Switch to list view
Switch to thumbnail view
8 Results Found Subscribe to search results
00000000ARLIS
Print
2010]
Describes environmental issues, energy generation, and cost estimates in regards to the Chakachamna Hydroelectric Project and the Susitna Hydroel
Regular print
2010]
Describes engineering, environmental, and regulatory issues in regards to the Susitna Hydroelectric Project (the Low Watana non-expandable altern
Regular print
2010?]
This table presents a summary of the comparative operational uncertainties asosciated with developing the Chakachamna and Susitna (Low Watana imp
Regular print
2010]
Describes the Susitna Hydroelectric Project (Low Watana non-expandable alternative) and the Chakachamna Hydroelectric Project.
Regular print
[1983]
[March 1983 ed.].
This report describes plans for hydroelectric power generation by diverting water from Lake Chakachamna through a tunnel. One method is to divert
Regular print
1983.
[February 1983 ed.].
This report describes plans for hydroelectric power generation by diverting water from Lake Chakachamna through a tunnel. One method is to divert
Regular print
[1982]
This report describes plans for hydroelectric power generation by diverting water from Lake Chakachamna through a tunnel southeasterly to a power
Electronic resource
[1981]
This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile l
Electronic resource
Limit Search Results
Format
Publication Date
This graph shows the distribution of publication dates for use with a date range slider. Switch to Years view for a more detailed breakdown of search results by year.
-
Language
Audience
Go to:Search ResultsTop of PageSearch Facets