Skip to:ContentBottom
Cover image for Task 2, Project access. Subtask 2.10, Preliminary report. Access plan
Task 2, Project access. Subtask 2.10, Preliminary report. Access plan
Title:
Task 2, Project access. Subtask 2.10, Preliminary report. Access plan
JLCTITLE245:
Subtask 2.10, Preliminary report. Access plan / prepared for Alaska Power Authority and Acres American, Incorporated ; prepared by R & M Consultants, Inc.
Publication Information:
[Anchorage, Alaska] : R & M Consultants, [1981]
Physical Description:
82 leaves (some folded) : maps ; 28 cm
General Note:
At head of title: Susitna Hydroelectric Project, plan of study.

"February 1981."
Abstract:
"This report is intended to serve as a detailed outline of the final access plan to be published about May 1, 1981"--Leaf 2.
Added Corporate Author:
Citation Reference Notes:
Alaska Resources Library and Information Services has assigned APA no. 4008 to this document for the Susitna Hydroelectric Project collection.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Susitna Hydroelectric Project. Plan of study. Task 2, Project access. Subtask 2.10, Preliminary report. Access plan

Plan of study. Task 2, Project access. Subtask 2.10, Preliminary report. Access plan

Portion of title: Project access. Subtask 2.10, Preliminary report. Access plan

Subtask 2.10, Preliminary report. Access plan

Preliminary report. Access plan

Access plan

Caption title: Susitna Hydroelectric Project. Project access. Preliminary report. Access plan
Contents:
Introduction -- Project parameters -- Corridor selection -- Project design development -- Project schedule -- Logistics -- Environmental issues -- Alternative access plans -- Analysis -- Recommended plan -- appendix A. Proposed corridors -- appendix B. Alternative comparison -- appendix C. Preliminary design development -- appendix D. Macroscale environmental concerns pertaining to access -- appendix E. Proposed access plan.
Go to:Top of Page