Cover image for Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
Title:
Task 2, Surveys and site facilities. Subtask 2.10, Access planning study
JLCTITLE245:
Subtask 2.10, Access planning study / prepared for Acres American Incorporated ; prepared by R & M Consultants, Inc.
Edition:
[Final].
Publication Information:
[Anchorage, Alaska] : Alaska Power Authority, [1982]
Physical Description:
460 leaves in various foliations (some folded) : maps, plans ; 28 cm.
General Note:
At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"January 1982."

Assigned document nos. 3 and 1208 in Susitna Hydroelectric Project document index.

Assigned AEIDC document no. SUS 57.

Supplement to this work has been assigned document no. 9 (as well as 1590) in Susitna Hydroelectric Project document index.

Supplement to this work has been assigned APA Document no. 9 (as well as 1590) in Susitna Hydroelectric Project document index.
Abstract:
"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--P. 1-1.
Added Corporate Author:
Citation Reference Notes:
Assigned APA Document no. 3 in the Susitna Hydroelectric Project document index. Also assigned no. 1208 (duplicate entry).
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Portion of title: Surveys and site facilities. Subtask 2.10, Access planning study

Subtask 2.10, Access planning study

Access planning study

Cover title: Susitna Hydroelectric Project. Access planning study

Caption title: Alaska Power Authority, Susitna Hydroelectric Project. Access planning study
Contents:
appendix A. Preliminary design development -- appendix B. Proposed alternative segments -- appendix C. Alternative comparison: grade, curvature and distance -- appendix D. Terrain mapping -- appendix E. Environmental concerns -- appendix F. Cost estimates -- appendix G. Borrow pits.
Go to:Top of Page