[1974?]
The projects constructed wells, a wood frame pumphouse and treatment facility, a 25,000-gallon wood stave water storage tank, and 4,445 ft. of in
Book
1979
"Project AN-71-685A provided the Hooper Bay community with a new watering point. Project AN-71-685B provided the Village of Karluk with water tre
Book
1980
Summary report for the Kaltag Project AN-65-449A (or AN-65-449-1), Kotlik Project AN-65-449B (or AN-65-449-2), Koyuk Project AN-65-449C (or AN-65
Book
1978
Project AN-72-925 and AN-74-146
Project AN-72-925 provided a 1,000,000-gallon water storage tank and two all-terrain vehicles (ATV) with custom-built water, wastewater, and soli
Book
1979
Project AN-76-808EM
"Project AN-76-808EM provided a new well and watering point for Napaskiak to replace the existing one threatened by the eroding river bank. The w
Book
1971
Project AN-67-457
"The Village of Tanacross, Alaska, is located on the Tanana River 180 miles southeast of Fairbanks and about two miles off the Alaska Highway. Th
Book