Switch to list view
Switch to thumbnail view
7 Results Found Subscribe to search results
0000000ARLIS
Print
[1981]
In November 1979 the Alaska Power Authority (APA) contracted Acres American Inc. to produce a feasibility plan for the Susitna Hydroelectric Proj
Regular print
[1981]
An identification and evaluation of baseline streamflow and water quality conditions, and the nature and extent of both existing and anticipated
Regular print
[1981]
[Working document version].
In November 1979 the Alaska Power Authority (APA) contracted Acres American Inc. to produce a feasibility plan for the Susitna Hydroelectric Proj
Regular print
[1982]
[Final].
Streamflow is measured to determine possible effects of a hydroelectric dam on salmon passage to spawning areas in the Susitna River near Talkeet
Regular print
[1985]
[Draft].
"This report provides an assessment of the potential effects of the with-project flow regime downstream of the Chulitna-Susitna-Talkeetna conflue
Regular print
[1982]
[Draft].
Streamflow is measured to determine possible effects of a hydroelectric dam on salmon passage to spawning areas in the Susitna River near Talkeet
Regular print
Limit Search Results
Format
Publication Date
This graph shows the distribution of publication dates for use with a date range slider. Switch to Years view for a more detailed breakdown of search results by year.
-
Language
Audience
Go to:Search ResultsTop of PageSearch Facets