Skip to:ContentBottom
Cover image for Preliminary report on the continuation of feasibility studies : submitted to the Alaska Legislature and Governor Hammond
Preliminary report on the continuation of feasibility studies : submitted to the Alaska Legislature and Governor Hammond
Title:
Preliminary report on the continuation of feasibility studies : submitted to the Alaska Legislature and Governor Hammond
JLCTITLE245:
Alaska Power Authority.
Publication Information:
[Alaska] : Alaska Power Authority, [1981]
Physical Description:
147 p. in various pagings : ill., map ; 28 cm.
General Note:
At head of title: Susitna Hydroelectric Project

Title page is preceded by an 8-page executive summary and three cover letters (8 p.) from the Alaska Power Authority Board chairman, the External Review Panel, and a consultant company.

"March 30, 1981."

"March, 1981"--Cover.

Assigned document no. 2390 in Susitna Hydroelectric Project document index.

Assigned AEIDC document no. SUS 64.
Abstract:
An overview of the tentative findings of the Alaska Power Authority regarding the advisability of developing the hydropower potential of the Susitna River to meet the energy needs of Alaska's "railbelt" region. Report includes load requirements, seismic risks, environmental implications and economic feasibility.
Bibliography Note:
Includes bibliographical references.
Added Corporate Author:
Citation Reference Notes:
Assigned APA Document no. 2390 in Susitna Hydroelectric Project document index.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Susitna Hydroelectric Project, preliminary report on the continuation of feasibility studies : submitted to the Alaska Legislature and Governor Hammond

Cover title: Susitna Hydroelectric Project mid report to Governor Jay S. Hammond and the Legislature of the State of Alaska
Contents:
Purpose -- Report format -- Introduction -- Decison criteria -- Load requirements -- Seismic risks -- Environmental implications -- Economic feasibility -- Project financing -- Permit requirements and construction schedule -- Public participation -- Land status and native involvement.