Switch to list view
Switch to thumbnail view
5 Results Found Subscribe to search results
00000ARLIS
Print
[2012]
Construction and operation of the Susitna-Watana Hydroelectric Project has the potential to alter aquatic habitats in the mainstem channel at tri
Regular print
[2012]
The goal of this study is to describe the baseline condition of the aquatic environment in the vicinity of the Project including access roads, tr
Regular print
2014]
A study of existing aquatic habitats in the Susitna River watershed is being conducted as part of the planning of the Susitna-Watana Hydroelectri
Regular print
2014]
A study is being conducted on the aquatic habitats in the Susitna River, Alaska as part of the planning of the Susitna-Watana Hydroelectric Proje
Content Time Period 
d2013 d2014
Regular print
JLC Corporate Author 
Initial Study Report Meetings (2014 October 17 : Anchorage, Alaska)
2014]
The discussion at the October 17 meeting covered current efforts on the studies on ice (Study 7.6), instream flow (Studies 8.5 and 8.6), and ripa
Regular print
Limit Search Results
Format
Publication Date
This graph shows the distribution of publication dates for use with a date range slider. Switch to Years view for a more detailed breakdown of search results by year.
-
Language
Audience
Library
Go to:Search ResultsTop of PageSearch Facets