[1981]
Introduction. Study objective ; Report contents -- Summary. Watana/Devil Canyon cost estimates ; Transmission line cost estimates ; Conclusions -
Regular print
[1981]
"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelec
Microform
[1980]
[February 1980 ed.].
An analysis of alternative airfields to be used to supply a camp at the Watana dam site during construction of the Susitna Hydroelectric Project.
Electronic resource
[1981]
"This report is intended to serve as a detailed outline of the final access plan to be published about May 1, 1981"--Leaf 2.
Regular print