[1979]
"The proposed action discussed in this draft environmental impact statement is a two-dam system located in the Upper Susitna River Basin, which w
Electronic resource
1983]
Exhibit E of the Application for license for the Susitna Hydroelectric Project considers all aspects of construction and operation of the propose
Regular print
[1984]
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct
Regular print
[1984]
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct
Regular print
[1987]
Draft.
"The general objective of this study was to determine the probable nature and approximate magnitude of impacts of the proposed Susitna River hydr
Regular print
[1984]
"Although the license application has been accepted by the FERC for review, various terrestrial studies and activities are still needed to assure
Microform
[1985]
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct
Regular print
[1985]
Revision 1.
This document provides an overview of potential effects of the Susitna Hydroelectric Project on wildlife and botanical resources of the project a
Electronic resource
[1984]
Revision 0.
This document provides an overview of potential effects of the Susitna Hydroelectric Project on wildlife and botanical resources of the project a
Regular print
[1983]
Revision 0, Draft.
This document provides an overview of potential effects of the Susitna Hydroelectric Project on wildlife and botanical resources of the project a
Electronic resource