Skip to:ContentBottom
Cover image for Environmental studies procedures manual. Subtask 7.14, Access road analysis
Environmental studies procedures manual. Subtask 7.14, Access road analysis
Title:
Environmental studies procedures manual. Subtask 7.14, Access road analysis
JLCTITLE245:
Subtask 7.14, Access road analysis / submitted by Terrestrial Environmental Specialists, Inc. to Acres American, Inc.
Publication Information:
[Phoenix, N.Y.] : Terrestrial Environmental Specialists, [1980?]
Physical Description:
[iii], 3, [1] leaves ; 28 cm.
General Note:
At head of title: Alaska Power Authority, Susitna Hydroelectric Project.
Abstract:
This procedure manual describes the research methodology for conducting a study for the proposed Susitna Hydroelectric Project. The purposes of the study are to select an environmentally sound access road to the dam sites planned for the Susitna Hydroelectric Project and to provide an impact assessment of the preferred access route and of dam facilities such as borrow areas and connecting haul roads.
Added Corporate Author:
Citation Reference Notes:
Assigned APA document no. 1323 in Susitna Hydroelectric Project document index.
Additional Physical Form Available:
Available also in microfiche format and electronic format on the Internet.
Variant Title:
Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies procedures manual. Subtask 7.14, Access road analysis

Portion of title: Subtask 7.14, Access road analysis

Access road analysis
Go to:Top of Page