1980-1982.
The Susitna hydro studies. Fairbanks, Anchorage and Railbelt face major energy decision November 1980 Preliminary findings available on Susitna basin seismicity September 1981 Interviews with eminent scientists, engineers and economist give insight into proposed Susitna Hydroelectric Project November 1981 Preliminary information available on fish and wildlife impacts January 1982
Serial
Other
Microform
Regular print
[1982]
Final draft.
A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost
Regular print
[1982]
Final draft.
Presents the results of studies conducted to date by Acres to determine the optimum location of the access route.
Electronic resource
[1982]
The included map shows recommended vehicle and rail routes to access the construction site of the proposed Susitna Hydroelectric Project. These r
Microform