[1982]
"Presented are approaches to mitigate impacts predicted to occur if the Susitna hydroelectric project is constructed. This paper does not, howeve
Regular print
[1979]
"The proposed action discussed in this draft environmental impact statement is a two-dam system located in the Upper Susitna River Basin, which w
Electronic resource
2012.
Crosswalk tables (attached to this letter) document how the objectives and methodologies of the USFWS and NMFS' original study requests--dating b
Electronic resource
1983]
Exhibit E of the Application for license for the Susitna Hydroelectric Project considers all aspects of construction and operation of the propose
Regular print
[2012]
The goals and objectives of the multi-year riparian study are to: (1) identify and map riparian plant communities and characterize riparian physi
Regular print
[1980]
This document describes the research methodology for studying furbearing animals within a designated study area that represents where these anima
Regular print
[1984]
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct
Regular print
[1984]
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct
Regular print