[1980]
Describes research in various areas (hydrology, seismicity, design, environment, transmission, etc.) that is being planned for determining the fe
Regular print
[1981]
Describes research in various areas (hydrology, seismicity, design, environment, etc.) that is being planned for determining the feasibility of t
Regular print
[1980]
This document contains the first set of revisions to (but does not replace) the earlier revised draft of the study plan for the Susitna Hydroelec
Regular print
[2012]
This Proposed Study Plan (PSP) contains a total of 58 individual study plans that have been prepared in consultation with licensing participants.
Regular print
[2012]
This document provides the Alaska Energy Authority's (AEA) Revised Study Plan (RSP) for original licensing of the proposed Susitna-Watana Hydroel
Regular print
2012]
A table of responses from AEA to comments from organizations on AEA's Proposed study plan submitted to FERC. Those organizations include 13 state
Regular print
2012]
A table of responses from AEA to comments from 27 organizations and a few individual persons on AEA's Proposed study plan submitted to FERC. Thos
Regular print