97 Results Found Subscribe to search results
000000000000ARLIS
Print
2012.
Crosswalk tables (attached to this letter) document how the objectives and methodologies of the USFWS and NMFS' original study requests--dating b
Electronic resource
[1985]
This technical memorandum presents a framework for conducting the analyses leading to an environmental and economic comparisons report and the su
Electronic resource
[2013]
The overall goal of the geomorphology studies below Watana Dam is to assess the potential effects of the proposed Susitna-Watana Hydroelectric Pr
Regular print
[2012]
The Alaska Energy Authority is preparing a license application for the Susitna-Watana Hydroelectric Project. Construction and operation of the pr
Electronic resource
[1983]
Final draft.
This general investigation memorandum sets forth the objectives, methodology, organization, personnel, schedule, deliverables, and budget for acc
Regular print
[2013]
The goal of this study is to provide a quantitative, spatially-explicit model to predict potential impacts to downstream floodplain vegetation fr
Electronic resource
[2013]
The objectives of the Water Quality Modeling Study are: (1) With input from licensing participants, implement an appropriate reservoir and river
Regular print
[2012]
The goal of the water quality studies is to assess the effects of the proposed Project on water quality in the Susitna River basin and to identif
Regular print
[2014]
Draft.
The objective for Study 5.6 is to develop a water quality model for each of the reservoir and riverine portions of the Susitna-Watana Hydroelectr
Regular print
[2014-2015]
The objective for Study 5.6 is to develop a water quality model for each of the reservoir and riverine portions of the Susitna-Watana Hydroelectr
Regular print
Limit Search Results
Author
Format
Subject
Publication Date
This graph shows the distribution of publication dates for use with a date range slider. Switch to Years view for a more detailed breakdown of search results by year.
-
Language
Audience