[2011]
This technical memorandum summarizes existing hydrologic data at various points along the Susitna River, its tributaries, and the Little Susitna
Regular print
[2010]
[2010 version].
Electronic resource
[2009]
[2009 version].
Electronic resource
2011-
[News releases about the Susitna-Watana Hydroelectric Project]. Alaska Energy Authority hires project manager : Wayne Dyok joins Susitna-Watana Hydroelectric team. Major step for Susitna-Watana Hydroelectric Project. AEA reaches Susitna-Watana Hydro milestone : revised study plan filed after months of stakeholder engagement. FERC approves 44 Susitna-Watana Hydro study plans.
Regular print
[2014]
This engineering feasibility report for the Susitna-Watana Hydroelectric Project has been prepared to support the licensing process. It provides
Regular print
[2013]
This atlas shows the river miles and river mile tenths for the mainstem middle Susitna River (from river mile 97 just south of Talkeetna) to 239
Atlas
JLC Title 245h
[cartographic material]
2013 January 7.
This document is a responce to the Federal Energy Regulatory Commission Staff's December 31, 2012 letter to the Alaska Energy Authority (AEA) reg
Regular print
[2012]
As part of the Susitna-Watana Hydroelectric Project licensing process, Alaska Energy Authority (AEA) shot low-altitude video of tributaries and m
Electronic resource
[2012?]
Proposals on research steps to be taken and management goals for caribou (specifically the Nelchina and Delta herds), moose, and ptarmigan. The f
Regular print
[2014]
This letter summarizes the discussion of the fourth Susitna-Watana Hydroelectric Project Independent Board of Consultants held April 2-4, 2014, a
Regular print
[2012]
The goal of this study is to compile and analyze baseline information on the harvests of resident and anadromous fishes in and downstream of the
Regular print