1982.
Draft.
A draft summary report of the Feasibility Study of the Susitna Hydroelectric Project proposed by the Alaska Power Authority and intended for the
Book
[1984]
[Final].
This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations a
Regular print