Search Results for Alaska Power Authority. SirsiDynix Enterprise https://anch.ent.sirsi.net/client/en_US/arlis/arlis/qu$003dAlaska$002bPower$002bAuthority.$0026ps$003d300?dt=list 2024-06-02T20:08:13Z Alaska Power Authority. ent://SD_ILS/0/SD_ILS:1641313 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983?]<br/>Book<br/> Alaska Power Authority : southeast intertie transmission intertie ent://SD_ILS/0/SD_ILS:5808734 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1989<br/>Map of the southeast Alaska and bordering Yukon Territory showing load centers, existing hydroelectric projects and potential hydroelectric projects.<br/>Map<br/> Alaska Power Authority statues and regulations. ent://SD_ILS/0/SD_ILS:1658504 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984?]<br/>Book<br/> Alaska Power Authority, FMUS Chena six repower study. ent://SD_ILS/0/SD_ILS:3451510 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1984?]<br/>Book<br/> Alaska Power Authority Susitna Hydroelectric Project issues list. ent://SD_ILS/0/SD_ILS:1984186 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Regular print<br/> Alaska Power Authority village power system survey ent://SD_ILS/0/SD_ILS:1505760 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1989]<br/>Book<br/> Alaska Energy Authority village power system survey ent://SD_ILS/0/SD_ILS:1540264 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1989?]<br/>Book<br/> Alaska Energy Authority community power system survey ent://SD_ILS/0/SD_ILS:1618629 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1990?]<br/>Book<br/> Alaska Power Authority response to agency comments on license application. ent://SD_ILS/0/SD_ILS:1576424 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983?]<br/>Book<br/> Alaska Power Authority Susitna Hydroelectric Project project overview ent://SD_ILS/0/SD_ILS:3447806 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project, Position paper, fisheries issue F- ... ent://SD_ILS/0/SD_ILS:1418196 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>A collection of brief statements that are positions of the Alaska Power Authority on fishery aspects of the planned Susitna Hydroelectric Project.<br/>Regular print<br/> Alaska Power Authority : summary supplement on railbelt utilities. ent://SD_ILS/0/SD_ILS:3492412 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1987.<br/>Book<br/> Alaska Power Authority internal review-- accounting for expenditures. ent://SD_ILS/0/SD_ILS:1681388 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Alaska Power Authority Susitna Hydroelectric Project settlement process, position paper discussion meeting. ent://SD_ILS/0/SD_ILS:1418195 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Regular print<br/> Alaska Power Authority, Susitna Hydroelectric Project, Position paper, recreation issue R-... ent://SD_ILS/0/SD_ILS:2044896 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z &lt;1985&gt;<br/>A collection of brief statements that are positions of the Alaska Power Authority on recreation aspects of the planned Susitna Hydroelectric Project.<br/>Regular print&#160;Other<br/> Notes of meeting, Bristol Bay regional power plan, Alaska Power Authority. ent://SD_ILS/0/SD_ILS:1100697 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>&quot;The meeting was held to (1) report on the spring studies made on the Tazimina and Newhalen Rivers and (2) present a 'seminar' to interested personnel...on the subject of fish protection at water intakes. The seminar concentrated on problems relevant to the proposed Newhalen diversion plan&quot;--Leaf [2].<br/>Manuscript<br/> Potential hydroelectric power sites : Bristol Bay regional power plan, Alaska Power Authority. ent://SD_ILS/0/SD_ILS:939855 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>&quot;The purpose of the study is to conduct a detailed feasibility analysis of the Tazimina River Hydroelectric Project, and a feasibility assessment of alternative regional power plans.&quot;--Cover letter.<br/>Book<br/> Alaska Power Authority management and organizational review : final report ent://SD_ILS/0/SD_ILS:1639995 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Conditional power sales agreement between Alaska Power Authority and Homer Electric Association, Inc. ent://SD_ILS/0/SD_ILS:1690680 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [198-]<br/>Book<br/> Alaska Power Authority Susitna hydroelectric project presentation of economic marketing and financial evaluation. ent://SD_ILS/0/SD_ILS:1653094 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Book<br/> Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project, progress report. ent://SD_ILS/0/SD_ILS:1785320 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project, progress report.&#160;Progress report<br/>Serial&#160;Other<br/> Transmission line assessment, Bradley Lake Hydroelectric Project, Alaska Power Authority ent://SD_ILS/0/SD_ILS:1236871 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Book<br/> Anchorage-Fairbanks Transmission Intertie, Alaska Power Authority : environmental assessment report ent://SD_ILS/0/SD_ILS:1602097 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982.<br/>Book<br/> The Alaska Power Authority : an internal review : 1983 interim report ent://SD_ILS/0/SD_ILS:1627527 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Watts, Jerrold.<br/>[1983]<br/>Book<br/> Alaska Power Authority management and organizational review : phase I report ent://SD_ILS/0/SD_ILS:1550855 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Preliminary report for Alaska Power Authority, Railbelt Utilities : Anchorage-Kenai transmission intertie feasibility study. ent://SD_ILS/0/SD_ILS:143225 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Alaska Power Authority findings and recommendations, Black Bear Lake Hydroelectric Project, Prince of Wales Island. ent://SD_ILS/0/SD_ILS:1720490 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Book<br/> Tunnel muck disposal assessment : Bradley Lake Hydroelectric Project, Alaska Power Authority ent://SD_ILS/0/SD_ILS:243699 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Middle Fork diversion assessment, Bradley Lake Hydroelectric Project, Alaska Power Authority ent://SD_ILS/0/SD_ILS:1236847 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Book<br/> Alaska Power Authority comments on the Federal Energy Regulatory Commission draft environmental impact statement of May 1984. ent://SD_ILS/0/SD_ILS:1686304 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Regular print<br/> [Alaska Power Authority &quot;wrap-up&quot; insurance on Tyee Lake Hydroelectric Project] ent://SD_ILS/0/SD_ILS:1546505 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project supplement to interim report. ent://SD_ILS/0/SD_ILS:1522763 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Book<br/> Summary of Alaska Power Authority design refinements to Federal Energy Regulatory Commission license application. ent://SD_ILS/0/SD_ILS:2038639 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1984]<br/>Design refinements are presented for the proposed Watana Dam and Devil Canyon Dam. These refinements were developed as a result of geotechnical investigations conducted after Alaska Power Authority filed its license application for the Susitna Hydroelectric Project in February 1983. The report is accompanied by revised tables for Exhibit D : summary of cost estimate (cost estimates are in January 1982 dollars) and an addendum to Exhibit F : supporting design report.<br/>Electronic resource<br/> Black Bear Lake project, FERC no. 5715, Alaska : applicant, Alaska Power Authority ent://SD_ILS/0/SD_ILS:267246 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project, Position paper, recreation issue R-3. Significance of loss of whitewater resource. ent://SD_ILS/0/SD_ILS:2044897 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1985]<br/>This paper describes current recreational use of the Susitna River in its whitewater reaches (between the Denali Highway to the Parks Highway), the significance of loss of whitewater resource due to the planned Susitna Hydroelectric Project, and recommended mitigation measures.<br/>Regular print<br/> Brief environmental report for Alaska Power Authority Teeland-Hollywood 138kV transmission line ent://SD_ILS/0/SD_ILS:1533280 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Final report, review of icing studies : Bradley Lake Hydroelectric Project, Alaska Power Authority ent://SD_ILS/0/SD_ILS:259179 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Tyee Lake Hydroelectric Project fisheries mitigation plan [microform] : prepared for Alaska Power Authority ent://SD_ILS/0/SD_ILS:1728791 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Kelly, Michael D.<br/>[1982]<br/>Other<br/>JLC Title 245h&#160;[microform] :<br/> Alaska Power Authority : final report : a risk assessment evaluation of major electric systems ent://SD_ILS/0/SD_ILS:1602098 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1988]<br/>Book<br/> Alaska Power Authority comments on Draft supplemental environmental impact statement, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska. ent://SD_ILS/0/SD_ILS:1236875 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Regular print<br/> Final report to Alaska Power Authority on Pelican power alternatives : phase II, feasibility study ent://SD_ILS/0/SD_ILS:1608193 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Winter studies of resident and juvenile anadromous fish, October 1984-May 1985. Part 1 [microform] / prepared for Alaska Power Authority. ent://SD_ILS/0/SD_ILS:3511410 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Susitna hydro aquatic studies report ; no. 11<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> A Special report on the Alaska Power Authority, September 28, 1976-June 30, 1983. ent://SD_ILS/0/SD_ILS:1560009 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Alaska Power Authority Board of Directors Meeting : Juneau Borough Chambers, Friday, May 3, 1985, 8:30 a.m. ent://SD_ILS/0/SD_ILS:1979630 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Electronic resource<br/> Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 24, 1984 ent://SD_ILS/0/SD_ILS:2018501 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Regular print<br/> Alaska Power Authority response to Federal Energy Regulatory Commission data request of March 4, 1985. ent://SD_ILS/0/SD_ILS:2047358 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>This document is a response to FERC's questions regarding environmental aspects of construction of the proposed Susitna Hydroelectric Project or energy alternatives. The issues cover air polluting equipment to be used in dam construction; the method of removal and disposal of trees from the reservoir and dam area, and air quality effects if burning is to be used; sulfur dioxide power plant emissions at the Nenana and Willow power plants; fugitive dust emissions from the Lignite Creek mine and power plant; acid deposition calculations for a 600 MW power plant; PLUEVUE model runs on visibility effects; noise calculations including coal mine blasting, continuous noise; train noise, and power plant noise; and wolverine field data.<br/>Regular print<br/> Alaska Power Authority response to Federal Energy Regulatory Commission data request of March 27, 1985 ent://SD_ILS/0/SD_ILS:2048199 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>On March 27, 1985 Donald H. Clarke of the U.S. Federal Energy Regulatory Commission (FERC) sent a letter to Jane Drennan of Pillsbury, Madison &amp; Sutro requesting certain information on the Susitna Hydroelectric Project as part of the project licensing steps. The information requested covers energy alternatives to the proposed hydroelectric project described in the earlier March 5 response. The request involves: cost estimates for the Nenana power plant; heat rate and costs for gas-fired units; costs for coal, combined-cycle, and gas-fired turbine plants; OGP-6 input and output; breakdown of transmission costs for the OGP-6 thermal alternative costs; explanation of costs associated with the Nenana and Beluga coal plants; material and installation costs for the transmission station for the Beluga coal plant; OGP-6 model source code modifications and algorithms; and energy from the Watana and Devil Canyon developments for the Case E-VI alternative flow regimes.<br/>Regular print<br/> Response of the Alaska Power Authority to comments on the Alaska Power Authority's application for license for major project. ent://SD_ILS/0/SD_ILS:253425 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>In 1983 the Alaska Power Authority (APA) filed an application called &quot;Before the Federal Energy Regulatory Commission : application for license for major project, Susitna Hydroelectric Project&quot; (APA numbers 123-132, 150-152, 484). On December 12, 1983, the U.S. Department of the Interior, Office of the Secretary filed a 108-page letter about the application to FERC. By November 28 eight other federal and state agencies also filed letters. In this document APA responds to the December 12, 1983 letter from U.S. Department of the Interior, Office of the Secretary. (Another document, which is numbered APA 1134 and APA 2496, is APA's response to the other eight agencies.)<br/>Regular print&#160;Other<br/> Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.12, plant ecology ent://SD_ILS/0/SD_ILS:3521209 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982?]<br/>Book<br/> Alaska Power Authority responses to agency comments on the Draft supplemental environmental impact statement, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska. ent://SD_ILS/0/SD_ILS:1639369 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>This documents contains Alaska Power Authority responses to comments from these agencies: Alaska Office of Management and Budget, National Marine Fisheries Service, U.S. Environmental Protection Agency, U.S. Corps of Engineers, U.S. Department of the Interior. Their earlier comments were in response to the February 1985 report: Draft supplemental environmental impact statement, Bradley Lake Hydroelectric Project, FERC No. 8221 - Alaska.<br/>Regular print<br/> An application to the Alaska Power Authority for operation &amp; maintenance of the Lake Tyee Hydroelectric Project ent://SD_ILS/0/SD_ILS:1734321 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Book<br/> Chilkat River Basin region : reconnaissance assessment of energy alternatives : for State of Alaska, Alaska Power Authority ent://SD_ILS/0/SD_ILS:1732014 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1980]<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies annual progress report. Subtask 7.11, Big game ent://SD_ILS/0/SD_ILS:250265 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Regular print<br/> Alaska Power Authority responses to agency comments on the terrestrial impact assessment report, June, 1985, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska. ent://SD_ILS/0/SD_ILS:1235726 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.14, access road analysis ent://SD_ILS/0/SD_ILS:3554333 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1980?]<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project : task 7, Environmental studies, wildlife ecology : wildlife habitat value analysis ent://SD_ILS/0/SD_ILS:3523122 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.11, wildlife ecology-- furbearers ent://SD_ILS/0/SD_ILS:3521207 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1980]<br/>Book<br/> Susitna-Watana hydro cost of power : Alaska Energy Authority compares estimates to Dr. Colt's report. ent://SD_ILS/0/SD_ILS:1978743 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [2012]<br/>In a recent discussion paper, Dr. Steve Colt calculates the retail cost of power from Susitna-Watana Hydro during the first year of operation at a much higher rate than the Alaska Energy Authority (AEA). An analysis reveals that almost the entire discrepancy between AEA and Dr. Colt's estimates come from three critical assumptions: capital cost of the project, rate structure, and cost of debt. This brief report outlines each of these assumptions and demonstrates why AEA's analysis is more accurate. The report addresses one assumption at a time, walking through three steps to full correction. In order to compare like costs, this paper focuses on the wholesale cost of power from Susitna-Watana Hydro. Dr. Colt estimates this to be $0.34 per kWh (Dr. Colt then adds $0.06 for distribution costs to estimate a retail rate of $0.40).<br/>Electronic resource<br/> Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies. Procedures manual. Subtask 7.11, Wildlife ecology--furbearers ent://SD_ILS/0/SD_ILS:1499426 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1980]<br/>This document describes the research methodology for studying furbearing animals within a designated study area that represents where these animals will be affected by the Susitna River hydroelectric dams.<br/>Regular print<br/> Cooperative agreement between the U.S. Fish and Wildlife Service, Region 7, and the Alaska Power Authority. ent://SD_ILS/0/SD_ILS:1514177 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Outlooks for world oil prices : analysis of alternative schools of thought : report to the Alaska Power Authority ent://SD_ILS/0/SD_ILS:1939314 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1988]<br/>Final draft.<br/>Book<br/> Alaska Power Authority : reference materials for technical presentation for the Bradley Lake Hydroelectric Project in Homer, Alaska ent://SD_ILS/0/SD_ILS:1767560 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project : environmental studies annual report 1980 : subtask 7.12, plant ecology studies ent://SD_ILS/0/SD_ILS:3523125 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Book<br/> A special report on the Department of Commerce and Economic Development, Alaska Power Authority major capital projects. ent://SD_ILS/0/SD_ILS:1546714 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Department of Commerce, Community, and Economic Development, Alaska Energy Authority, Rural Power System Upgrade Program, procurement issues. ent://SD_ILS/0/SD_ILS:1796428 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [2008]<br/>Book<br/> Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.92, Susitna Hydroelectric Project, Watana airstrip feasibility study, Phase I, Task 39. ent://SD_ILS/0/SD_ILS:1727806 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1983]<br/>Regular print<br/> A special report on the Department of Commerce and Economic Development, Alaska Power Authority, Solomon Gulch Hydroelectric Project. ent://SD_ILS/0/SD_ILS:1546260 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> A special report on the Department of Commerce and Economic Development, Alaska Power Authority, Tyee Lake Hydroelectric Project. ent://SD_ILS/0/SD_ILS:1546269 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985?]<br/>Book<br/> A special report on the Department of Commerce and Economic Development, Alaska Power Authority Point Mackenzie electrification project. ent://SD_ILS/0/SD_ILS:1546512 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1986.<br/>Book<br/> Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 11, 1984 : dam break analysis, Watana and Devil Canyon ent://SD_ILS/0/SD_ILS:2047356 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Regular print<br/> Report to the Alaska Power Authority in regard to the plan of finance of the Tyee Lake Hydroelectric Project ent://SD_ILS/0/SD_ILS:1718565 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1980.<br/>Book<br/> Alaska Power Authority, Susitna Hydroelectric Project, Position paper, recreation issue R-2. Significance of impacts on hunting and recreational trapping, including availability of resource, access, and quality of experience. ent://SD_ILS/0/SD_ILS:2044895 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1985]<br/>Regular print<br/> Federal Energy Regulatory Commission, Susitna Hydroelectric Project, Project No. 7114, response of the Alaska Power Authority to comments on the Alaska Power Authority's application for license for major project. ent://SD_ILS/0/SD_ILS:1514109 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>In 1983 the Alaska Power Authority (APA) filed an application called &quot;Before the Federal Energy Regulatory Commission : application for license for major project, Susitna Hydroelectric Project&quot; (APA Document numbers 123-132, 150-152, 484). On December 12, 1983, the U.S. Department of the Interior, Office of the Secretary filed a 108-page letter about the application to FERC. By November 28, eight other state and federal agencies also filed letters. This document represents the Alaska Power Authority's responses to the more than 250 specific comments contained in the eight agency comment letters. In this document APA responds to: U.S. Bureau of Land Management; U.S. National Marine Fisheries Service; U.S. Environmental Protection Agency, Region X; U.S. Fish and Wildlife Service; Advistory Council on Historic Preservation (in Washington, D.C.); Alaska Office of Management and Budget; U.S. Department of the Air Force; and Alaska Division of Parks.<br/>Regular print<br/> Attachment C-1 to contract between Alaska Power Authority and Harza-Ebasco Susitna Joint Venture, detailed scope of work fiscal year 1985. ent://SD_ILS/0/SD_ILS:374874 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Electronic resource<br/> Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.49, Susitna Hydroelectric Project, Eklutna Lake temperature and ice study (with six months simulation for Watana Reservoir) ent://SD_ILS/0/SD_ILS:1728049 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1984]<br/>Regular print<br/> Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.11, wildlife ecology--birds and non-game mammals ent://SD_ILS/0/SD_ILS:3521208 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1980]<br/>Book<br/> A performance review of the Department of Commerce and Economic Development, Alaska Power Authority : September 28, 1976-December 12, 1980. ent://SD_ILS/0/SD_ILS:3364316 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981?]<br/>Book<br/> A performance review of the Department of Commerce and Economic Development, Alaska Power Authority : September 28, 1976-December 12, 1980. ent://SD_ILS/0/SD_ILS:1560097 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981?]<br/>Book<br/> Alaska Power Authority response to agency comments on license application. Reference to comment(s): I. 99, Data index by habitat area for ADF &amp; G data reports--Phase II, vol.'s 2, 3 &amp; 4. ent://SD_ILS/0/SD_ILS:257032 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>An index to Phase II data report volumes 2-4 and their appendices of the Susitna Hydro Aquatic Studies.<br/>Regular print<br/> Moose movements and habitat use along the upper Susitna River--progress report to Alaska Power Authority (April 1978 through September 1978) ent://SD_ILS/0/SD_ILS:2622394 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Taylor, Kenton P.,<br/>[1979]<br/>In order to study potential effects of proposed hydroelectric development in the Devils Canyon area of the Susitna River, baseline information on moose movements within the affected area is being collected. The Alaska Power Authority sponsored this study, which continues a study reported by the same authors in 1978. Radio collars and visual collars were placed on adults captured between the confluences of the Maclaren River and Devil Creek during the October 1976 and March 1977 period. Movement behavior indicates that moose from many portions of the Susitna River drainage use habitats within or adjacent to the impoundment areas.<br/>Regular print<br/> A special report on the Department of Commerce and Economic Development, Alaska Public Utilities Commission, Alaska Power Authority, Power Cost Equalization Program. ent://SD_ILS/0/SD_ILS:1555374 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.105, excerpt from Air-water flow in hydraulic structures. ent://SD_ILS/0/SD_ILS:375459 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Falvey, Henry T.,<br/>[1984]<br/>Regular print<br/> Report to the Alaska Power Authority in regard to the plan of finance of the Swan Lake Hydroelectric Project of the Ketchikan Public Utilities System ent://SD_ILS/0/SD_ILS:1718591 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1980.<br/>Book<br/> A special review of the Alaska Power Authority insurance programs administered through the Alaska Power Authority and the Department of Administration, Division of Risk Management. ent://SD_ILS/0/SD_ILS:1546603 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982?]<br/>Book<br/> Bald eagle program - 1988, surveys of nesting populations, experiments with artificial nests and methods for indirectly relocating nesting pairs, Bradley Lake Hydroelectric Project, Alaska Power Authority ent://SD_ILS/0/SD_ILS:1233035 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Roseneau, D. G.,<br/>[1989]<br/>Content Time Period&#160;d1988<br/>Regular print<br/> Application for amendment of license, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska, Alaska Power Authority : exhibits A, B, C, D, E, F, and G ent://SD_ILS/0/SD_ILS:1236874 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Book<br/> Refinement to reservoir and river temperature and ice studies for simulation period October 1976 to May 1977. Text changes and new exhibits I and O for Alaska Power Authority comments on the Federal Energy Regulatory Commission draft environmental impact statement of May 1984, Volume 8, Appendix VI, River ice simulations, Susitna River, Watana Dam to confluence of Susitna and Chulitna rivers ent://SD_ILS/0/SD_ILS:1979614 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1985]<br/>This document comprises errata to the main text (that is, &quot;Report&quot; section) and replacements to two exhibits of Volume 8 (which is called Appendix VI. River ice simulations, Susitna River, Watana Dam to confluence of Susitna and Chulitna rivers) of the 11-volume document: Alaska Power Authority comments on the Federal Energy Regulatory Commission draft environmental impact statement of May 1984. (Assigned numbers APA 1179 and SUS 401.)<br/>Microform<br/> Refinement to reservoir and river temperature and ice studies for simulation period October 1976 to May 1977. Text changes and new exhibits G and N for Instream ice simulation study by Harza-Ebasco for Alaska Power Authority : transmitted to the Federal Energy Regulatory Commission on November 2, 1984. ent://SD_ILS/0/SD_ILS:1970074 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>This document comprises errata to the main text (that is, &quot;Report&quot; section) and replacements to two exhibits of the document: Instream ice simulation study. Final report. (Assigned numbers APA 1986 and SUS 434.)<br/>Microform<br/> Alaska Power Authority response to agency comments on license application. Reference to comment(s): B. 8, I. 75, Preliminary environmental assessment of hydroelectric development on the Susitna River. ent://SD_ILS/0/SD_ILS:1376598 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>A report on biological and water quality investigations conducted in 1977-1978 to obtain baseline data on indigenous fish and moose populations and the existing aquatic habitat of the Susitna River drainage as part of the Susitna Hydroelectric Project in Alaska.<br/>Regular print<br/> Bald Eagle program, 1986 : prefabrication and installation of artificial nests and nesting structures, direct relocation of nesting pairs, and coning natural nests, Bradley Lake Hydroelectric Project, Alaska Power Authority ent://SD_ILS/0/SD_ILS:1236873 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> [Review of application for license submitted to FERC on February 28, 1983 for the Susitna Hydroelectric Project no. 71114 : cover letter and comments to Eric Yould, Alaska Power Authority, Anchorage, AK] ent://SD_ILS/0/SD_ILS:1098498 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Anderson, Lawrence R.<br/>1983.<br/>A list of deficiencies identified by Office of Electric Power Regulation concerning the preliminary draft of the Susitna Hydroelectric Project's Federal Energy Regulatory Commission (FERC) license application. Includes extensive comments to the various exhibits attached to the application.<br/>Regular print<br/> Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.230, excerpt from Suggested practices for raptor protection on power lines : the state of the art in 1981 ent://SD_ILS/0/SD_ILS:1466814 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Olendorff, Richard R.,<br/>[1984]<br/>Regular print<br/> Alaska Power Authority response to agency comments on license application. Reference to comment(s): D. 1, I. 204, Protection strategies for peregrine falcons and other raptors along the planned Northwest Alaskan Gas Pipeline route ent://SD_ILS/0/SD_ILS:1499341 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Roseneau, D. G.<br/>[1984]<br/>The proposed Northwest Alaskan Gas Pipeline would parallel the existing Trans-Alaska Pipeline between Prudhoe Bay and Delta Junction. At Delta Junction it would diverge southeastward to follow the Alaska Highway to the U.S.-Canadian border. This report was conducted to develop protection measures for nesting raptors in the proposed gas pipeline alignment. Emphasis has been placed on the peregrine falcon. Other raptors for which protection strategies are developed are the gyrfalcon, rough-legged hawk, golden eagle, bald eagle, and osprey.<br/>Regular print<br/> Alaskan electric power : an analysis of future requirements and supply alternatives for the Railbelt region : final report : for Alaska Division of Energy and Power Development, Department of Commerce and Economic Development, and the Alaska Power Authority ent://SD_ILS/0/SD_ILS:1703023 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1978.<br/>Book<br/> The status of the Puerto Rico Electric Power Authority (PREPA) restructuring support agreement : oversight hearing before the Subcommittee on Indian, Insular and Alaska Native Affairs of the Committee on Natural Resources, U.S. House of Representatives, One Hundred Fifteenth Congress, first session, Wednesday, March 22, 2017. ent://SD_ILS/0/SD_ILS:2979120 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 2017.<br/>Book<br/> The status of the Puerto Rico Electric Power Authority (PREPA) restructuring support agreement : oversight hearing before the Subcommittee on Indian, Insular and Alaska Native Affairs of the Committee on Natural Resources, U.S. House of Representatives, One Hundred Fifteenth Congress, first session, Wednesday, March 22, 2017. ent://SD_ILS/0/SD_ILS:4676586 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 2017.<br/>Microform<br/> The status of the Puerto Rico Electric Power Authority (PREPA) restructuring support agreement : oversight hearing before the Subcommittee on Indian, Insular and Alaska Native Affairs of the Committee on Natural Resources, U.S. House of Representatives, One Hundred Fifteenth Congress, first session, Wednesday, March 22, 2017. ent://SD_ILS/0/SD_ILS:2974868 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 2017.<br/>Electronic resource<br/> An Act Relating to the quorum of the Alaska Energy Authority; relating to the powers and duties of the Alaska Energy Authority; relating to the acquisition or construction of a Susitna River power project by the Alaska Energy Authority; relating to the definition of &quot;feasibility study&quot; in the Alaska Energy Authority Act; providing legislative approval for certain loans from the power project fund; and providing for an effective date. ent://SD_ILS/0/SD_ILS:1978914 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [2011?]<br/>Electronic resource<br/> Cook Inlet and tributaries, Alaska : letter from the Secretary of the Army transmitting a letter from the Chief of Engineers, Department of the Army, dated December 10, 1953, submitting an interim report, together with accompanying papers and illustrations, on a survey of Cook Inlet and tributaries, Alaska. This interim report is submitted under the authority for a preliminary examination and survey of harbors and rivers in Alaska, with a view to determining the advisability of improvements in the interest of navigation, flood control, hydroelectric power, and related water uses, authorized by the Flood Control Act approved on June 30, 1948. It is also submitted in final response to several other congressional authorizations listed in the report. ent://SD_ILS/0/SD_ILS:60203 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1957.<br/>Book<br/> Terror Lake Hydroelectric Project, 1984 / 20 MW installation, Kodiak, Alaska : progress report no. 7 ent://SD_ILS/0/SD_ILS:1710596 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Report on Pelican power alternatives : phase I, reconnaissance assessment ent://SD_ILS/0/SD_ILS:113337 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Book<br/> Environmental analysis of access road alternatives ent://SD_ILS/0/SD_ILS:374718 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>&quot;This report constitutes an analysis of three alternative corridors as provided to the environmental team by R &amp; M Consultants, Inc.&quot;--Leaf 1.<br/>Electronic resource<br/> Bioenergy news. ent://SD_ILS/0/SD_ILS:3531121 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [ -1997]<br/>Bioenergy news.&#160;Alaska Power Authority bioenergy news&#160;Division of Energy bioenergy news&#160;Alaska bioenergy news&#160;Energy update<br/>Serial&#160;Other<br/> Bioenergy news. ent://SD_ILS/0/SD_ILS:1687208 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [ -1997]<br/>Bioenergy news.&#160;Alaska Power Authority bioenergy news&#160;Division of Energy bioenergy news&#160;Alaska bioenergy news.&#160;Energy update<br/>Serial&#160;Other<br/> Task 3, Hydrology. Field data index ent://SD_ILS/0/SD_ILS:1098738 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>[July 1982 version].<br/>Index to hydrologic and climatologic data for Alaska Power Authority Susitna Hydroelectric Project study team members. Index contains historical data up to Jan. 1, 1980 and post-1980 data collected by government agencies and study team members.<br/>Microform<br/> Susitna Hydroelectric Project field data index ent://SD_ILS/0/SD_ILS:375157 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>[1981 ed.].<br/>&quot;The objective of the Field Data Index &amp; Distribution System is to establish a formal system of conveying information concerning hydrologic and climatic data availability to each member of the study team. The project data base consists of (a) Historical recorded data to January 1, 1980; (b) 1980 data collected by government agencies and study team members.&quot;--P. 1.<br/>Electronic resource<br/> Subtask 6.05, Development selection report. ent://SD_ILS/0/SD_ILS:2018551 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>1st draft.<br/>Regular print<br/> Introduction to the amendment to the license application before the Federal Energy Regulatory Commission. ent://SD_ILS/0/SD_ILS:291266 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>&quot;This document provides an overview of the history and status of the Alaska Power Authority's application for license to construct and operate the Susitna Hydroelectric project. In addition, the principal economic and environmental issues relating to the licensing of the Project are addressed.&quot;--P. 1.<br/>Regular print<br/> Best management practices manual. Oil spill contingency planning ent://SD_ILS/0/SD_ILS:1541061 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Best management practices manual. Erosion and sedimentation control ent://SD_ILS/0/SD_ILS:1597849 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Electronic resource<br/> Best management practices manual. Fuel and hazardous materials ent://SD_ILS/0/SD_ILS:1597855 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Electronic resource<br/> Task 3, Hydrology. Regional flood studies ent://SD_ILS/0/SD_ILS:1617953 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Regular print<br/> Best management practices manual. Water withdrawal and storage ent://SD_ILS/0/SD_ILS:1597852 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Electronic resource<br/> Best management practices manual. Liquid and solid waste management ent://SD_ILS/0/SD_ILS:1597859 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Final].<br/>Electronic resource<br/> Environmental studies annual report, 1980. Subtask 7.05, Socioeconomic analysis ent://SD_ILS/0/SD_ILS:373937 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>&quot;The socioeconomic analysis presented and discussed herein is designed to assess the important socioeconomic impacts that could result from hydroelectric development on the Susitna River&quot;--Page [3].<br/>Regular print<br/> Task 3, Hydrology. Field data index ent://SD_ILS/0/SD_ILS:1098737 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>[Feb. 1983 version].<br/>Index to hydrologic and climatologic data for Alaska Power Authority Susitna Hydroelectric Project study team members. Index contains historical data up to Jan. 1, 1980 and post-1980 data collected by government agencies and study team members.<br/>Regular print<br/> Environmental studies procedures manual. Subtask 7.07, Land use analysis ent://SD_ILS/0/SD_ILS:1980692 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1980]<br/>This procedure manual describes the research methodology in performing a land use analysis to evaluate the change in the use of land caused by the proposed Susitna Hydroelectric Project (including the dam, reservoir, transportation access and transmission lines) and to determine the overall affect of the project.<br/>Electronic resource<br/> Task 3, Hydrology. Water quality annual report, 1982 ent://SD_ILS/0/SD_ILS:1601760 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>&quot;This report describes and presents the results of the 1982 data collection effort and is intended to supplement the 1981 Water Quality Annual Report where a more comprehensive discussion on methodology is given as well as a tabulation of historical data.&quot;--Page 1-1.<br/>Electronic resource<br/> Task 3, Hydrology. Field data collection and processing ent://SD_ILS/0/SD_ILS:375326 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>&quot;This Closeout Report presents an overview of the data-collection program and a general description of the field work undertaken relative to each of the hydrologic parameters.&quot;--Page 1-1.<br/>Regular print<br/> Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative. ent://SD_ILS/0/SD_ILS:2018513 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Final draft.<br/>&quot;The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites.&quot;--P. 1-1.<br/>Electronic resource<br/> Task 3, Hydrology. Ice observations, 1980-81 ent://SD_ILS/0/SD_ILS:252437 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>&quot;This report provides a summary of freezeup, winter and breakup ice observations ... on the Susitna River and a review of limited historical records on river ice conditions.&quot;--Page 1.1.<br/>Content Time Period&#160;d1980 d1981<br/>Regular print<br/> Bradley River water quality report. ent://SD_ILS/0/SD_ILS:1236869 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]-<br/>Bradley River water quality report.&#160;Bradley Lake Hydroelectric Project 1985-1986&#160;Alaska Power Authority, Bradley Lake Hydroelectric Project 1987-1988&#160;Bradley River water quality report ..., Bradley Lake Hydroelectric Project&#160;Water quality report, Bradley River 1986<br/>Serial<br/> Task 11, Reference report, economic, marketing and financial evaluation ent://SD_ILS/0/SD_ILS:250692 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982?]<br/>Electronic resource<br/> Design transmittal. Subtasks 6.02, 6.03, 6.06, Preliminary design considerations. ent://SD_ILS/0/SD_ILS:1991294 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Electronic resource<br/> Task 2, Surveys and site facilities. Subtask 2.10, Access planning study ent://SD_ILS/0/SD_ILS:376042 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Prelim. 2nd printing.<br/>&quot;The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project.&quot;--Leaves 1-2, 1-3.<br/>Microform<br/> Task 3, Hydrology. Field data collection and processing. Supplement 1, 1982 field data ent://SD_ILS/0/SD_ILS:375325 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>This report presents summaries of field data collected during the 1982 water year, October 1981 to September 1982, inclusive.<br/>Regular print<br/> Environmental studies procedures manual. Subtask 7.11, Wildlife ecology. Birds and non-game mammals ent://SD_ILS/0/SD_ILS:1980691 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1980]<br/>This procedure manual describes the research methodology for conducting an investigation on potential effects of the proposed Susitna Hydroelectric Project on birds and non-game mammals in the upper Susitna River basin. The purpose is to evaluate current animal habitats, to provide a basis for predicting faunal changes based on habitat changes caused by environmental alterations, and to evaluate mitigation measures.<br/>Electronic resource<br/> Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative ent://SD_ILS/0/SD_ILS:252434 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>&quot;The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites.&quot;--P. 1-1.<br/>Microform<br/> Task 6, Development selection. Subtask 6.05, Development selection report ent://SD_ILS/0/SD_ILS:1169259 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>2nd draft.<br/>&quot;Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Report presents the results of this initial step in the POS process, and provides recommendations and justification for continuation of study of a specific basin development.&quot;--Page 1-1.<br/>Regular print<br/> Bradley River salmon escapement monitoring study, 1987, Bradley Lake Hydroelectric Project ent://SD_ILS/0/SD_ILS:1236868 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Subtask 3.01, Closeout report ent://SD_ILS/0/SD_ILS:250468 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>[February 1981 version].<br/>The objective of the Subtask 3.01 is to assemble and review all available reports, maps, and studies relating to the hydrologic aspects of the Susitna basin and neighboring basins and to abstract hydrologic design parameters required for the planning studies concerned with alternative hydroelectric sites including small hydroelectric development in the Alaska Railbelt.<br/>Regular print<br/> Task 6, Development selection. Subtask 6.05, Development selection report ent://SD_ILS/0/SD_ILS:377674 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>[Final].<br/>&quot;Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Report presents the results of this initial step in the POS process, and provides recommendations and justification for continuation of study of a specific basin development.&quot;--Page 1-1.<br/>Regular print<br/> Settlement process, instream flow relationships report, volume no. 1 ent://SD_ILS/0/SD_ILS:261649 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Working draft, [2nd draft].<br/>Regular print<br/> Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through J ent://SD_ILS/0/SD_ILS:377673 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>[December 1981 edition].<br/>Regular print<br/> Draft instream flow relationships report. Volume no. 2 ent://SD_ILS/0/SD_ILS:375135 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>&quot;This document comprises Volume II of the Instream Flow Relationships Report (IFRR), a two-volume series on instream flow processes in the middle Susitna River ... The objectives of the IFRR are twofold: 1) to identify the relative importances of salient physical processes to fish resources, and 2) to evaluate and, where possible, quantify the influences of incremental changes in important variables on fish habitat.&quot;--Page I-1.<br/>Regular print<br/> [Terror Lake hydro documents] ent://SD_ILS/0/SD_ILS:229695 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985?]<br/>Book<br/> Power sales agreements for Swan Lake, Solomon Gulch, Terror Lake ent://SD_ILS/0/SD_ILS:1556246 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Book<br/> Railbelt intertie reconnaissance study ent://SD_ILS/0/SD_ILS:1714481 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987-1989]<br/>Book<br/> Lake Elva plan of finance ent://SD_ILS/0/SD_ILS:1686931 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1981.<br/>Book<br/> Black Bear Lake Hydroelectric Project : plan of finance ent://SD_ILS/0/SD_ILS:3442777 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982]<br/>Book<br/> Draft summary of environmental report, Task 2, Surveys and site facilities ent://SD_ILS/0/SD_ILS:1095154 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Regular print<br/> Before the Federal Energy Regulatory Commission, application for license for major project, Susitna Hydroelectric Project. Volume 1, Initial statement. Exhibit A, Exhibit C, February 1983 ; Exhibit D, revised July 1983 ent://SD_ILS/0/SD_ILS:1457651 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Electronic resource<br/> Proposal to purchase the Snettisham hydroelectric project ent://SD_ILS/0/SD_ILS:1553255 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Book<br/> Small hydropower evaluation guidelines : a sourcebook for microhydropower development in Alaska ent://SD_ILS/0/SD_ILS:130601 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1986.<br/>Explores the possible development of microhydropower use in Alaska. Small hydropower systems (to 200 kilowatts) could be especially useful in the North, where many small isolated populations lack interconnection to a large power source. Also useful is the independency of microhydrosystems, providing relatively constant power over many years of operation, with minimal environmental impacts.<br/>Book<br/> Watana airstrip feasibility study, phase I : for the Susitna Hydroelectric Project ent://SD_ILS/0/SD_ILS:3511422 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1983.<br/>Microform<br/> Feasibility study for Togiak hydroelectric project : supplemental data report : hydrology ent://SD_ILS/0/SD_ILS:1546970 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Feasibility study for Togiak hydroelectric project : supplemental data report : hydrology ent://SD_ILS/0/SD_ILS:1557716 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Feasibility study for Larsen Bay hydroelectric project : supplemental data report : hydrology ent://SD_ILS/0/SD_ILS:1546972 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Feasibility study for King Cove hydroelectric project : supplemental data report : hydrology ent://SD_ILS/0/SD_ILS:260281 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Feasibility study for Old Harbor hydroelectric project : supplemental data report : hydrology ent://SD_ILS/0/SD_ILS:1546739 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Feasibility study for Larsen Bay hydroelectric project : supplemental data report : hydrology ent://SD_ILS/0/SD_ILS:1557658 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Susitna Hydroelectric Project : summary report ent://SD_ILS/0/SD_ILS:1538594 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982.<br/>Draft.<br/>A draft summary report of the Feasibility Study of the Susitna Hydroelectric Project proposed by the Alaska Power Authority and intended for the public at large and interested agencies and organizations.<br/>Book<br/> Feasibility study for Old Harbor hydroelectric project [electronic resource] : supplemental data report : hydrology ent://SD_ILS/0/SD_ILS:1546969 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Computer file<br/>JLC Title 245h&#160;[electronic resource] :<br/> Winter studies of resident and juvenile anadromous fish, October 1984-May 1985. Part 1 [microform] ent://SD_ILS/0/SD_ILS:1606231 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Salmon passage validation studies, August-October 1984 [microform] : addendum to report no. 3, ch. 6 ent://SD_ILS/0/SD_ILS:1609545 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Availability of invertebrate food sources for rearing chinook salmon in turbid Susitna River habitat report no. 8 / [microform] : ent://SD_ILS/0/SD_ILS:3485286 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Susitna hydro aquatic studies report ; no. 8<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Winter studies of resident and juvenile anadromous fish (October 1984-May 1985) report no. 11, part 2 / [microform] : ent://SD_ILS/0/SD_ILS:3485408 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Susitna hydro aquatic studies report ; no. 11<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Winter studies of resident and juvenile anadromous fish (October 1984-May 1985) [microform] : report no. 11, part 2 ent://SD_ILS/0/SD_ILS:717389 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Bristol Bay regional power plan detailed feasibility analysis : interim feasibility assessment : executive summary ent://SD_ILS/0/SD_ILS:341829 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982].<br/>Book<br/> Alaska's energy plan 1986 : draft ent://SD_ILS/0/SD_ILS:2616921 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1985.<br/>Book<br/> Tazimina River Hydroelectric Project feasibility report ent://SD_ILS/0/SD_ILS:1695040 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z c1987.<br/>Book<br/> Feasibility study and preliminary engineering for Chena Station : phase one report, February 1983 ent://SD_ILS/0/SD_ILS:3398542 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1983.<br/>Book<br/> Watana airstrip feasibility study, phase I [microform] ent://SD_ILS/0/SD_ILS:1546848 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>[April 1983 ed.].<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Transmission intertie Kake-Petersburg, Alaska : a reconnaissance report ent://SD_ILS/0/SD_ILS:1542703 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Book<br/> Guide survey report ent://SD_ILS/0/SD_ILS:375210 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>This study presents information about guides who rely on the area in the vicinity of the proposed Susitna River dams and access routes, their operations, and their clients.<br/>Electronic resource<br/> Recreation survey report [microform] ent://SD_ILS/0/SD_ILS:1605163 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Bristol Bay regional power plan, Newhalen River juvenile sockeye salmon studies, number 2 ent://SD_ILS/0/SD_ILS:255188 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>This baseline study is the second in support a feasibility analysis of a proposed run-of-the-river hydroelectric project (water diverted into a canal) on the Newhalen River, Alaska. It focuses on the temporal distribution and enumeration of sockeye salmon smolt, fry, and adults. Fish diversion and impingement survival tests were conducted.<br/>Book<br/> Rural energy, problems and prospects ent://SD_ILS/0/SD_ILS:1574712 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Book<br/> Tazimina River Hydroelectric Project : progress report ent://SD_ILS/0/SD_ILS:1696795 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Book<br/> Feasibility report City Creek run of the River Hydropower Project Petersburg, Alaska ent://SD_ILS/0/SD_ILS:1719957 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1979]<br/>Book<br/> Instream ice simulations : supplementary studies for middle Susitna River ent://SD_ILS/0/SD_ILS:3539771 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Susitna Hydroelectric Project, Watana development winter 1983 geotechnical exploration project ent://SD_ILS/0/SD_ILS:1537369 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Presents geological conditions in the Susitna River Valley at the damsite, cofferdams and in the adjacent relict Watana channel northeast of the site. Emphasis is given to geophysical exploration, drilling, and sampling, field permeability testing in overburden and pressure testing in bedrock, laboratory testing and instrumentation.<br/>Regular print<br/> Susitna Hydroelectric Project Watana development winter 1983 geotechnical exploration project ent://SD_ILS/0/SD_ILS:3397283 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Instream ice simulations [microform] : supplementary studies for middle Susitna River ent://SD_ILS/0/SD_ILS:1521372 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>&quot;River ice simulation results are presented herein as a supplement to those included in the &quot;Instream Ice Simulation Study&quot; (Harza-Ebasco 1984b).&quot;--Summary.<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Susitna Hydroelectric Project, aquatic plan of study, fiscal year 1985 : final report ent://SD_ILS/0/SD_ILS:3528862 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Slough geohydrology studies ent://SD_ILS/0/SD_ILS:1952631 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>[February 1984 draft].<br/>Regular print<br/> Business survey report ent://SD_ILS/0/SD_ILS:1456282 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>This report presents the methodology and results of a survey of businesses located in Talkeetna, Trapper Creek, Cantwell, and Healy in order to describe baseline socioeconomic conditions of communities that could be affected by the Susitna Hydroelectric Project.<br/>Regular print<br/> Aquatic monitoring manual ent://SD_ILS/0/SD_ILS:2373305 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>This manual was written for the use by the SuHydro Aquatic Study Team in carrying out long-term monitoring of impacts on fish and aquatic habitats as a result of the Susitna Hydroelectric Project. The focus of the monitoring will be downstream of the damsites to determine baseline and with-project conditions, evaluate mitigation measures, refine operation procedures and mitigation measures, and determine impacts on aquatic resources.<br/>Regular print<br/> Watana and Devil Canyon Reservoir temperature/ice and suspended sediment concentration study [microform] ent://SD_ILS/0/SD_ILS:3511453 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Water quality monitoring, 1985 : report ent://SD_ILS/0/SD_ILS:1456204 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Microform<br/> Economic and financial update ent://SD_ILS/0/SD_ILS:2355722 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>[Draft].<br/>In this financial update on the Susitna Hydroelectric Project, an assessment is made of the effect of oil prices and of the corresponding outlook on the economy in Alaska on the feasibility of the project.<br/>Regular print<br/> Tanana reconnaissance study of energy requirements and alternatives ent://SD_ILS/0/SD_ILS:1607138 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981]<br/>Preliminary, for review.<br/>Book<br/> Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project. Volume 2, Stage III [microform] ent://SD_ILS/0/SD_ILS:1521667 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project, volume 1, stages 1 and 2 [microform] ent://SD_ILS/0/SD_ILS:3482957 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Environmental implication of Susitna Project alternatives ent://SD_ILS/0/SD_ILS:2355761 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>[Draft].<br/>Part A considers environmental implications for the Susitna Hydroelectric Project. Part B considers environmental implications for the electric generating options that are alternative to this project, specifically, coal fired facilities at Beluga and Nenana, facilities fired by natural gas from the Cook Inlet and North Slope, and the Chakachmna hydroelectric alternative.<br/>Regular print<br/> Susitna Hydroelectric Project, reservoir and river sedimentation ent://SD_ILS/0/SD_ILS:1098739 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Draft.<br/>&quot;The scope of the present study includes a reservoir sedimentation analysis for Watana and Devil Canyon Reservoirs, and a river sediment transport study for the Susitna River between the Devil Canyon dam site and the Sunshine stream gaging station ... The major tasks are: 1. to review available relevant reports, 2. to estimate sediment inflow to the reservoirs and sediment deposit in the reservoirs for 50 and 100 years of reservoir operation, 3. to conduct a preliminary assessment of aggradation and degradation of the Susitna River below the dams especially near the mouths of the tributaries and sloughs; 4. to recommend areas of concern for further study; and 5. to recommend a program of data collection required for further study.&quot;--P. 1-1.<br/>Microform<br/> Susitna River at Watana and Devil Canyon, streamflow time series : report ent://SD_ILS/0/SD_ILS:1457656 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1985.<br/>Microform<br/> Kodiak Island Borough electrification planning assessment : final report ent://SD_ILS/0/SD_ILS:5424909 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Kodiak Island Borough electrification planning assessment : final report ent://SD_ILS/0/SD_ILS:1544025 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Book<br/> Flow duration curves for natural and with-project conditions ent://SD_ILS/0/SD_ILS:1980732 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>[Draft].<br/>Flow duration curves for the Susitna River at Gold Creek, Sunshine, and Susitna stations were derived for natural conditions and projected conditions after construction of the proposed Susitna Hydroelectric Project. Observed weekly flows are given for the Chulitna and Talkeetna rivers near Talkeetna and the Skwentna River near Skwentna.<br/>Electronic resource<br/> Flood frequency analyses for natural and with-project conditions ent://SD_ILS/0/SD_ILS:1481067 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Draft].<br/>Flood frequency analyses were made for the Susitna River at Gold Creek and at Sunshine and Susitna Stations for natural and with-project conditions with the resulting flood peak frequency curves and flood peaks for selected recurrence intervals.<br/>Regular print<br/> River stage fluctuation resulting from alternative operations, Watana development ent://SD_ILS/0/SD_ILS:2038873 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>[May 1984 final report].<br/>River stage fluctuations due to alternative operations of the Watana Dam are estimated for the Susitna River from the Devil Canyon damsite to the Sunshine gage station located 14 miles downstream of the confluence of the Susitna and Chulitna rivers. Such operations would cause considerable fluctuation of reservoir releases within short time intervals. Both dams make up the proposed Susitna Hydroelectric Project. An earlier report by the same title was issued in January 1984 (Document no. 884). The purpose of this report is to provide a study of stage fluctuations for more moderate discharge variations.<br/>Regular print<br/> Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, waste control plan [microform] ent://SD_ILS/0/SD_ILS:5737492 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982.<br/>Book<br/>JLC Title 245h&#160;[microform]<br/> Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, waste control plan [microform] ent://SD_ILS/0/SD_ILS:1676667 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982.<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Community energy reconnaissance of Goodnews Bay, Grayling, Scammon Bay, and Togiak ent://SD_ILS/0/SD_ILS:1715045 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1981.<br/>Book<br/> Middle Susitna River sedimentation study : stream channel stability analysis of selected sloughs, side channels and main channel locations ent://SD_ILS/0/SD_ILS:1481457 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Draft].<br/>&quot;This study was conducted to evaluate potential effects of the Susitna Hydroelectric Project on channel stability at selected sites in the mainstem and at selected sloughs and side channels. ... The study reach includes the Susitna River between Devil Canyon and the confluence of the Susitna and Chulitna rivers&quot;--Leaf 1.<br/>Regular print<br/> Best management practices manual ent://SD_ILS/0/SD_ILS:1608812 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Recreation survey report : report ent://SD_ILS/0/SD_ILS:315000 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>The purpose of this recreation survey was to obtain baseline activity information for recreation sites in the vicinity of the Susitna Hydroelectric Project, that is, along the Denali Highway and along the Richardson Highway near Paxson. The results of the survey will be used to refine projects on the Project's effects on recreation and for recreation mitigation planning.<br/>Microform<br/> A report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives : April 1980, Fairbanks, Talkeetna, Wasilla, Anchorage ent://SD_ILS/0/SD_ILS:1719917 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1980.<br/>An account of community meetings from July 1979 to April 1980 to allow Alaska's citizens to participate in the development of a Plan of study for the Susitna Hydroelectric Project.<br/>Microform<br/> Watana airstrip feasibility study, Phase I ent://SD_ILS/0/SD_ILS:1457654 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>[April 1983 ed.].<br/>Regular print<br/> Watana airstrip feasibility study, Phase I ent://SD_ILS/0/SD_ILS:2358907 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>[September 1983 ed.].<br/>Regular print<br/> Downstream vegetation impacts assessment : report ent://SD_ILS/0/SD_ILS:1165653 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Electronic resource<br/> Susitna Hydroelectric Project. Subtask 4.5, socioeconomic studies : projection assumptions, methodology and output formats ent://SD_ILS/0/SD_ILS:3450337 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>Draft final.<br/>Book<br/> Unalaska geothermal feasibility study ent://SD_ILS/0/SD_ILS:256492 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, erosion control plan [microform] ent://SD_ILS/0/SD_ILS:5747530 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982.<br/>Book<br/>JLC Title 245h&#160;[microform]<br/> Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, erosion control plan [microform] ent://SD_ILS/0/SD_ILS:1676649 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1982.<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Site significance--a framework for evaluating cultural resources associated with the Susitna Hydroelectric Project in central Interior Alaska ent://SD_ILS/0/SD_ILS:2048193 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1984]<br/>Draft.<br/>This report explains the importance of assessing cultural properties that could be effected by construction and operation of the proposed Susitna Hydroelectric Project. Section 2 addresses the determination of site significance. Section 3 presents variables recorded at each site. Section 4 presents research questions grouped by five areas (cultural chronology; effects of tephra falls on prehistoric human ecology; subsistence and settlement; population dynamics, exchange, and diffusion; and ethnography and history).<br/>Regular print<br/> Fiscal year 1986 budget book ent://SD_ILS/0/SD_ILS:374915 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Electronic resource<br/> Drainage structure and waterway design guidelines : report ent://SD_ILS/0/SD_ILS:1237367 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>[Draft].<br/>Regular print<br/> Drainage structure and waterway design guidelines : report ent://SD_ILS/0/SD_ILS:374951 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Final].<br/>&quot;This manual is intended to be used by design engineers during the preparation of contract plans and specification for Alaska Power Authority Projects. The guidelines in the manual incorporate standard engineering practices and procedures, and also address Alaska Department of Fish and Game 1981 proposed habitat regulations where appropriate.&quot;--P. 1-1.<br/>Electronic resource<br/> Site significance : a framework for evaluating cultural resources associated with the Susitna Hydroelectric Project in central interior Alaska : draft report ent://SD_ILS/0/SD_ILS:3526872 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1984]<br/>Book<br/> Downstream aquatic impact assessment report ent://SD_ILS/0/SD_ILS:2373284 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Regular print<br/> Definition and costs of thermal power alternatives to Susitna : report ent://SD_ILS/0/SD_ILS:1691237 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Flood frequency analyses for natural and with-project conditions : report ent://SD_ILS/0/SD_ILS:375201 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Final].<br/>Flood frequency analyses were made for the Susitna River at Gold Creek and at Sunshine and Susitna Stations for natural and with-project conditions with the resulting flood peak frequency curves and flood peaks for selected recurrence intervals.<br/>Microform<br/> Streamflow time series, Susitna River at Watana and Devil Canyon : draft report ent://SD_ILS/0/SD_ILS:1952633 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Regular print<br/> Instream ice simulations, supplementary studies for middle Susitna River ent://SD_ILS/0/SD_ILS:1457652 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Draft].<br/>&quot;River ice simulation results are presented herein as a supplement to those included in the 'Instream Ice Simulation Study' (Harza-Ebasco 1984b).&quot;--Summary.<br/>Regular print<br/> Socioeconomic impact projections. Air transportation from Anchorage scenario : report ent://SD_ILS/0/SD_ILS:375101 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Electronic resource<br/> Instream ice simulations, supplementary studies for middle Susitna River ent://SD_ILS/0/SD_ILS:1462710 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Final].<br/>&quot;River ice simulation results are presented herein as a supplement to those included in the &quot;Instream Ice Simulation Study&quot; (Harza-Ebasco 1984b).&quot;--Summary.<br/>Regular print<br/> Watana and Devil Canyon reservoir temperature/ice and suspended sediment concentration study : report ent://SD_ILS/0/SD_ILS:1456208 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Microform<br/> Reservoir/river temperatures and ice simulations for Watana only operating in 2001 : report ent://SD_ILS/0/SD_ILS:375029 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Survey of experience in operating hydroelectric projects in cold regions ent://SD_ILS/0/SD_ILS:374974 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Final].<br/>A literature review, mailed survey, and site visit have been made to evaluate the procedures adopted by operators of hydroelectric projects in cold regions similar to the Susitna Hydroelectric Project site in response to environmental concerns. Topics that are addressed include reservoir and powerhouse operations to mitigate ice jam related flooding, effects of reservoir ice cover and bank ice on animal crossing, management of reservoir ice cover to control cracking and associated danger to animals, and bank erosion from reservoir and river ice movement.<br/>Regular print<br/> Reconnaissance study of energy requirements and alternatives for Kaltag, Savoonga, White Mountain and Elim ent://SD_ILS/0/SD_ILS:1714817 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981?]<br/>Book<br/> Anchorage/Fairbanks Intertie Transmission Line and Terror Lake Hydroelectric Project workers surveys, spring 1984 : report ent://SD_ILS/0/SD_ILS:1456205 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Reservoir/river temperatures and ice simulations for Watana and Devil Canyon operating in 2002 : report ent://SD_ILS/0/SD_ILS:375028 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Socioeconomic impact projections. Air transportation from Fairbanks scenario : report ent://SD_ILS/0/SD_ILS:375102 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Electronic resource<br/> Middle Susitna River sedimentation study : stream channel stability analysis of selected sloughs, side channels and main channel locations : report ent://SD_ILS/0/SD_ILS:375179 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>&quot;This study was conducted to evaluate potential effects of the Susitna Hydroelectric Project on channel stability at selected sites ... in the mainstem and at selected sloughs and side channels ... the study reach includes the Susitna River between Devil Canyon and the confluence of the Susitna and Chulitna rivers&quot;--Leaf 1.<br/>Microform<br/> Analysis of the coal alternative for supplying power to the Railbelt region of Alaska ent://SD_ILS/0/SD_ILS:1675597 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>&quot;This analysis of the coal alternative for electricity power generation in the Railbelt Region examines four issues: 1) present and projected demand for coals mined in Alaska; 2) current and projected supply of Alaska coals; 3) appropriate concepts for projecting coal prices; and 4) current and projected prices of Alaska coals.&quot;--Leaf 1.<br/>Microform<br/> Refinements to reservoir and river temperatures and ice simulations for October 1976 to May 1977, mete[o]rologic and hydrologic data : report ent://SD_ILS/0/SD_ILS:375045 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Stream flows and flow duration curves at Watana, Gold Creek, Sunshine and Susitna Station, for Watana only operation in 1996 and 2001 : report ent://SD_ILS/0/SD_ILS:374973 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Instream flow relationships report series fish resources and habitats in the middle Susitna River, technical report no. 1 / [microform] : ent://SD_ILS/0/SD_ILS:3483180 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project ent://SD_ILS/0/SD_ILS:375125 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>&quot;Thirty-three complete water years are contained in the period of simulation.&quot;--Page 1.<br/>Regular print<br/> Task 3, Hydrology. Field data index : report ent://SD_ILS/0/SD_ILS:374875 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>[Final version].<br/>Index to hydrologic and climatologic data for Alaska Power Authority Susitna Hydroelectric Project study team members. Index contains historical data up to Jan. 1, 1980 and post-1980 data collected by government agencies and study team members.<br/>Microform<br/> Cantwell business survey report : report ent://SD_ILS/0/SD_ILS:1727191 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>&quot;This business survey was designed to obtain information on types of services and products offered, length of operation and ownership, number of employees, residence of employees, business volumes, short-term expansion and start-up plans, and dependency upon fish and wildlife resources.&quot;--Leaf [1].<br/>Electronic resource<br/> Talkeetna business survey report : report ent://SD_ILS/0/SD_ILS:1726999 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>&quot;This business survey was designed to obtain information on types of services and products offered, length of operation and ownership, number of employees, residence of employees, business volumes, short-term expansion and start-up plans, and dependence upon fish and wildlife resources.&quot;--Leaf [1].<br/>Electronic resource<br/> Close-out status report for invertebrate analysis : report ent://SD_ILS/0/SD_ILS:1456210 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Microform<br/> Impoundment area fish impact assessment and mitigation plan ent://SD_ILS/0/SD_ILS:1482879 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Draft].<br/>Regular print<br/> Traffic analysis report for the Susitna Hydroelectric Project : report ent://SD_ILS/0/SD_ILS:1456280 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Railhead analysis report for the Susitna Hydroelectric Project : report ent://SD_ILS/0/SD_ILS:315054 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Instream flow relationships report series [microform] : physical processes of the middle Susitna River, technical report no. 2 ent://SD_ILS/0/SD_ILS:731093 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Glacial lake physical limnology studies, Eklutna Lake, Alaska ent://SD_ILS/0/SD_ILS:1457650 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Regular print<br/> Hypothetical mining studies and coal price estimates, Beluga and Nenana coal fields ent://SD_ILS/0/SD_ILS:1675423 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>&quot;The Harza-Ebasco Susitna Joint Venture (H-E) has requested the Paul Weir Company (Weirco) to perform four mining studies to estimate the price of coal from the Beluga and Nenana regions of Alaska. The studies are to be based on hypothetical geologic deposits which are representative of actual geologic conditions in the two regions.&quot;--Introduction.<br/>Microform<br/> Susitna Basin hydrological-meteor[o]logical data summary October 1982-December 1984 : report ent://SD_ILS/0/SD_ILS:375095 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/> Socioeconomic impact projections summary report, comparison of car and air transportation scenarios : report ent://SD_ILS/0/SD_ILS:1506784 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>&quot;This report provides a summary and comparison of socioeconomic impact projections of the Susitna Hydroelectric Project under alternative worker transportation scenarios for the communities that are expected to be significantly affected by the Project.&quot;--Leaf 1.<br/>Electronic resource<br/> Documentation report, socioeconomic impact model ent://SD_ILS/0/SD_ILS:1456207 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Regular print<br/> Assessment of access by spawning salmon into tributaries of the lower Susitna River [microform] ent://SD_ILS/0/SD_ILS:3483479 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Assessment of the effects of the proposed Susitna Hydroelectric Project on instream temperature and fish resources in the Watana to Talkeetna reach [microform] : supplemental report Case E-6 and additional Case C operating regimes ent://SD_ILS/0/SD_ILS:3482923 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Winter bird populations in forest habitats of the middle Susitna River Basin, Alaska ent://SD_ILS/0/SD_ILS:375160 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Electronic resource<br/> Riparian vegetation succession report : report ent://SD_ILS/0/SD_ILS:1233291 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Electronic resource<br/> Background research and predictive model for cultural resources located along the Susitna Hydroelectric Project's linear features phase 1 report / [microform] : ent://SD_ILS/0/SD_ILS:3483493 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform] :<br/> Phase I report, Background research and predictive model for cultural resources located along the Susitna Hydroelectric Project's linear features [microform] ent://SD_ILS/0/SD_ILS:315049 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Microform<br/>JLC Title 245h&#160;[microform]<br/> Bid documents for the site preparation contract, Bradley Lake Hydroelectric Project, Kenai Peninsula, Alaska, invitation to bid no. APA-86-R-004 ent://SD_ILS/0/SD_ILS:1236844 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Regular print<br/> Characterization of aquatic habitats in the Talkeetna-to-Devil Canyon segment of the Susitna River, Alaska ent://SD_ILS/0/SD_ILS:375142 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>[Final].<br/>Microform<br/> Task 3, Hydrology. Ice observations, 1981-82 ent://SD_ILS/0/SD_ILS:1953170 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Prelim. draft.<br/>Content Time Period&#160;d1980 d1982<br/>Regular print<br/> Financial statements. ent://SD_ILS/0/SD_ILS:1547389 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Financial statements.<br/>Serial<br/> Annual report ent://SD_ILS/0/SD_ILS:3479812 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Annual report&#160;Year-end report&#160;Annual report<br/>Serial&#160;Other<br/> Annual report ent://SD_ILS/0/SD_ILS:1709663 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Annual report&#160;Annual report<br/>Serial&#160;Other<br/> Bioenergy newsletter ent://SD_ILS/0/SD_ILS:1556445 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [[ -198-?]<br/>Bioenergy newsletter&#160;Bioenergy news<br/>Serial<br/> Socioeconomic analysis. ent://SD_ILS/0/SD_ILS:665746 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Book<br/> Year-end report. ent://SD_ILS/0/SD_ILS:3560996 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Year-end report.&#160;Year end report&#160;Annual report<br/>Serial&#160;Other<br/> Year-end report. ent://SD_ILS/0/SD_ILS:1709660 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Year-end report.&#160;Year end report<br/>Serial&#160;Other<br/> Nikolai lighting project ent://SD_ILS/0/SD_ILS:1635002 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1989.<br/>Book<br/> Biomass resource update. ent://SD_ILS/0/SD_ILS:1396680 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> FY90 budget overview ent://SD_ILS/0/SD_ILS:1562963 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1989]<br/>Book<br/> Annual project status report. ent://SD_ILS/0/SD_ILS:3439583 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Annual project status report.<br/>Serial&#160;Other<br/> Annual project status report. ent://SD_ILS/0/SD_ILS:1653617 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Annual project status report.<br/>Serial&#160;Other<br/> Assessment of utility condition ent://SD_ILS/0/SD_ILS:1505267 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1989]<br/>Book<br/> Bradley Lake Hydroelectric Project. ent://SD_ILS/0/SD_ILS:703599 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986?]<br/>Book<br/> Alaska water resource bibliography. ent://SD_ILS/0/SD_ILS:385647 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984?]<br/>Collection of water resource bibliographies from multiple state of Alaska and U.S. government agencies.<br/>Book<br/> 1980 year-end status report ent://SD_ILS/0/SD_ILS:2966055 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981?]<br/>Regular print<br/> Combined financial statements and schedules ... ent://SD_ILS/0/SD_ILS:1636664 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Combined financial statements and schedules ...<br/>Serial<br/> Atka small hydropower feasibility study ent://SD_ILS/0/SD_ILS:1673461 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1987.<br/>Book<br/> Rural technical assistance audit : Nikolai ent://SD_ILS/0/SD_ILS:1537676 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> King Cove hydroelectric feasibility study. ent://SD_ILS/0/SD_ILS:3515028 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z c1988.<br/>Book<br/> Solomon Gulch hydroelectric project summary. ent://SD_ILS/0/SD_ILS:1647559 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1977?]<br/>Book<br/> The Larsen Bay Hydroelectric Project. ent://SD_ILS/0/SD_ILS:1582010 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1991?]<br/>Book<br/> Findings and recommendations, Angoon hydropower ent://SD_ILS/0/SD_ILS:1504718 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z c1984.<br/>Book<br/> Unalaska geothermal project : final report ent://SD_ILS/0/SD_ILS:258167 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Haines-Skagway region feasibility study ent://SD_ILS/0/SD_ILS:1515405 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Book<br/> Energy program for Alaska newsletter. ent://SD_ILS/0/SD_ILS:1728325 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z Energy program for Alaska newsletter.<br/>Serial<br/> Susitna Hydroelectric Project public meetings ent://SD_ILS/0/SD_ILS:1694660 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984?]<br/>Electronic resource<br/> Phase 1 final draft report ent://SD_ILS/0/SD_ILS:425020 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1981-]<br/>Book<br/> ADF&amp;G RSA, June 10, 1983 ent://SD_ILS/0/SD_ILS:1980733 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1983]<br/>This document contains information on the Aquatic Studies program and budget for the Reimbursable Services Agreement (RSA) between the Alaska Power Authority and the Alaska Department of Fish and Game (ADF&amp;G) for the 1984 fiscal year. The Department agrees to establish a Susitna Hydro Feasibility Studies Team. The reseach to be conducted by the Aquatic Studies unit is also described.<br/>Regular print<br/> Bradley Lake Hydroelectric Project management plan. ent://SD_ILS/0/SD_ILS:1713311 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Findings and recommendations, Metlakatla power alternatives ent://SD_ILS/0/SD_ILS:1562456 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Draft.<br/>Book<br/> Bradley Lake Hydroelectric Project status report. ent://SD_ILS/0/SD_ILS:1511646 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Cordova power plan : findings and recommendations ent://SD_ILS/0/SD_ILS:702711 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z c1986.<br/>Book<br/> Susitna Hydroelectric Project staged construction presentation. ent://SD_ILS/0/SD_ILS:1593253 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Findings and recommendations, Metlakatla power alternatives ent://SD_ILS/0/SD_ILS:1598580 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Book<br/> Cordova power plan : findings and recommendations. ent://SD_ILS/0/SD_ILS:1598802 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z c1986.<br/>Book<br/> Railbelt intertie proposal : preliminary economic assessment. ent://SD_ILS/0/SD_ILS:1660410 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>Book<br/> Bethel area power plan findings &amp; recommendations. ent://SD_ILS/0/SD_ILS:1610007 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Book<br/> Bradley Lake Hydroelectric Project mitigation plan. ent://SD_ILS/0/SD_ILS:261154 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Regular print<br/> Staged construction pre-filing consultation package. ent://SD_ILS/0/SD_ILS:1624086 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1985]<br/>Regular print<br/> FY 83 proposed geotechnical exploration program ent://SD_ILS/0/SD_ILS:2035137 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1982]<br/>Final.<br/>This report details the proposed Task 5 geotechnical program for the Susitna Hydroelectric Project. These activities are planned for for fiscal year 1983 (July 1, 1982 to June 30, 1983) at the Watana site. Work will include geologic mapping, geophysical exploration, subsurface investigation, and laboratory testing.<br/>Regular print<br/> Records management system, file reference report ent://SD_ILS/0/SD_ILS:1541743 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1987]<br/>&quot;This file reference report is intended to provide insight into the studies and explorations that were conducted on the Susitna Hydroelectric Project and to provide practical details on the records management and retrieval system that has been established by the Alaska Power Authority.&quot;--Leaf 1.<br/>Regular print<br/> [Board of directors meeting : agenda, minutes, etc.] ent://SD_ILS/0/SD_ILS:1727523 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [Board of directors meeting : agenda, minutes, etc.]<br/>Serial<br/> Tazimina River Hydroelectric Project : findings and recommendations. ent://SD_ILS/0/SD_ILS:1614191 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z 1987.<br/>Book<br/> Bradley Lake hydroelectric project plan of finance. ent://SD_ILS/0/SD_ILS:1653226 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Supplement to the Elfin Cove reconnaissance study. ent://SD_ILS/0/SD_ILS:1653018 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1984]<br/>Book<br/> Findings and recommendations, Bristol Bay power plan. ent://SD_ILS/0/SD_ILS:1615691 2024-06-02T20:08:13Z 2024-06-02T20:08:13Z [1986]<br/>Book<br/>