[1981]
In November 1979 the Alaska Power Authority (APA) contracted Acres American Inc. to produce a feasibility plan for the Susitna Hydroelectric Proj
Regular print
[1981]
An identification and evaluation of baseline streamflow and water quality conditions, and the nature and extent of both existing and anticipated
Regular print
[1982]
Regular print
[1981]
[Working document version].
In November 1979 the Alaska Power Authority (APA) contracted Acres American Inc. to produce a feasibility plan for the Susitna Hydroelectric Proj
Regular print
[1982]
[Final].
Streamflow is measured to determine possible effects of a hydroelectric dam on salmon passage to spawning areas in the Susitna River near Talkeet
Regular print
[1985]
[Draft].
"This report provides an assessment of the potential effects of the with-project flow regime downstream of the Chulitna-Susitna-Talkeetna conflue
Regular print
[1982]
[Draft].
Streamflow is measured to determine possible effects of a hydroelectric dam on salmon passage to spawning areas in the Susitna River near Talkeet
Regular print