1984 Aug. 31.
This memorandum is a log of interviews conducted on August 27, 1984 with two persons--Wayne Holley of Talkeetna Roadhouse and Steve Mahay of Maha
Regular print
[1982]
"The objective of this task was to study the Susitna River reach below the proposed dams to establish the natural streamflow regime and predict p
Regular print
[1983]
Final draft.
This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations a
Regular print
[1985]
Microform
[1986]
Microform
JLC Title 245h
[microform]
[1983]
Preliminary draft.
This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations a
Regular print