[1959]
This memorandum was written in response to a request on Oct. 22, 1958 to conduct inflow design flood studies for the Devil Canyon Project. This s
Regular print
[1982]
Content Time Period
d19800718 d19810930
Regular print
1952-1965.
This collection contains reports originally released separately between 1952 and 1965 that describe fish and wildlife species in the Susitna Rive
Regular print
1985]
This paper describes current recreational use of the Susitna River in its whitewater reaches (between the Denali Highway to the Parks Highway), t
Regular print
[1982]
This report presents the results of a multi-disciplinary assessment of tradeoffs between the major environmental concerns and project cost, sched
Regular print
[1959]
This memorandum was written in response to a request on Dec. 21, 1962 to conduct inflow design flood studies for the proposed Vee Dam. This study
Regular print