Skip to:ContentBottom
Cover image for Watana transportation access analysis, Project no. 82002
Watana transportation access analysis, Project no. 82002
Title:
Watana transportation access analysis, Project no. 82002
JLCTITLE245:
prepared for Alaska Department of Transportation and Public Facilities ; prepared by HDR Alaska, Inc.
Edition:
Draft.
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2012]
Physical Description:
xvi, 108 p. : col. ill., col. maps ; 28 cm.
General Note:
"June 2012."

ARLIS assigned report number: SuWa 90.
Abstract:
This report provides a preliminary assessment of three alternative rail and road access routes presently under consideration for the Susitna-Watana Hydroelectric Project to be used during construction and for the operational life of the dam, and evaluates proposed airport locations for the support of construction. The intent is to provide a reconnaissance-level study based on engineering, scientific and environmental information. Additional information regarding environmental and other issues related to the routes will be developed later as part of the National Environmental Policy Act process.
Bibliography Note:
Includes bibliographical references (p. 104-108).
Type of Report:
Alaska Department of Transportation access analysis.
Citation Reference Notes:
Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage (by chapters and without title) under the category: Alaska Department of Transportation access analysis.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Watana transportation access study, June 2012
Contents:
Introduction -- Previous access route studies -- Access corridor identification -- Screening -- Summary of findings -- Airport.
Go to:Top of Page