Cover image for Probable maximum flood (PMF) study, Study plan Section 16.5, Initial Study Report
Probable maximum flood (PMF) study, Study plan Section 16.5, Initial Study Report
Title:
Probable maximum flood (PMF) study, Study plan Section 16.5, Initial Study Report
JLCTITLE245:
prepared for Alaska Energy Authority ; prepared by MWH [i.e. MWH Americas, Inc.?].
Uniform Title:
Initial Study Report. Study plan Section 16.5, Probable maximum flood (PMF) study. Draft.
Edition:
Draft.
Publication Information:
[Anchorage : Alaska Energy Authority, 2014]
Physical Description:
v, 41 p. : col. ill., col. maps, col. charts ; 28 cm.
General Note:
"February 2014."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 207.
Abstract:
An inflow design flood for the proposed Watana Dam in the Susitna River watershed will be based on the "probable maximum flood" (PMF), which is modeled in this study. The inflow design flood is used in the design of spillways and other structures. The PMF inflow hydrograph will be routed through the reservoir and be used to size the spillway and determine the crest level of the dam to ensure flood safety of the dam. The PMF results from the Probable Maximum Precipitation (PMP), which is also developed as a part of this study, and other coincident conditions including snowmelt.
Bibliography Note:
Includes bibliographical references (p. 19).
Added Corporate Author:
Type of Report:
Draft initial study report.
Citation Reference Notes:
Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft initial study report.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Initial Study Report. Probable maximum flood (PMF) study (16.5)
Go to:Top of Page