1983]
This document is a collection of geotechnical papers on aspects of rock mechanics for the diversion tunnel at the Watana dam (part of the Susitna
Regular print
[1978]
[Final].
Plan of study presenting a program of activities for project feasibility analysis of hydroelectric development in the upper Susitna River basin i
Regular print
[1981]
An overview of the tentative findings of the Alaska Power Authority regarding the advisability of developing the hydropower potential of the Susi
Electronic resource
[1982]
Final draft.
A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost
Regular print
[1985]
A collection of brief statements that are positions of the Alaska Power Authority on fishery aspects of the planned Susitna Hydroelectric Project
Regular print