[1980]
Several road and rail access corridors to the proposed Susitna River dams sites are evaluated in terms of design speed, grade, curvature, and des
Regular print
[1982]
Content Time Period
d198110 d198209
Regular print
[1982]
Content Time Period
d198110 d198209
Regular print
[1982]
Content Time Period
d198110 d198209
Regular print
[1982]
Content Time Period
d198110 d198209
Regular print
[1982]
The Tyone River Station climate data ends on May 13, 1982 when the station was relocated to become the Sherman Station. It was located about five
Content Time Period
d198110 d198205
Regular print
[1982]
The Sherman Station began recording on May 15, 1982 after the Tyone River Station was relocated to become the Sherman Station. It is located at S
Content Time Period
d198205 d198209
Regular print
[1982]
The Eklutna Station was installed on June 3, 1982 at the southern end of Eklutna Lake. It is the only project climate station located outside of
Content Time Period
d198206 d198209
Regular print
[1981]
Final draft.
A closeout report on the results from surveys of river cross-sections on the Susitna River from Deadman Creek to Talkeetna to define the river gr
Regular print
[1982]
"The purpose of this report is to present the results of analyses of sedimentation within the proposed Watana and Devil Canyon Reservoirs."--Leaf
Regular print