[2012]
The goal of the study is to evaluate the effects of the Susitna-Watana Hydroelectric Project on the geomorphology of the Susitna River. The resul
Regular print
[2012]
The goal of the water quality studies is to assess the effects of the proposed Project on water quality in the Susitna River basin and to identif
Regular print
[2012]
The goals and objectives of the multi-year riparian study are to: (1) identify and map riparian plant communities and characterize riparian physi
Regular print
[2012]
The air quality study will assess the current conditions of the project area against applicable state and national air quality standards and eval
Regular print
[2012]
The riparian instream flow study will develop and apply a modeling approach to assess the response of riparian vegetation to Project-induced chan
Regular print
[2012]
The goals of the multi-year invasive plant study are to: (1) assess the extent to which invasive plant species have already established in the Su
Regular print
[2012]
The Alaska Energy Authority is preparing a license application for the Susitna-Watana Hydroelectric Project. Construction and operation of the pr
Electronic resource
[2012]
The goal of the study is to model the effects of the Susitna-Watana Hydroelectric Project on the fluvial geomorphology of the Susitna River. The
Regular print
[2012]
The goal of this study is to describe the baseline condition of the aquatic environment in the vicinity of the Project including access roads, tr
Regular print
[2012]
The objective of this study is to evaluate the potential effects of the Project-induced changes in flow and water surface elevation on free acces
Regular print
[2012]
Scoping Document 1 is intended to advise all participants of the proposed scope of the environmental impact statement (EIS) and to seek additiona
Electronic resource