[1982]
This four-part document is a proposal submitted to Alaska Power Authority by HARZA-EBASCO Susitna Joint Venture for work on the Susitna Hydroelec
Regular print
1983-1984.
Microform
Other
[1983]
[Final].
This supplemental report is intended to provide an update of information through January 1983 as a supplement to the feasibility report for the S
Regular print
[1982]
Final draft.
A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost
Regular print
1982.
Draft.
A draft summary report of the Feasibility Study of the Susitna Hydroelectric Project proposed by the Alaska Power Authority and intended for the
Book
[2011]
This technical memorandum summarizes existing hydrologic data at various points along the Susitna River, its tributaries, and the Little Susitna
Regular print
[1980]
[1980 ed.].
An index of available historical hydrologic and climatologic data for Susitna Hydroelectric Project study team and others associated with the pro
Regular print
1982]
Rev.
This report describes the feasible mitigation alternatives (to avoid, minimize, rectify, reduce or eliminate, or compensate) for effects on fishe
Regular print