[1979]
In order to study potential effects of proposed hydroelectric development in the Devils Canyon area of the Susitna River, baseline information on
Regular print
[1983]
"Objectives of this study were to determine the probable nature and approximate magnitude of impacts of the proposed Susitna River hydroelectric
Regular print
[1985]
This is the third annual report of ongoing Phase II studies assessing the impacts of the proposed Susitna Hydroelectric Project on moose populati
Regular print
1978.
Between October 1976 and March 1977 radio and visual collars were placed on moose along the Susitna River between the Maclaren River and Devil Cr
Regular print