[News releases about the Susitna-Watana Hydroelectric Project]. Alaska Energy Authority hires project manager : Wayne Dyok joins Susitna-Watana Hydroelectric team. Major step for Susitna-Watana Hydroelectric Project. AEA reaches Susitna-Watana Hydro milestone : revised study plan filed after months of stakeholder engagement. FERC approves 44 Susitna-Watana Hydro study plans.
Regular print
[2014]
This engineering feasibility report for the Susitna-Watana Hydroelectric Project has been prepared to support the licensing process. It provides
Regular print
[2011]
Public review draft.
This data gap report summarizes the available literature about cultural resources in the project area, and reviews the cultural resources reports
Electronic resource
[2013]
This atlas shows the river miles and river mile tenths for the mainstem middle Susitna River (from river mile 97 just south of Talkeetna) to 239
Atlas
JLC Title 245h
[cartographic material]
2013 January 7.
This document is a responce to the Federal Energy Regulatory Commission Staff's December 31, 2012 letter to the Alaska Energy Authority (AEA) reg
Regular print
[2012]-
This is a collection of documents on the Susitna-Watana Hydroelectric Project that are written by or to the Federal Energy Regulatory Commission
Regular print
[2011]
The Alaska Energy Authority is filing this Notice of Intent and Pre-Application Document with the Federal Energy Regulatory Commission for an ori
Regular print
[2012]
This Proposed Study Plan (PSP) contains a total of 58 individual study plans that have been prepared in consultation with licensing participants.