[2014]
Draft.
This study is being conducted to develop a fish passage strategy in support of the license application for the Susitna-Watana Hydroelectric Proje
Regular print
[2013]
The construction and operation of the Susitna-Watana Hydroelectric Project will affect Susitna River flows downstream of the dam; the degree of t
Regular print
2014]
Draft.
Construction and operation of the proposed Susitna-Watana Hydroelectric Project requires temporary and permanent infrastructure (access roads, tr
Electronic resource
[2014-2015]
Construction and operation of the proposed Susitna-Watana Hydroelectric Project requires temporary and permanent infrastructure (access roads, tr
Regular print
[2013]
Electronic resource
[2014-2015]
The purpose of this study is to predict the fish community that will develop in the reservoir created in the Susitna-Watana Hydroelectric Project
Regular print
2014]
Draft.
The purpose of this study is to predict the fish community that will develop in the reservoir created in the Susitna-Watana Hydroelectric Project
Electronic resource
[2013]
The overall objective of this technical memorandum is to describe the rationale and basis for the final selection of the focus areas and study si
Regular print
[2013]
Specific objectives of this technical memorandum include: (1) review the general approach to stratification and the study site selection process
Regular print