Skip to:ContentBottom
Cover image for Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement
Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement
Title:
Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement
JLCTITLE245:
Subtask 2.10, Access planning study. Supplement / prepared for Acres American Incorporated ; prepared by R & M Consultants, Inc.
Publication Information:
[Anchorage, Alaska] : Alaska Power Authority, [1982]
Physical Description:
174 leaves in various foliations (some folded) : maps ; 28 cm.
General Note:
At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

This work supplements a report that has been assigned document no. 3 in Susitna Hydroelectric Project document index.

"September 1982."
Abstract:
"The major items found in this supplement are: 1) Additional segments needed for new plans discussed (chapter nine); 2) New plans discussed (chapter ten); 3) Segment, terrain unit, and environmental concerns maps in appendices updated to show new routes; 4) Cost estimates generated for new plans (appendix F); 5) Plan eleven has been revised to include a low level crossing at Devil Canyon for access to the camp on the south side."--Leaf ii.
Added Corporate Author:
Citation Reference Notes:
Assigned APA document no. 9 in Susitna Hydroelectric Project document index. Also assigned no. 1590 (duplicate entry).
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement

Portion of title: Surveys and site facilities. Subtask 2.10, Access planning study. Supplement

Subtask 2.10, Access planning study. Supplement

Access planning study. Supplement

Cover title: Susitna Hydroelectric Project. Access planning study. Supplement

Caption title: Alaska Power Authority, Susitna Hydroelectric Project. Access planning study. Supplement
Contents:
Introduction -- Summary -- Scope of work -- Previous studies -- Project design -- Project schedule -- Logistics requirements -- Access route design parameters -- Corridor selection -- Access plan -- Conclusions & recommendations -- Appendices.
Go to:Top of Page