Susitna River productivity study implementation plan
Title:
Susitna River productivity study implementation plan
JLCTITLE245:
prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc.
Publication Information:
[Anchorage : Alaska Energy Authority, 2013]
Physical Description:
147 p. in various pagings : ill. (some col.), maps (some col.), forms ; 28 cm.
General Note:
"March 1, 2013."
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."
ARLIS assigned report number: SuWa 200.
Section 9.8a of the Final study plan.
Abstract:
Operations of the proposed Susitna-Watana Hydroelectric Project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The chief goal of this study is to collect baseline data to assist in evaluating the potential Project-induced changes in flow and effects on environmental factors (e.g. temperature, substrate, water quality) and benthic macroinvertebrate and algal communities in the middle and lower Susitna River. This document describes research methods and sampling protocols.
Bibliography Note:
Includes bibliographical references (p. 51-63).
Subject Term:
Added Corporate Author:
Type of Report:
Final study plan.
Citation Reference Notes:
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Productivity study implementation plan