Cover image for Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report
Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report
Title:
Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report
JLCTITLE245:
prepared by MWH [i.e. MWH Americas, Inc.?].
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2015]
Physical Description:
751 pages in various pagings : color illustrations, color maps ; 28 cm. and 28 x 43 cm.
General Note:
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

"October 2015."

ARLIS assigned report number: SuWa 289.

Some figures of attachments 2 and 7 and all contents of attachments 4 and 5 have not been released in accordance with FERC's orders numbered 630-A and 769. Placeholder pages substitute for those sections.

The page count total of 751 constitutes only the publicly released pages.

Attachment 1 has a formal title page: Susitna-Watana Hydroelectric Project geology and soils - interim mineral resource assessment report / prepared by Golder Associates Inc. for MWH ; [prepared by Ryan Campbell]. 2014. -- (Technical memorandum ; 14-030TM). -- v0.0. -- AEA11-022.

Attachment 2 has a formal title page: Watana Dam exploration and testing program work plan 2014-2015 / prepared by MWH ; [prepared by Paul Richards, Todd Loar, Justin Peterson]. 2013. -- (Technical memorandum ; no. 11). "NTP 11." -- v0.0. -- AEA11-022.

Attachment 8 has a formal title page: Susitna-Watana Hydroelectric Project Seismic Network 2014 annual seismicity report / prepared by Fugro Consultants, Inc. for MWH ; [prepared by Roland LaForge]. 2015. -- (Technical memorandum ; 14-32-REP). -- V0.0. -- AEA11-022.

Attachment 3 has a formal title page: Preliminary reservoir slope stability assessment / prepared by MWH ; [prepared by Jennifer Van Pelt, Eric Zimmerman, Corey Bolen]. September 18, 2013. -- (Technical memorandum ; no. 12). "NTP 11." -- v0.0. -- AEA11-022.

Attachment 6 has a formal title page: Regional geologic analysis / prepared by Golder Associates Inc. for MWH ; [prepared by Robert G. Dugan, Ryan L. Campbell]. 2013. -- (Technical memorandum ; no. 9). "NTP 11." -- V0.0. -- AEA11-022.

Attachment 7 has a formal title page: Susitna-Watana Hydroelectric Project crustal seismic source evaluation / prepared by Fugro Consultants, Inc. for MWH ; [prepared by Justin Pearce, Cooper Brossy, Mark Zellman, Dean Ostenaa]. 2015. -- (Report ; 14-33-REP). -- v0.0. -- AEA11-022.

Attachment 9 has a formal title page: Susitna-Watana seismic monitoring project January-June 2015 report / prepared by Alaska Earthquake Center, University of Alaska Fairbanks, Geophysical Institute. 2015. -- v0.0.
Abstract:
This report describes the Alaska Energy Authority's progress in the Geology and soils characterization study during 2014 and early 2015 being conducted for the proposed Susitna-Watana Hydroelectric Project. The purpose of the study is to define existing geological conditions at the dam site, reservoir, and access and transmission corridors; to develop design criteria to support the engineering feasibility studies; and to provide baseline spatial data for the various related studies for the Project. The study area includes the dam site area, reservoir area, construction material sources, tailwater downstream of the dam, access road and transmission line corridors, airport facilities, and construction camp and permanent village sites.
Bibliography Note:
Includes bibliographical references.
Added Corporate Author:
Added Title Contained Works:
Watana Dam exploration and testing program work plan 2014-2015.

Preliminary reservoir slope stability assessment.

Susitna-Watana Hydroelectric Project geology and soils - interim mineral resource assessment report.

Regional geologic analysis.

Susitna-Watana Hydroelectric Project Seismic Network 2014 annual seismicity report.
Added Uniform Title:
Preceded by (expression): Geology and soils characterization study, Study plan Section 4.5, Initial Study Report.
Added Uniform Title Contained Work:
Susitna-Watana Hydroelectric Project crustal seismic source evaluation.

Susitna-Watana seismic monitoring project January-June 2015 report.
Type of Report:
November 2015; Study Completion and 2014/2015 Implementation Reports.
Citation Reference Notes:
Listed in December 2015 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 2015; Study Completion and 2014/2015 Implementation Reports.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Linking Entry Complexity Note:
Preceded by: Geology and soils characterization study, Study plan Section 4.5, Initial Study Report. June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223).
Variant Title:
Running title: 2014-2015 Study Implementation Report. Geology and soils characterization study (Study 4.5)
Contents:
Introduction -- Study objectives -- Study area -- Methods and variances in 2014 -- Results -- Discussion -- Conclusion -- attachment 1. Interim mineral resource assessment report -- attachment 2. Exploration and testing program work plan 2014-2015 -- attachment 3. Preliminary reservoir slope stability assessment -- attachment 4. Geotechnical dam report -- attachment 5. Dam site geology -- attachment 6. Regional geologic analysis -- attachment 7. Crustal seismic source evaluation -- attachment 8. Seismic Network 2014 annual seismicity report -- attachment 9. Seismic monitoring project January-June 2015 report.