Skip to:ContentBottom
Cover image for Acres Task 6, Watana & Devil Canyon tunnel rating calculations.
Acres Task 6, Watana & Devil Canyon tunnel rating calculations.
Title:
Acres Task 6, Watana & Devil Canyon tunnel rating calculations.
Publication Information:
[Buffalo, N.Y. : Acres American Incorporated, 1983]
Physical Description:
[15] p. : ill. ; 28 cm.
General Note:
Title from binder of one copy.

Series statement from label on cover.

First sheet (the document transmittal sheet) is an imperfect reproduction; some text is not readable due to parts of that page being blanked out.

This document comprises calculation sheets completed by DC [i.e. David Crawford, Head Hydraulic Engineer] and RJS at Acres American Incorporated. The sheets are dated September and October 1981. (Some sheets are undated and give no credit.) The sheets were compiled by David Crawford on March 9, 1983 for Wayne Coleman.
Added Corporate Author:
Citation Reference Notes:
Assigned APA Document no. 80 in the Susitna Hydroelectric Project document index.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Title on subject line on document transmittal sheet (inferred from first 13 letters only due to poor reproduction): Engineering calculations

Title in the Susitna Hydroelectric Project document index: Watana & Devil Canyon tunnel rating calculations
Funding Information:
Acres Job No. P5701.70
Go to:Top of Page