[2013]
The goal of the regional economics study plan is to assess potential changes in regional economic conditions in the study area resulting from the
Regular print
[2012]
This Proposed Study Plan (PSP) contains a total of 58 individual study plans that have been prepared in consultation with licensing participants.
Regular print
[2012]
The air quality study will assess the current conditions of the project area against applicable state and national air quality standards and eval
Regular print
[2012]
The goals and objectives of the multi-year riparian study are to: (1) identify and map riparian plant communities and characterize riparian physi
Regular print
[2012]
This document provides the Alaska Energy Authority's (AEA) Revised Study Plan (RSP) for original licensing of the proposed Susitna-Watana Hydroel
Regular print
[2012]
The goal of the study is to evaluate the effects of the Susitna-Watana Hydroelectric Project on the geomorphology of the Susitna River. The resul
Regular print
[2012]
The riparian instream flow study will develop and apply a modeling approach to assess the response of riparian vegetation to Project-induced chan
Regular print
[2012]
Construction and operation of the Susitna-Watana Hydroelectric Project has the potential to alter aquatic habitats in the mainstem channel at tri
Regular print
[2012]
The objectives of the regional economic evaluation are to assess economic conditions and determine possible changes in regional economic conditio
Regular print
[2012]
The goals of the multi-year invasive plant study are to: (1) assess the extent to which invasive plant species have already established in the Su
Regular print
[2014]
This cover letter accompanies fourteen attachments. Six attachments (Attachments A-F) are two-part reports on Initial Study Report (ISR) Meetings
Regular print
[2012]
The objective of this study is to evaluate the potential effects of the Project-induced changes in flow and water surface elevation on free acces
Regular print