258 Results Found Subscribe to search results
000000000000ARLIS
Print
1985.
"At the request of the Alaska Power Authority, a study was undertaken to quantify the intensity of the archeological survey and site occurrence b
Microform
[1981]
Introduction. Study objective ; Report contents -- Summary. Watana/Devil Canyon cost estimates ; Transmission line cost estimates ; Conclusions -
Regular print
[1984]
[Draft].
Regular print
[1985]
This report presents the methodology and results of a survey of households located in Talkeetna, Trapper Creek, Cantwell, and Healy. The survey i
Regular print
[1986]
Date, time, total dissolved gas (mmHg), and water temperature in Celsius were monitored from July 15 to Sept. 21, 1984 at river mile 136 of the S
Regular print
[1984]
"Although the license application has been accepted by the FERC for review, various social science program studies and activities are still neede
Regular print
[1984]
[January 1984 draft report].
River stage fluctuations due to alternative operations of the Watana Dam are estimated for the Susitna River from the Devil Canyon damsite to the
Regular print
Limit Search Results
Author
Subject
Publication Date
This graph shows the distribution of publication dates for use with a date range slider. Switch to Years view for a more detailed breakdown of search results by year.
-
Language
Audience
Go to:Search ResultsTop of PageSearch Facets