[1982]
This document contains the outlines of discussion, charts, maps, and cross-sections presented at the fifth meeting of the Susitna Hydroelectric P
Electronic resource
[1980]
This document contains the agenda and supporting material for the first meeting of the Susitna Hydroelectric Project Internal Review Board (also
Electronic resource
[1982]
This is an information package prepared for the Susitna Hydroelectric Project External Review Panel Meeting held November 18-19, 1982 in Anchorag
Electronic resource
[1980]
A collection of papers presented at the second Susitna Hydroelectric Project Internal Review Board Meeting. The papers, made by Acres American In
Electronic resource
[1981]
This is a collection of two documents reporting on the second and third meetings of the Susitna Hydroelectric Project External Review Panel. Thes
Electronic resource
[1980]
This report details the first of a series of meetings to familiarize the Specialist Consultants Panel with the Susitna Hydroelectric Project feas
Electronic resource
[1982]
This document contains a series of reports and comments of the Alaska Power Authority's External Review Panel on the Susitna Hydroelectric Projec
Regular print
[1985]
This document represents a meeting presentation. It outlines construction details on the Watana Dam and Devil Canyon Dam, required and planned ac
Regular print
[1980]
This document contains the results of the first meeting of the Susitna Hydroelectric Project Internal Review Board (also called "Internal Review
Electronic resource
[1981]
This report contains the information package for the third External Review Panel Meeting. By comparison, APA Documents 2359 contains the full pro
Electronic resource