[1981]
In November 1979 the Alaska Power Authority (APA) contracted Acres American Inc. to produce a feasibility plan for the Susitna Hydroelectric Proj
Regular print
[1985]
"This document comprises Volume II of the Instream Flow Relationships Report (IFRR), a two-volume series on instream flow processes in the middle
Regular print
[1983]
Final draft.
This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations a
Regular print
[1983]
Preliminary draft.
This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations a
Regular print