Switch to list view
Switch to thumbnail view
55 Results Found Subscribe to search results
000000000000ARLIS
Print
[1982]
"Presented are approaches to mitigate impacts predicted to occur if the Susitna hydroelectric project is constructed. This paper does not, howeve
Regular print
[1979]
"The proposed action discussed in this draft environmental impact statement is a two-dam system located in the Upper Susitna River Basin, which w
Electronic resource
2012.
Crosswalk tables (attached to this letter) document how the objectives and methodologies of the USFWS and NMFS' original study requests--dating b
Electronic resource
1983]
Exhibit E of the Application for license for the Susitna Hydroelectric Project considers all aspects of construction and operation of the propose
Regular print
[2012]
The goals and objectives of the multi-year riparian study are to: (1) identify and map riparian plant communities and characterize riparian physi
Regular print
[1980]
This document describes the research methodology for studying furbearing animals within a designated study area that represents where these anima
Regular print
[1984]
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct
Regular print
[1984]
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct
Regular print
[1988]
"The general objective of this study was to determine the probable nature and approximate magnitude of impacts of the proposed Susitna River hydr
Regular print
Limit Search Results
Author
Format
Subject
Publication Date
This graph shows the distribution of publication dates for use with a date range slider. Switch to Years view for a more detailed breakdown of search results by year.
-
Language
Audience
Go to:Search ResultsTop of PageSearch Facets