Switch to list view
Switch to thumbnail view
2217 Results Found Subscribe to search results
000000000000ARLIS
Print
[1982]
This four-part document is a proposal submitted to Alaska Power Authority by HARZA-EBASCO Susitna Joint Venture for work on the Susitna Hydroelec
Regular print
[1983]
[Final].
This supplemental report is intended to provide an update of information through January 1983 as a supplement to the feasibility report for the S
Regular print
[1982]
Final draft.
A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost
Regular print
1982.
Draft.
A draft summary report of the Feasibility Study of the Susitna Hydroelectric Project proposed by the Alaska Power Authority and intended for the
Book
[2011]
This technical memorandum summarizes existing hydrologic data at various points along the Susitna River, its tributaries, and the Little Susitna
Regular print
[1980]
[1980 ed.].
An index of available historical hydrologic and climatologic data for Susitna Hydroelectric Project study team and others associated with the pro
Regular print
1982]
Rev.
This report describes the feasible mitigation alternatives (to avoid, minimize, rectify, reduce or eliminate, or compensate) for effects on fishe
Regular print
Limit Search Results
Author
Subject
Publication Date
This graph shows the distribution of publication dates for use with a date range slider. Switch to Years view for a more detailed breakdown of search results by year.
-
Language
Library
Go to:Search ResultsTop of PageSearch Facets