Cover image for Subtask 6.05, Development selection report.
Subtask 6.05, Development selection report.
Title:
Subtask 6.05, Development selection report.
Edition:
1st draft.
Publication Information:
[Anchorage, Alaska] : [Alaska Power Authority], [1981]
Physical Description:
[348] p. : ill., maps ; 28 cm.
General Note:
At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"February 13, 1981."
Added Corporate Author:
Added Title Contained Works:
Preliminary environmental assessment of tunnel alternatives.

Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin.
Citation Reference Notes:
Assigned APA Document no. 1281 in the Susitna Hydroelectric Project document index.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Portion of title: Development selection report

Cover title: Alaska Power Authority, Susitna Hydroelectric Project. Subtask 6.05, Development selection report
Contents:
Introduction -- Summary -- Conclusions and recommendations -- Previous studies -- Railbelt load forecasts -- Susitna Basin studies -- Generation expansion plan -- Engineering studies -- Susitna hydroelectric development -- Appendices: B. Hydropower simulation model results -- C. Generation planning model results -- D. Task 2 status report -- E. Task 3 status report -- F. Task 4 status report -- G. Task 5 status report -- I. TES reports on environmental impacts associated with the tunnel, Watana/Devil Canyon and High Devil/Vee redevelopment plans: Preliminary environmental assessment of tunnel alternatives / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. December 15, 1980 -- Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin / by Terrestrial Environmental Specialists, Inc. for Acres American Incorporated. January 16, 1981.