design and construction.
 
Hydroelectric power plants -- Alaska -- Susitna River Valley -- Design and construction.

Local Topical Term
Access roads -- Alaska -- Susitna River Valley.
 
Dams -- Access roads -- Alaska -- Susitna River Valley.

Added Corporate Author
Alaska Power Authority.

Citation Reference Notes
Assigned SUS document no. 82 in the Susitna Aquatic Impact Assessment Project bibliography.

Additional Physical Form Available
Available also in microfiche format and electronic format on the Internet.

Variant Title
Portion of title: Surveys and site facilities. Subtask 2.10, Access planning study
 
Subtask 2.10. Access planning study
 
Access planning study
 
Cover title: Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study

Contents
Introduction -- Summary -- Scope of work -- Previous studies -- Project design -- Project schedule -- Logistics requirements -- Access route design parameters -- Corridor selection -- Access plans -- Conclusions and recommendations -- Appendices.


LibraryCall NumberTypeStatus
ARLISTK1425.S8S9 no.82BookGeneral Collection
ARLISM/Fiche TK1425.S8S9 no.82MicroformMedia
Electronic ResourcesONLINEONLINE-ARLInternet
UAF RasmusonTK1425.S9.A437 1981 ALASKABookAlaska - Level 3