Skip to:ContentBottom
Cover image for Interim report, November 30, 1981
Interim report, November 30, 1981
Title:
Interim report, November 30, 1981
JLCTITLE245:
Bechtel Civil & Minerals, Inc.
Publication Information:
San Francisco : Bechtel Civil & Minerals, Inc., [1981]
Physical Description:
350 leaves in various foliations : ill., maps, charts ; 28 cm.
General Note:
At head of title: Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project.
Abstract:
This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile long tunnel or easterly down the Chakachatna Valley either by a 12-mile tunnel or by dam and tunnel.
Bibliography Note:
Includes bibliographical references (p. 3-13 - 3-14, 5-75 - 5-82, and 6-150 - 6-156).
Added Corporate Author:
Citation Reference Notes:
Assigned APA Document no. 533 in the Susitna Hydroelectric Project document index. This report was used as supporting documentation in research by the Susitna Hydroelectric Project.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project. Interim report, November 30, 1981
Funding Information:
Job 14879
Go to:Top of Page