Search Results for Alaska Power Authority.SirsiDynix Enterprisehttps://anch.ent.sirsi.net/client/en_US/arlis/arlis/qu$003dAlaska$002bPower$002bAuthority.$0026ps$003d300?dt=list2024-06-02T20:08:13ZAlaska Power Authority.ent://SD_ILS/0/SD_ILS:16413132024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983?]<br/>Book<br/>Alaska Power Authority : southeast intertie transmission intertieent://SD_ILS/0/SD_ILS:58087342024-06-02T20:08:13Z2024-06-02T20:08:13Z1989<br/>Map of the southeast Alaska and bordering Yukon Territory showing load centers, existing hydroelectric projects and potential hydroelectric projects.<br/>Map<br/>Alaska Power Authority statues and regulations.ent://SD_ILS/0/SD_ILS:16585042024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984?]<br/>Book<br/>Alaska Power Authority, FMUS Chena six repower study.ent://SD_ILS/0/SD_ILS:34515102024-06-02T20:08:13Z2024-06-02T20:08:13Z1984?]<br/>Book<br/>Alaska Power Authority Susitna Hydroelectric Project issues list.ent://SD_ILS/0/SD_ILS:19841862024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Regular print<br/>Alaska Power Authority village power system surveyent://SD_ILS/0/SD_ILS:15057602024-06-02T20:08:13Z2024-06-02T20:08:13Z[1989]<br/>Book<br/>Alaska Energy Authority village power system surveyent://SD_ILS/0/SD_ILS:15402642024-06-02T20:08:13Z2024-06-02T20:08:13Z[1989?]<br/>Book<br/>Alaska Energy Authority community power system surveyent://SD_ILS/0/SD_ILS:16186292024-06-02T20:08:13Z2024-06-02T20:08:13Z[1990?]<br/>Book<br/>Alaska Power Authority response to agency comments on license application.ent://SD_ILS/0/SD_ILS:15764242024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983?]<br/>Book<br/>Alaska Power Authority Susitna Hydroelectric Project project overviewent://SD_ILS/0/SD_ILS:34478062024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project, Position paper, fisheries issue F- ...ent://SD_ILS/0/SD_ILS:14181962024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>A collection of brief statements that are positions of the Alaska Power Authority on fishery aspects of the planned Susitna Hydroelectric Project.<br/>Regular print<br/>Alaska Power Authority : summary supplement on railbelt utilities.ent://SD_ILS/0/SD_ILS:34924122024-06-02T20:08:13Z2024-06-02T20:08:13Z1987.<br/>Book<br/>Alaska Power Authority internal review-- accounting for expenditures.ent://SD_ILS/0/SD_ILS:16813882024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Alaska Power Authority Susitna Hydroelectric Project settlement process, position paper discussion meeting.ent://SD_ILS/0/SD_ILS:14181952024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Regular print<br/>Alaska Power Authority, Susitna Hydroelectric Project, Position paper, recreation issue R-...ent://SD_ILS/0/SD_ILS:20448962024-06-02T20:08:13Z2024-06-02T20:08:13Z<1985><br/>A collection of brief statements that are positions of the Alaska Power Authority on recreation aspects of the planned Susitna Hydroelectric Project.<br/>Regular print Other<br/>Notes of meeting, Bristol Bay regional power plan, Alaska Power Authority.ent://SD_ILS/0/SD_ILS:11006972024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>"The meeting was held to (1) report on the spring studies made on the Tazimina and Newhalen Rivers and (2) present a 'seminar' to interested personnel...on the subject of fish protection at water intakes. The seminar concentrated on problems relevant to the proposed Newhalen diversion plan"--Leaf [2].<br/>Manuscript<br/>Potential hydroelectric power sites : Bristol Bay regional power plan, Alaska Power Authority.ent://SD_ILS/0/SD_ILS:9398552024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>"The purpose of the study is to conduct a detailed feasibility analysis of the Tazimina River Hydroelectric Project, and a feasibility assessment of alternative regional power plans."--Cover letter.<br/>Book<br/>Alaska Power Authority management and organizational review : final reportent://SD_ILS/0/SD_ILS:16399952024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Conditional power sales agreement between Alaska Power Authority and Homer Electric Association, Inc.ent://SD_ILS/0/SD_ILS:16906802024-06-02T20:08:13Z2024-06-02T20:08:13Z[198-]<br/>Book<br/>Alaska Power Authority Susitna hydroelectric project presentation of economic marketing and financial evaluation.ent://SD_ILS/0/SD_ILS:16530942024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Book<br/>Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project, progress report.ent://SD_ILS/0/SD_ILS:17853202024-06-02T20:08:13Z2024-06-02T20:08:13ZAlaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project, progress report. Progress report<br/>Serial Other<br/>Transmission line assessment, Bradley Lake Hydroelectric Project, Alaska Power Authorityent://SD_ILS/0/SD_ILS:12368712024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Book<br/>Anchorage-Fairbanks Transmission Intertie, Alaska Power Authority : environmental assessment reportent://SD_ILS/0/SD_ILS:16020972024-06-02T20:08:13Z2024-06-02T20:08:13Z1982.<br/>Book<br/>The Alaska Power Authority : an internal review : 1983 interim reportent://SD_ILS/0/SD_ILS:16275272024-06-02T20:08:13Z2024-06-02T20:08:13ZWatts, Jerrold.<br/>[1983]<br/>Book<br/>Alaska Power Authority management and organizational review : phase I reportent://SD_ILS/0/SD_ILS:15508552024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Preliminary report for Alaska Power Authority, Railbelt Utilities : Anchorage-Kenai transmission intertie feasibility study.ent://SD_ILS/0/SD_ILS:1432252024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Alaska Power Authority findings and recommendations, Black Bear Lake Hydroelectric Project, Prince of Wales Island.ent://SD_ILS/0/SD_ILS:17204902024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Book<br/>Tunnel muck disposal assessment : Bradley Lake Hydroelectric Project, Alaska Power Authorityent://SD_ILS/0/SD_ILS:2436992024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Middle Fork diversion assessment, Bradley Lake Hydroelectric Project, Alaska Power Authorityent://SD_ILS/0/SD_ILS:12368472024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Book<br/>Alaska Power Authority comments on the Federal Energy Regulatory Commission draft environmental impact statement of May 1984.ent://SD_ILS/0/SD_ILS:16863042024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Regular print<br/>[Alaska Power Authority "wrap-up" insurance on Tyee Lake Hydroelectric Project]ent://SD_ILS/0/SD_ILS:15465052024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project supplement to interim report.ent://SD_ILS/0/SD_ILS:15227632024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Book<br/>Summary of Alaska Power Authority design refinements to Federal Energy Regulatory Commission license application.ent://SD_ILS/0/SD_ILS:20386392024-06-02T20:08:13Z2024-06-02T20:08:13Z1984]<br/>Design refinements are presented for the proposed Watana Dam and Devil Canyon Dam. These refinements were developed as a result of geotechnical investigations conducted after Alaska Power Authority filed its license application for the Susitna Hydroelectric Project in February 1983. The report is accompanied by revised tables for Exhibit D : summary of cost estimate (cost estimates are in January 1982 dollars) and an addendum to Exhibit F : supporting design report.<br/>Electronic resource<br/>Black Bear Lake project, FERC no. 5715, Alaska : applicant, Alaska Power Authorityent://SD_ILS/0/SD_ILS:2672462024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project, Position paper, recreation issue R-3. Significance of loss of whitewater resource.ent://SD_ILS/0/SD_ILS:20448972024-06-02T20:08:13Z2024-06-02T20:08:13Z1985]<br/>This paper describes current recreational use of the Susitna River in its whitewater reaches (between the Denali Highway to the Parks Highway), the significance of loss of whitewater resource due to the planned Susitna Hydroelectric Project, and recommended mitigation measures.<br/>Regular print<br/>Brief environmental report for Alaska Power Authority Teeland-Hollywood 138kV transmission lineent://SD_ILS/0/SD_ILS:15332802024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Final report, review of icing studies : Bradley Lake Hydroelectric Project, Alaska Power Authorityent://SD_ILS/0/SD_ILS:2591792024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Tyee Lake Hydroelectric Project fisheries mitigation plan [microform] : prepared for Alaska Power Authorityent://SD_ILS/0/SD_ILS:17287912024-06-02T20:08:13Z2024-06-02T20:08:13ZKelly, Michael D.<br/>[1982]<br/>Other<br/>JLC Title 245h [microform] :<br/>Alaska Power Authority : final report : a risk assessment evaluation of major electric systemsent://SD_ILS/0/SD_ILS:16020982024-06-02T20:08:13Z2024-06-02T20:08:13Z[1988]<br/>Book<br/>Alaska Power Authority comments on Draft supplemental environmental impact statement, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska.ent://SD_ILS/0/SD_ILS:12368752024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Regular print<br/>Final report to Alaska Power Authority on Pelican power alternatives : phase II, feasibility studyent://SD_ILS/0/SD_ILS:16081932024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Winter studies of resident and juvenile anadromous fish, October 1984-May 1985. Part 1 [microform] / prepared for Alaska Power Authority.ent://SD_ILS/0/SD_ILS:35114102024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Susitna hydro aquatic studies report ; no. 11<br/>Microform<br/>JLC Title 245h [microform]<br/>A Special report on the Alaska Power Authority, September 28, 1976-June 30, 1983.ent://SD_ILS/0/SD_ILS:15600092024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Alaska Power Authority Board of Directors Meeting : Juneau Borough Chambers, Friday, May 3, 1985, 8:30 a.m.ent://SD_ILS/0/SD_ILS:19796302024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Electronic resource<br/>Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 24, 1984ent://SD_ILS/0/SD_ILS:20185012024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Regular print<br/>Alaska Power Authority response to Federal Energy Regulatory Commission data request of March 4, 1985.ent://SD_ILS/0/SD_ILS:20473582024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>This document is a response to FERC's questions regarding environmental aspects of construction of the proposed Susitna Hydroelectric Project or energy alternatives. The issues cover air polluting equipment to be used in dam construction; the method of removal and disposal of trees from the reservoir and dam area, and air quality effects if burning is to be used; sulfur dioxide power plant emissions at the Nenana and Willow power plants; fugitive dust emissions from the Lignite Creek mine and power plant; acid deposition calculations for a 600 MW power plant; PLUEVUE model runs on visibility effects; noise calculations including coal mine blasting, continuous noise; train noise, and power plant noise; and wolverine field data.<br/>Regular print<br/>Alaska Power Authority response to Federal Energy Regulatory Commission data request of March 27, 1985ent://SD_ILS/0/SD_ILS:20481992024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>On March 27, 1985 Donald H. Clarke of the U.S. Federal Energy Regulatory Commission (FERC) sent a letter to Jane Drennan of Pillsbury, Madison & Sutro requesting certain information on the Susitna Hydroelectric Project as part of the project licensing steps. The information requested covers energy alternatives to the proposed hydroelectric project described in the earlier March 5 response. The request involves: cost estimates for the Nenana power plant; heat rate and costs for gas-fired units; costs for coal, combined-cycle, and gas-fired turbine plants; OGP-6 input and output; breakdown of transmission costs for the OGP-6 thermal alternative costs; explanation of costs associated with the Nenana and Beluga coal plants; material and installation costs for the transmission station for the Beluga coal plant; OGP-6 model source code modifications and algorithms; and energy from the Watana and Devil Canyon developments for the Case E-VI alternative flow regimes.<br/>Regular print<br/>Response of the Alaska Power Authority to comments on the Alaska Power Authority's application for license for major project.ent://SD_ILS/0/SD_ILS:2534252024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>In 1983 the Alaska Power Authority (APA) filed an application called "Before the Federal Energy Regulatory Commission : application for license for major project, Susitna Hydroelectric Project" (APA numbers 123-132, 150-152, 484). On December 12, 1983, the U.S. Department of the Interior, Office of the Secretary filed a 108-page letter about the application to FERC. By November 28 eight other federal and state agencies also filed letters. In this document APA responds to the December 12, 1983 letter from U.S. Department of the Interior, Office of the Secretary. (Another document, which is numbered APA 1134 and APA 2496, is APA's response to the other eight agencies.)<br/>Regular print Other<br/>Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.12, plant ecologyent://SD_ILS/0/SD_ILS:35212092024-06-02T20:08:13Z2024-06-02T20:08:13Z1982?]<br/>Book<br/>Alaska Power Authority responses to agency comments on the Draft supplemental environmental impact statement, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska.ent://SD_ILS/0/SD_ILS:16393692024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>This documents contains Alaska Power Authority responses to comments from these agencies: Alaska Office of Management and Budget, National Marine Fisheries Service, U.S. Environmental Protection Agency, U.S. Corps of Engineers, U.S. Department of the Interior. Their earlier comments were in response to the February 1985 report: Draft supplemental environmental impact statement, Bradley Lake Hydroelectric Project, FERC No. 8221 - Alaska.<br/>Regular print<br/>An application to the Alaska Power Authority for operation & maintenance of the Lake Tyee Hydroelectric Projectent://SD_ILS/0/SD_ILS:17343212024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Book<br/>Chilkat River Basin region : reconnaissance assessment of energy alternatives : for State of Alaska, Alaska Power Authorityent://SD_ILS/0/SD_ILS:17320142024-06-02T20:08:13Z2024-06-02T20:08:13Z[1980]<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies annual progress report. Subtask 7.11, Big gameent://SD_ILS/0/SD_ILS:2502652024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Regular print<br/>Alaska Power Authority responses to agency comments on the terrestrial impact assessment report, June, 1985, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska.ent://SD_ILS/0/SD_ILS:12357262024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.14, access road analysisent://SD_ILS/0/SD_ILS:35543332024-06-02T20:08:13Z2024-06-02T20:08:13Z[1980?]<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project : task 7, Environmental studies, wildlife ecology : wildlife habitat value analysisent://SD_ILS/0/SD_ILS:35231222024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.11, wildlife ecology-- furbearersent://SD_ILS/0/SD_ILS:35212072024-06-02T20:08:13Z2024-06-02T20:08:13Z1980]<br/>Book<br/>Susitna-Watana hydro cost of power : Alaska Energy Authority compares estimates to Dr. Colt's report.ent://SD_ILS/0/SD_ILS:19787432024-06-02T20:08:13Z2024-06-02T20:08:13Z[2012]<br/>In a recent discussion paper, Dr. Steve Colt calculates the retail cost of power from Susitna-Watana Hydro during the first year of operation at a much higher rate than the Alaska Energy Authority (AEA). An analysis reveals that almost the entire discrepancy between AEA and Dr. Colt's estimates come from three critical assumptions: capital cost of the project, rate structure, and cost of debt. This brief report outlines each of these assumptions and demonstrates why AEA's analysis is more accurate. The report addresses one assumption at a time, walking through three steps to full correction. In order to compare like costs, this paper focuses on the wholesale cost of power from Susitna-Watana Hydro. Dr. Colt estimates this to be $0.34 per kWh (Dr. Colt then adds $0.06 for distribution costs to estimate a retail rate of $0.40).<br/>Electronic resource<br/>Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies. Procedures manual. Subtask 7.11, Wildlife ecology--furbearersent://SD_ILS/0/SD_ILS:14994262024-06-02T20:08:13Z2024-06-02T20:08:13Z[1980]<br/>This document describes the research methodology for studying furbearing animals within a designated study area that represents where these animals will be affected by the Susitna River hydroelectric dams.<br/>Regular print<br/>Cooperative agreement between the U.S. Fish and Wildlife Service, Region 7, and the Alaska Power Authority.ent://SD_ILS/0/SD_ILS:15141772024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Outlooks for world oil prices : analysis of alternative schools of thought : report to the Alaska Power Authorityent://SD_ILS/0/SD_ILS:19393142024-06-02T20:08:13Z2024-06-02T20:08:13Z[1988]<br/>Final draft.<br/>Book<br/>Alaska Power Authority : reference materials for technical presentation for the Bradley Lake Hydroelectric Project in Homer, Alaskaent://SD_ILS/0/SD_ILS:17675602024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project : environmental studies annual report 1980 : subtask 7.12, plant ecology studiesent://SD_ILS/0/SD_ILS:35231252024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Book<br/>A special report on the Department of Commerce and Economic Development, Alaska Power Authority major capital projects.ent://SD_ILS/0/SD_ILS:15467142024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Department of Commerce, Community, and Economic Development, Alaska Energy Authority, Rural Power System Upgrade Program, procurement issues.ent://SD_ILS/0/SD_ILS:17964282024-06-02T20:08:13Z2024-06-02T20:08:13Z[2008]<br/>Book<br/>Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.92, Susitna Hydroelectric Project, Watana airstrip feasibility study, Phase I, Task 39.ent://SD_ILS/0/SD_ILS:17278062024-06-02T20:08:13Z2024-06-02T20:08:13Z1983]<br/>Regular print<br/>A special report on the Department of Commerce and Economic Development, Alaska Power Authority, Solomon Gulch Hydroelectric Project.ent://SD_ILS/0/SD_ILS:15462602024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>A special report on the Department of Commerce and Economic Development, Alaska Power Authority, Tyee Lake Hydroelectric Project.ent://SD_ILS/0/SD_ILS:15462692024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985?]<br/>Book<br/>A special report on the Department of Commerce and Economic Development, Alaska Power Authority Point Mackenzie electrification project.ent://SD_ILS/0/SD_ILS:15465122024-06-02T20:08:13Z2024-06-02T20:08:13Z1986.<br/>Book<br/>Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 11, 1984 : dam break analysis, Watana and Devil Canyonent://SD_ILS/0/SD_ILS:20473562024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Regular print<br/>Report to the Alaska Power Authority in regard to the plan of finance of the Tyee Lake Hydroelectric Projectent://SD_ILS/0/SD_ILS:17185652024-06-02T20:08:13Z2024-06-02T20:08:13Z1980.<br/>Book<br/>Alaska Power Authority, Susitna Hydroelectric Project, Position paper, recreation issue R-2. Significance of impacts on hunting and recreational trapping, including availability of resource, access, and quality of experience.ent://SD_ILS/0/SD_ILS:20448952024-06-02T20:08:13Z2024-06-02T20:08:13Z1985]<br/>Regular print<br/>Federal Energy Regulatory Commission, Susitna Hydroelectric Project, Project No. 7114, response of the Alaska Power Authority to comments on the Alaska Power Authority's application for license for major project.ent://SD_ILS/0/SD_ILS:15141092024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>In 1983 the Alaska Power Authority (APA) filed an application called "Before the Federal Energy Regulatory Commission : application for license for major project, Susitna Hydroelectric Project" (APA Document numbers 123-132, 150-152, 484). On December 12, 1983, the U.S. Department of the Interior, Office of the Secretary filed a 108-page letter about the application to FERC. By November 28, eight other state and federal agencies also filed letters. This document represents the Alaska Power Authority's responses to the more than 250 specific comments contained in the eight agency comment letters. In this document APA responds to: U.S. Bureau of Land Management; U.S. National Marine Fisheries Service; U.S. Environmental Protection Agency, Region X; U.S. Fish and Wildlife Service; Advistory Council on Historic Preservation (in Washington, D.C.); Alaska Office of Management and Budget; U.S. Department of the Air Force; and Alaska Division of Parks.<br/>Regular print<br/>Attachment C-1 to contract between Alaska Power Authority and Harza-Ebasco Susitna Joint Venture, detailed scope of work fiscal year 1985.ent://SD_ILS/0/SD_ILS:3748742024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Electronic resource<br/>Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.49, Susitna Hydroelectric Project, Eklutna Lake temperature and ice study (with six months simulation for Watana Reservoir)ent://SD_ILS/0/SD_ILS:17280492024-06-02T20:08:13Z2024-06-02T20:08:13Z1984]<br/>Regular print<br/>Alaska Power Authority, Susitna Hydroelectric Project environmental studies procedures manual : subtask 7.11, wildlife ecology--birds and non-game mammalsent://SD_ILS/0/SD_ILS:35212082024-06-02T20:08:13Z2024-06-02T20:08:13Z[1980]<br/>Book<br/>A performance review of the Department of Commerce and Economic Development, Alaska Power Authority : September 28, 1976-December 12, 1980.ent://SD_ILS/0/SD_ILS:33643162024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981?]<br/>Book<br/>A performance review of the Department of Commerce and Economic Development, Alaska Power Authority : September 28, 1976-December 12, 1980.ent://SD_ILS/0/SD_ILS:15600972024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981?]<br/>Book<br/>Alaska Power Authority response to agency comments on license application. Reference to comment(s): I. 99, Data index by habitat area for ADF & G data reports--Phase II, vol.'s 2, 3 & 4.ent://SD_ILS/0/SD_ILS:2570322024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>An index to Phase II data report volumes 2-4 and their appendices of the Susitna Hydro Aquatic Studies.<br/>Regular print<br/>Moose movements and habitat use along the upper Susitna River--progress report to Alaska Power Authority (April 1978 through September 1978)ent://SD_ILS/0/SD_ILS:26223942024-06-02T20:08:13Z2024-06-02T20:08:13ZTaylor, Kenton P.,<br/>[1979]<br/>In order to study potential effects of proposed hydroelectric development in the Devils Canyon area of the Susitna River, baseline information on moose movements within the affected area is being collected. The Alaska Power Authority sponsored this study, which continues a study reported by the same authors in 1978. Radio collars and visual collars were placed on adults captured between the confluences of the Maclaren River and Devil Creek during the October 1976 and March 1977 period. Movement behavior indicates that moose from many portions of the Susitna River drainage use habitats within or adjacent to the impoundment areas.<br/>Regular print<br/>A special report on the Department of Commerce and Economic Development, Alaska Public Utilities Commission, Alaska Power Authority, Power Cost Equalization Program.ent://SD_ILS/0/SD_ILS:15553742024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.105, excerpt from Air-water flow in hydraulic structures.ent://SD_ILS/0/SD_ILS:3754592024-06-02T20:08:13Z2024-06-02T20:08:13ZFalvey, Henry T.,<br/>[1984]<br/>Regular print<br/>Report to the Alaska Power Authority in regard to the plan of finance of the Swan Lake Hydroelectric Project of the Ketchikan Public Utilities Systement://SD_ILS/0/SD_ILS:17185912024-06-02T20:08:13Z2024-06-02T20:08:13Z1980.<br/>Book<br/>A special review of the Alaska Power Authority insurance programs administered through the Alaska Power Authority and the Department of Administration, Division of Risk Management.ent://SD_ILS/0/SD_ILS:15466032024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982?]<br/>Book<br/>Bald eagle program - 1988, surveys of nesting populations, experiments with artificial nests and methods for indirectly relocating nesting pairs, Bradley Lake Hydroelectric Project, Alaska Power Authorityent://SD_ILS/0/SD_ILS:12330352024-06-02T20:08:13Z2024-06-02T20:08:13ZRoseneau, D. G.,<br/>[1989]<br/>Content Time Period d1988<br/>Regular print<br/>Application for amendment of license, Bradley Lake Hydroelectric Project, Bradley River, Kenai Peninsula, Alaska, Alaska Power Authority : exhibits A, B, C, D, E, F, and Gent://SD_ILS/0/SD_ILS:12368742024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Book<br/>Refinement to reservoir and river temperature and ice studies for simulation period October 1976 to May 1977. Text changes and new exhibits I and O for Alaska Power Authority comments on the Federal Energy Regulatory Commission draft environmental impact statement of May 1984, Volume 8, Appendix VI, River ice simulations, Susitna River, Watana Dam to confluence of Susitna and Chulitna riversent://SD_ILS/0/SD_ILS:19796142024-06-02T20:08:13Z2024-06-02T20:08:13Z1985]<br/>This document comprises errata to the main text (that is, "Report" section) and replacements to two exhibits of Volume 8 (which is called Appendix VI. River ice simulations, Susitna River, Watana Dam to confluence of Susitna and Chulitna rivers) of the 11-volume document: Alaska Power Authority comments on the Federal Energy Regulatory Commission draft environmental impact statement of May 1984. (Assigned numbers APA 1179 and SUS 401.)<br/>Microform<br/>Refinement to reservoir and river temperature and ice studies for simulation period October 1976 to May 1977. Text changes and new exhibits G and N for Instream ice simulation study by Harza-Ebasco for Alaska Power Authority : transmitted to the Federal Energy Regulatory Commission on November 2, 1984.ent://SD_ILS/0/SD_ILS:19700742024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>This document comprises errata to the main text (that is, "Report" section) and replacements to two exhibits of the document: Instream ice simulation study. Final report. (Assigned numbers APA 1986 and SUS 434.)<br/>Microform<br/>Alaska Power Authority response to agency comments on license application. Reference to comment(s): B. 8, I. 75, Preliminary environmental assessment of hydroelectric development on the Susitna River.ent://SD_ILS/0/SD_ILS:13765982024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>A report on biological and water quality investigations conducted in 1977-1978 to obtain baseline data on indigenous fish and moose populations and the existing aquatic habitat of the Susitna River drainage as part of the Susitna Hydroelectric Project in Alaska.<br/>Regular print<br/>Bald Eagle program, 1986 : prefabrication and installation of artificial nests and nesting structures, direct relocation of nesting pairs, and coning natural nests, Bradley Lake Hydroelectric Project, Alaska Power Authorityent://SD_ILS/0/SD_ILS:12368732024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>[Review of application for license submitted to FERC on February 28, 1983 for the Susitna Hydroelectric Project no. 71114 : cover letter and comments to Eric Yould, Alaska Power Authority, Anchorage, AK]ent://SD_ILS/0/SD_ILS:10984982024-06-02T20:08:13Z2024-06-02T20:08:13ZAnderson, Lawrence R.<br/>1983.<br/>A list of deficiencies identified by Office of Electric Power Regulation concerning the preliminary draft of the Susitna Hydroelectric Project's Federal Energy Regulatory Commission (FERC) license application. Includes extensive comments to the various exhibits attached to the application.<br/>Regular print<br/>Alaska Power Authority response to agency comments on license application. Reference to comment(s): I.230, excerpt from Suggested practices for raptor protection on power lines : the state of the art in 1981ent://SD_ILS/0/SD_ILS:14668142024-06-02T20:08:13Z2024-06-02T20:08:13ZOlendorff, Richard R.,<br/>[1984]<br/>Regular print<br/>Alaska Power Authority response to agency comments on license application. Reference to comment(s): D. 1, I. 204, Protection strategies for peregrine falcons and other raptors along the planned Northwest Alaskan Gas Pipeline routeent://SD_ILS/0/SD_ILS:14993412024-06-02T20:08:13Z2024-06-02T20:08:13ZRoseneau, D. G.<br/>[1984]<br/>The proposed Northwest Alaskan Gas Pipeline would parallel the existing Trans-Alaska Pipeline between Prudhoe Bay and Delta Junction. At Delta Junction it would diverge southeastward to follow the Alaska Highway to the U.S.-Canadian border. This report was conducted to develop protection measures for nesting raptors in the proposed gas pipeline alignment. Emphasis has been placed on the peregrine falcon. Other raptors for which protection strategies are developed are the gyrfalcon, rough-legged hawk, golden eagle, bald eagle, and osprey.<br/>Regular print<br/>Alaskan electric power : an analysis of future requirements and supply alternatives for the Railbelt region : final report : for Alaska Division of Energy and Power Development, Department of Commerce and Economic Development, and the Alaska Power Authorityent://SD_ILS/0/SD_ILS:17030232024-06-02T20:08:13Z2024-06-02T20:08:13Z1978.<br/>Book<br/>The status of the Puerto Rico Electric Power Authority (PREPA) restructuring support agreement : oversight hearing before the Subcommittee on Indian, Insular and Alaska Native Affairs of the Committee on Natural Resources, U.S. House of Representatives, One Hundred Fifteenth Congress, first session, Wednesday, March 22, 2017.ent://SD_ILS/0/SD_ILS:29791202024-06-02T20:08:13Z2024-06-02T20:08:13Z2017.<br/>Book<br/>The status of the Puerto Rico Electric Power Authority (PREPA) restructuring support agreement : oversight hearing before the Subcommittee on Indian, Insular and Alaska Native Affairs of the Committee on Natural Resources, U.S. House of Representatives, One Hundred Fifteenth Congress, first session, Wednesday, March 22, 2017.ent://SD_ILS/0/SD_ILS:46765862024-06-02T20:08:13Z2024-06-02T20:08:13Z2017.<br/>Microform<br/>The status of the Puerto Rico Electric Power Authority (PREPA) restructuring support agreement : oversight hearing before the Subcommittee on Indian, Insular and Alaska Native Affairs of the Committee on Natural Resources, U.S. House of Representatives, One Hundred Fifteenth Congress, first session, Wednesday, March 22, 2017.ent://SD_ILS/0/SD_ILS:29748682024-06-02T20:08:13Z2024-06-02T20:08:13Z2017.<br/>Electronic resource<br/>An Act Relating to the quorum of the Alaska Energy Authority; relating to the powers and duties of the Alaska Energy Authority; relating to the acquisition or construction of a Susitna River power project by the Alaska Energy Authority; relating to the definition of "feasibility study" in the Alaska Energy Authority Act; providing legislative approval for certain loans from the power project fund; and providing for an effective date.ent://SD_ILS/0/SD_ILS:19789142024-06-02T20:08:13Z2024-06-02T20:08:13Z[2011?]<br/>Electronic resource<br/>Cook Inlet and tributaries, Alaska : letter from the Secretary of the Army transmitting a letter from the Chief of Engineers, Department of the Army, dated December 10, 1953, submitting an interim report, together with accompanying papers and illustrations, on a survey of Cook Inlet and tributaries, Alaska. This interim report is submitted under the authority for a preliminary examination and survey of harbors and rivers in Alaska, with a view to determining the advisability of improvements in the interest of navigation, flood control, hydroelectric power, and related water uses, authorized by the Flood Control Act approved on June 30, 1948. It is also submitted in final response to several other congressional authorizations listed in the report.ent://SD_ILS/0/SD_ILS:602032024-06-02T20:08:13Z2024-06-02T20:08:13Z1957.<br/>Book<br/>Terror Lake Hydroelectric Project, 1984 / 20 MW installation, Kodiak, Alaska : progress report no. 7ent://SD_ILS/0/SD_ILS:17105962024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Report on Pelican power alternatives : phase I, reconnaissance assessmentent://SD_ILS/0/SD_ILS:1133372024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Book<br/>Environmental analysis of access road alternativesent://SD_ILS/0/SD_ILS:3747182024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>"This report constitutes an analysis of three alternative corridors as provided to the environmental team by R & M Consultants, Inc."--Leaf 1.<br/>Electronic resource<br/>Bioenergy news.ent://SD_ILS/0/SD_ILS:35311212024-06-02T20:08:13Z2024-06-02T20:08:13Z[ -1997]<br/>Bioenergy news. Alaska Power Authority bioenergy news Division of Energy bioenergy news Alaska bioenergy news Energy update<br/>Serial Other<br/>Bioenergy news.ent://SD_ILS/0/SD_ILS:16872082024-06-02T20:08:13Z2024-06-02T20:08:13Z[ -1997]<br/>Bioenergy news. Alaska Power Authority bioenergy news Division of Energy bioenergy news Alaska bioenergy news. Energy update<br/>Serial Other<br/>Task 3, Hydrology. Field data indexent://SD_ILS/0/SD_ILS:10987382024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>[July 1982 version].<br/>Index to hydrologic and climatologic data for Alaska Power Authority Susitna Hydroelectric Project study team members. Index contains historical data up to Jan. 1, 1980 and post-1980 data collected by government agencies and study team members.<br/>Microform<br/>Susitna Hydroelectric Project field data indexent://SD_ILS/0/SD_ILS:3751572024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>[1981 ed.].<br/>"The objective of the Field Data Index & Distribution System is to establish a formal system of conveying information concerning hydrologic and climatic data availability to each member of the study team. The project data base consists of (a) Historical recorded data to January 1, 1980; (b) 1980 data collected by government agencies and study team members."--P. 1.<br/>Electronic resource<br/>Subtask 6.05, Development selection report.ent://SD_ILS/0/SD_ILS:20185512024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>1st draft.<br/>Regular print<br/>Introduction to the amendment to the license application before the Federal Energy Regulatory Commission.ent://SD_ILS/0/SD_ILS:2912662024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>"This document provides an overview of the history and status of the Alaska Power Authority's application for license to construct and operate the Susitna Hydroelectric project. In addition, the principal economic and environmental issues relating to the licensing of the Project are addressed."--P. 1.<br/>Regular print<br/>Best management practices manual. Oil spill contingency planningent://SD_ILS/0/SD_ILS:15410612024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Best management practices manual. Erosion and sedimentation controlent://SD_ILS/0/SD_ILS:15978492024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Electronic resource<br/>Best management practices manual. Fuel and hazardous materialsent://SD_ILS/0/SD_ILS:15978552024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Electronic resource<br/>Task 3, Hydrology. Regional flood studiesent://SD_ILS/0/SD_ILS:16179532024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Regular print<br/>Best management practices manual. Water withdrawal and storageent://SD_ILS/0/SD_ILS:15978522024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Electronic resource<br/>Best management practices manual. Liquid and solid waste managementent://SD_ILS/0/SD_ILS:15978592024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Final].<br/>Electronic resource<br/>Environmental studies annual report, 1980. Subtask 7.05, Socioeconomic analysisent://SD_ILS/0/SD_ILS:3739372024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>"The socioeconomic analysis presented and discussed herein is designed to assess the important socioeconomic impacts that could result from hydroelectric development on the Susitna River"--Page [3].<br/>Regular print<br/>Task 3, Hydrology. Field data indexent://SD_ILS/0/SD_ILS:10987372024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>[Feb. 1983 version].<br/>Index to hydrologic and climatologic data for Alaska Power Authority Susitna Hydroelectric Project study team members. Index contains historical data up to Jan. 1, 1980 and post-1980 data collected by government agencies and study team members.<br/>Regular print<br/>Environmental studies procedures manual. Subtask 7.07, Land use analysisent://SD_ILS/0/SD_ILS:19806922024-06-02T20:08:13Z2024-06-02T20:08:13Z[1980]<br/>This procedure manual describes the research methodology in performing a land use analysis to evaluate the change in the use of land caused by the proposed Susitna Hydroelectric Project (including the dam, reservoir, transportation access and transmission lines) and to determine the overall affect of the project.<br/>Electronic resource<br/>Task 3, Hydrology. Water quality annual report, 1982ent://SD_ILS/0/SD_ILS:16017602024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>"This report describes and presents the results of the 1982 data collection effort and is intended to supplement the 1981 Water Quality Annual Report where a more comprehensive discussion on methodology is given as well as a tabulation of historical data."--Page 1-1.<br/>Electronic resource<br/>Task 3, Hydrology. Field data collection and processingent://SD_ILS/0/SD_ILS:3753262024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>"This Closeout Report presents an overview of the data-collection program and a general description of the field work undertaken relative to each of the hydrologic parameters."--Page 1-1.<br/>Regular print<br/>Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative.ent://SD_ILS/0/SD_ILS:20185132024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Final draft.<br/>"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.<br/>Electronic resource<br/>Task 3, Hydrology. Ice observations, 1980-81ent://SD_ILS/0/SD_ILS:2524372024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>"This report provides a summary of freezeup, winter and breakup ice observations ... on the Susitna River and a review of limited historical records on river ice conditions."--Page 1.1.<br/>Content Time Period d1980 d1981<br/>Regular print<br/>Bradley River water quality report.ent://SD_ILS/0/SD_ILS:12368692024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]-<br/>Bradley River water quality report. Bradley Lake Hydroelectric Project 1985-1986 Alaska Power Authority, Bradley Lake Hydroelectric Project 1987-1988 Bradley River water quality report ..., Bradley Lake Hydroelectric Project Water quality report, Bradley River 1986<br/>Serial<br/>Task 11, Reference report, economic, marketing and financial evaluationent://SD_ILS/0/SD_ILS:2506922024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982?]<br/>Electronic resource<br/>Design transmittal. Subtasks 6.02, 6.03, 6.06, Preliminary design considerations.ent://SD_ILS/0/SD_ILS:19912942024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Electronic resource<br/>Task 2, Surveys and site facilities. Subtask 2.10, Access planning studyent://SD_ILS/0/SD_ILS:3760422024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Prelim. 2nd printing.<br/>"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--Leaves 1-2, 1-3.<br/>Microform<br/>Task 3, Hydrology. Field data collection and processing. Supplement 1, 1982 field dataent://SD_ILS/0/SD_ILS:3753252024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>This report presents summaries of field data collected during the 1982 water year, October 1981 to September 1982, inclusive.<br/>Regular print<br/>Environmental studies procedures manual. Subtask 7.11, Wildlife ecology. Birds and non-game mammalsent://SD_ILS/0/SD_ILS:19806912024-06-02T20:08:13Z2024-06-02T20:08:13Z[1980]<br/>This procedure manual describes the research methodology for conducting an investigation on potential effects of the proposed Susitna Hydroelectric Project on birds and non-game mammals in the upper Susitna River basin. The purpose is to evaluate current animal habitats, to provide a basis for predicting faunal changes based on habitat changes caused by environmental alterations, and to evaluate mitigation measures.<br/>Electronic resource<br/>Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternativeent://SD_ILS/0/SD_ILS:2524342024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.<br/>Microform<br/>Task 6, Development selection. Subtask 6.05, Development selection reportent://SD_ILS/0/SD_ILS:11692592024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>2nd draft.<br/>"Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Report presents the results of this initial step in the POS process, and provides recommendations and justification for continuation of study of a specific basin development."--Page 1-1.<br/>Regular print<br/>Bradley River salmon escapement monitoring study, 1987, Bradley Lake Hydroelectric Projectent://SD_ILS/0/SD_ILS:12368682024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Subtask 3.01, Closeout reportent://SD_ILS/0/SD_ILS:2504682024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>[February 1981 version].<br/>The objective of the Subtask 3.01 is to assemble and review all available reports, maps, and studies relating to the hydrologic aspects of the Susitna basin and neighboring basins and to abstract hydrologic design parameters required for the planning studies concerned with alternative hydroelectric sites including small hydroelectric development in the Alaska Railbelt.<br/>Regular print<br/>Task 6, Development selection. Subtask 6.05, Development selection reportent://SD_ILS/0/SD_ILS:3776742024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>[Final].<br/>"Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Report presents the results of this initial step in the POS process, and provides recommendations and justification for continuation of study of a specific basin development."--Page 1-1.<br/>Regular print<br/>Settlement process, instream flow relationships report, volume no. 1ent://SD_ILS/0/SD_ILS:2616492024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Working draft, [2nd draft].<br/>Regular print<br/>Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through Jent://SD_ILS/0/SD_ILS:3776732024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>[December 1981 edition].<br/>Regular print<br/>Draft instream flow relationships report. Volume no. 2ent://SD_ILS/0/SD_ILS:3751352024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>"This document comprises Volume II of the Instream Flow Relationships Report (IFRR), a two-volume series on instream flow processes in the middle Susitna River ... The objectives of the IFRR are twofold: 1) to identify the relative importances of salient physical processes to fish resources, and 2) to evaluate and, where possible, quantify the influences of incremental changes in important variables on fish habitat."--Page I-1.<br/>Regular print<br/>[Terror Lake hydro documents]ent://SD_ILS/0/SD_ILS:2296952024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985?]<br/>Book<br/>Power sales agreements for Swan Lake, Solomon Gulch, Terror Lakeent://SD_ILS/0/SD_ILS:15562462024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Book<br/>Railbelt intertie reconnaissance studyent://SD_ILS/0/SD_ILS:17144812024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987-1989]<br/>Book<br/>Lake Elva plan of financeent://SD_ILS/0/SD_ILS:16869312024-06-02T20:08:13Z2024-06-02T20:08:13Z1981.<br/>Book<br/>Black Bear Lake Hydroelectric Project : plan of financeent://SD_ILS/0/SD_ILS:34427772024-06-02T20:08:13Z2024-06-02T20:08:13Z1982]<br/>Book<br/>Draft summary of environmental report, Task 2, Surveys and site facilitiesent://SD_ILS/0/SD_ILS:10951542024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Regular print<br/>Before the Federal Energy Regulatory Commission, application for license for major project, Susitna Hydroelectric Project. Volume 1, Initial statement. Exhibit A, Exhibit C, February 1983 ; Exhibit D, revised July 1983ent://SD_ILS/0/SD_ILS:14576512024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Electronic resource<br/>Proposal to purchase the Snettisham hydroelectric projectent://SD_ILS/0/SD_ILS:15532552024-06-02T20:08:13Z2024-06-02T20:08:13ZBook<br/>Small hydropower evaluation guidelines : a sourcebook for microhydropower development in Alaskaent://SD_ILS/0/SD_ILS:1306012024-06-02T20:08:13Z2024-06-02T20:08:13Z1986.<br/>Explores the possible development of microhydropower use in Alaska. Small hydropower systems (to 200 kilowatts) could be especially useful in the North, where many small isolated populations lack interconnection to a large power source. Also useful is the independency of microhydrosystems, providing relatively constant power over many years of operation, with minimal environmental impacts.<br/>Book<br/>Watana airstrip feasibility study, phase I : for the Susitna Hydroelectric Projectent://SD_ILS/0/SD_ILS:35114222024-06-02T20:08:13Z2024-06-02T20:08:13Z1983.<br/>Microform<br/>Feasibility study for Togiak hydroelectric project : supplemental data report : hydrologyent://SD_ILS/0/SD_ILS:15469702024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Feasibility study for Togiak hydroelectric project : supplemental data report : hydrologyent://SD_ILS/0/SD_ILS:15577162024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Feasibility study for Larsen Bay hydroelectric project : supplemental data report : hydrologyent://SD_ILS/0/SD_ILS:15469722024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Feasibility study for King Cove hydroelectric project : supplemental data report : hydrologyent://SD_ILS/0/SD_ILS:2602812024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Feasibility study for Old Harbor hydroelectric project : supplemental data report : hydrologyent://SD_ILS/0/SD_ILS:15467392024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Feasibility study for Larsen Bay hydroelectric project : supplemental data report : hydrologyent://SD_ILS/0/SD_ILS:15576582024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Susitna Hydroelectric Project : summary reportent://SD_ILS/0/SD_ILS:15385942024-06-02T20:08:13Z2024-06-02T20:08:13Z1982.<br/>Draft.<br/>A draft summary report of the Feasibility Study of the Susitna Hydroelectric Project proposed by the Alaska Power Authority and intended for the public at large and interested agencies and organizations.<br/>Book<br/>Feasibility study for Old Harbor hydroelectric project [electronic resource] : supplemental data report : hydrologyent://SD_ILS/0/SD_ILS:15469692024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Computer file<br/>JLC Title 245h [electronic resource] :<br/>Winter studies of resident and juvenile anadromous fish, October 1984-May 1985. Part 1 [microform]ent://SD_ILS/0/SD_ILS:16062312024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Microform<br/>JLC Title 245h [microform]<br/>Salmon passage validation studies, August-October 1984 [microform] : addendum to report no. 3, ch. 6ent://SD_ILS/0/SD_ILS:16095452024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform] :<br/>Availability of invertebrate food sources for rearing chinook salmon in turbid Susitna River habitat report no. 8 / [microform] :ent://SD_ILS/0/SD_ILS:34852862024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Susitna hydro aquatic studies report ; no. 8<br/>Microform<br/>JLC Title 245h [microform] :<br/>Winter studies of resident and juvenile anadromous fish (October 1984-May 1985) report no. 11, part 2 / [microform] :ent://SD_ILS/0/SD_ILS:34854082024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Susitna hydro aquatic studies report ; no. 11<br/>Microform<br/>JLC Title 245h [microform] :<br/>Winter studies of resident and juvenile anadromous fish (October 1984-May 1985) [microform] : report no. 11, part 2ent://SD_ILS/0/SD_ILS:7173892024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Microform<br/>JLC Title 245h [microform] :<br/>Bristol Bay regional power plan detailed feasibility analysis : interim feasibility assessment : executive summaryent://SD_ILS/0/SD_ILS:3418292024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982].<br/>Book<br/>Alaska's energy plan 1986 : draftent://SD_ILS/0/SD_ILS:26169212024-06-02T20:08:13Z2024-06-02T20:08:13Z1985.<br/>Book<br/>Tazimina River Hydroelectric Project feasibility reportent://SD_ILS/0/SD_ILS:16950402024-06-02T20:08:13Z2024-06-02T20:08:13Zc1987.<br/>Book<br/>Feasibility study and preliminary engineering for Chena Station : phase one report, February 1983ent://SD_ILS/0/SD_ILS:33985422024-06-02T20:08:13Z2024-06-02T20:08:13Z1983.<br/>Book<br/>Watana airstrip feasibility study, phase I [microform]ent://SD_ILS/0/SD_ILS:15468482024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>[April 1983 ed.].<br/>Microform<br/>JLC Title 245h [microform]<br/>Transmission intertie Kake-Petersburg, Alaska : a reconnaissance reportent://SD_ILS/0/SD_ILS:15427032024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Book<br/>Guide survey reportent://SD_ILS/0/SD_ILS:3752102024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>This study presents information about guides who rely on the area in the vicinity of the proposed Susitna River dams and access routes, their operations, and their clients.<br/>Electronic resource<br/>Recreation survey report [microform]ent://SD_ILS/0/SD_ILS:16051632024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform]<br/>Bristol Bay regional power plan, Newhalen River juvenile sockeye salmon studies, number 2ent://SD_ILS/0/SD_ILS:2551882024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>This baseline study is the second in support a feasibility analysis of a proposed run-of-the-river hydroelectric project (water diverted into a canal) on the Newhalen River, Alaska. It focuses on the temporal distribution and enumeration of sockeye salmon smolt, fry, and adults. Fish diversion and impingement survival tests were conducted.<br/>Book<br/>Rural energy, problems and prospectsent://SD_ILS/0/SD_ILS:15747122024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Book<br/>Tazimina River Hydroelectric Project : progress reportent://SD_ILS/0/SD_ILS:16967952024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Book<br/>Feasibility report City Creek run of the River Hydropower Project Petersburg, Alaskaent://SD_ILS/0/SD_ILS:17199572024-06-02T20:08:13Z2024-06-02T20:08:13Z[1979]<br/>Book<br/>Instream ice simulations : supplementary studies for middle Susitna Riverent://SD_ILS/0/SD_ILS:35397712024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Susitna Hydroelectric Project, Watana development winter 1983 geotechnical exploration projectent://SD_ILS/0/SD_ILS:15373692024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Presents geological conditions in the Susitna River Valley at the damsite, cofferdams and in the adjacent relict Watana channel northeast of the site. Emphasis is given to geophysical exploration, drilling, and sampling, field permeability testing in overburden and pressure testing in bedrock, laboratory testing and instrumentation.<br/>Regular print<br/>Susitna Hydroelectric Project Watana development winter 1983 geotechnical exploration projectent://SD_ILS/0/SD_ILS:33972832024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Instream ice simulations [microform] : supplementary studies for middle Susitna Riverent://SD_ILS/0/SD_ILS:15213722024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>"River ice simulation results are presented herein as a supplement to those included in the "Instream Ice Simulation Study" (Harza-Ebasco 1984b)."--Summary.<br/>Microform<br/>JLC Title 245h [microform] :<br/>Susitna Hydroelectric Project, aquatic plan of study, fiscal year 1985 : final reportent://SD_ILS/0/SD_ILS:35288622024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Slough geohydrology studiesent://SD_ILS/0/SD_ILS:19526312024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>[February 1984 draft].<br/>Regular print<br/>Business survey reportent://SD_ILS/0/SD_ILS:14562822024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>This report presents the methodology and results of a survey of businesses located in Talkeetna, Trapper Creek, Cantwell, and Healy in order to describe baseline socioeconomic conditions of communities that could be affected by the Susitna Hydroelectric Project.<br/>Regular print<br/>Aquatic monitoring manualent://SD_ILS/0/SD_ILS:23733052024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>This manual was written for the use by the SuHydro Aquatic Study Team in carrying out long-term monitoring of impacts on fish and aquatic habitats as a result of the Susitna Hydroelectric Project. The focus of the monitoring will be downstream of the damsites to determine baseline and with-project conditions, evaluate mitigation measures, refine operation procedures and mitigation measures, and determine impacts on aquatic resources.<br/>Regular print<br/>Watana and Devil Canyon Reservoir temperature/ice and suspended sediment concentration study [microform]ent://SD_ILS/0/SD_ILS:35114532024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Microform<br/>JLC Title 245h [microform]<br/>Water quality monitoring, 1985 : reportent://SD_ILS/0/SD_ILS:14562042024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Microform<br/>Economic and financial updateent://SD_ILS/0/SD_ILS:23557222024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>[Draft].<br/>In this financial update on the Susitna Hydroelectric Project, an assessment is made of the effect of oil prices and of the corresponding outlook on the economy in Alaska on the feasibility of the project.<br/>Regular print<br/>Tanana reconnaissance study of energy requirements and alternativesent://SD_ILS/0/SD_ILS:16071382024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981]<br/>Preliminary, for review.<br/>Book<br/>Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project. Volume 2, Stage III [microform]ent://SD_ILS/0/SD_ILS:15216672024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform]<br/>Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project, volume 1, stages 1 and 2 [microform]ent://SD_ILS/0/SD_ILS:34829572024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform]<br/>Environmental implication of Susitna Project alternativesent://SD_ILS/0/SD_ILS:23557612024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>[Draft].<br/>Part A considers environmental implications for the Susitna Hydroelectric Project. Part B considers environmental implications for the electric generating options that are alternative to this project, specifically, coal fired facilities at Beluga and Nenana, facilities fired by natural gas from the Cook Inlet and North Slope, and the Chakachmna hydroelectric alternative.<br/>Regular print<br/>Susitna Hydroelectric Project, reservoir and river sedimentationent://SD_ILS/0/SD_ILS:10987392024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Draft.<br/>"The scope of the present study includes a reservoir sedimentation analysis for Watana and Devil Canyon Reservoirs, and a river sediment transport study for the Susitna River between the Devil Canyon dam site and the Sunshine stream gaging station ... The major tasks are: 1. to review available relevant reports, 2. to estimate sediment inflow to the reservoirs and sediment deposit in the reservoirs for 50 and 100 years of reservoir operation, 3. to conduct a preliminary assessment of aggradation and degradation of the Susitna River below the dams especially near the mouths of the tributaries and sloughs; 4. to recommend areas of concern for further study; and 5. to recommend a program of data collection required for further study."--P. 1-1.<br/>Microform<br/>Susitna River at Watana and Devil Canyon, streamflow time series : reportent://SD_ILS/0/SD_ILS:14576562024-06-02T20:08:13Z2024-06-02T20:08:13Z1985.<br/>Microform<br/>Kodiak Island Borough electrification planning assessment : final reportent://SD_ILS/0/SD_ILS:54249092024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Kodiak Island Borough electrification planning assessment : final reportent://SD_ILS/0/SD_ILS:15440252024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Book<br/>Flow duration curves for natural and with-project conditionsent://SD_ILS/0/SD_ILS:19807322024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>[Draft].<br/>Flow duration curves for the Susitna River at Gold Creek, Sunshine, and Susitna stations were derived for natural conditions and projected conditions after construction of the proposed Susitna Hydroelectric Project. Observed weekly flows are given for the Chulitna and Talkeetna rivers near Talkeetna and the Skwentna River near Skwentna.<br/>Electronic resource<br/>Flood frequency analyses for natural and with-project conditionsent://SD_ILS/0/SD_ILS:14810672024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Draft].<br/>Flood frequency analyses were made for the Susitna River at Gold Creek and at Sunshine and Susitna Stations for natural and with-project conditions with the resulting flood peak frequency curves and flood peaks for selected recurrence intervals.<br/>Regular print<br/>River stage fluctuation resulting from alternative operations, Watana developmentent://SD_ILS/0/SD_ILS:20388732024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>[May 1984 final report].<br/>River stage fluctuations due to alternative operations of the Watana Dam are estimated for the Susitna River from the Devil Canyon damsite to the Sunshine gage station located 14 miles downstream of the confluence of the Susitna and Chulitna rivers. Such operations would cause considerable fluctuation of reservoir releases within short time intervals. Both dams make up the proposed Susitna Hydroelectric Project. An earlier report by the same title was issued in January 1984 (Document no. 884). The purpose of this report is to provide a study of stage fluctuations for more moderate discharge variations.<br/>Regular print<br/>Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, waste control plan [microform]ent://SD_ILS/0/SD_ILS:57374922024-06-02T20:08:13Z2024-06-02T20:08:13Z1982.<br/>Book<br/>JLC Title 245h [microform]<br/>Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, waste control plan [microform]ent://SD_ILS/0/SD_ILS:16766672024-06-02T20:08:13Z2024-06-02T20:08:13Z1982.<br/>Microform<br/>JLC Title 245h [microform]<br/>Community energy reconnaissance of Goodnews Bay, Grayling, Scammon Bay, and Togiakent://SD_ILS/0/SD_ILS:17150452024-06-02T20:08:13Z2024-06-02T20:08:13Z1981.<br/>Book<br/>Middle Susitna River sedimentation study : stream channel stability analysis of selected sloughs, side channels and main channel locationsent://SD_ILS/0/SD_ILS:14814572024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Draft].<br/>"This study was conducted to evaluate potential effects of the Susitna Hydroelectric Project on channel stability at selected sites in the mainstem and at selected sloughs and side channels. ... The study reach includes the Susitna River between Devil Canyon and the confluence of the Susitna and Chulitna rivers"--Leaf 1.<br/>Regular print<br/>Best management practices manualent://SD_ILS/0/SD_ILS:16088122024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Recreation survey report : reportent://SD_ILS/0/SD_ILS:3150002024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>The purpose of this recreation survey was to obtain baseline activity information for recreation sites in the vicinity of the Susitna Hydroelectric Project, that is, along the Denali Highway and along the Richardson Highway near Paxson. The results of the survey will be used to refine projects on the Project's effects on recreation and for recreation mitigation planning.<br/>Microform<br/>A report on the first series of community meetings on the feasibility studies for the Susitna Hydroelectric Project and other power alternatives : April 1980, Fairbanks, Talkeetna, Wasilla, Anchorageent://SD_ILS/0/SD_ILS:17199172024-06-02T20:08:13Z2024-06-02T20:08:13Z1980.<br/>An account of community meetings from July 1979 to April 1980 to allow Alaska's citizens to participate in the development of a Plan of study for the Susitna Hydroelectric Project.<br/>Microform<br/>Watana airstrip feasibility study, Phase Ient://SD_ILS/0/SD_ILS:14576542024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>[April 1983 ed.].<br/>Regular print<br/>Watana airstrip feasibility study, Phase Ient://SD_ILS/0/SD_ILS:23589072024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>[September 1983 ed.].<br/>Regular print<br/>Downstream vegetation impacts assessment : reportent://SD_ILS/0/SD_ILS:11656532024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Electronic resource<br/>Susitna Hydroelectric Project. Subtask 4.5, socioeconomic studies : projection assumptions, methodology and output formatsent://SD_ILS/0/SD_ILS:34503372024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>Draft final.<br/>Book<br/>Unalaska geothermal feasibility studyent://SD_ILS/0/SD_ILS:2564922024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, erosion control plan [microform]ent://SD_ILS/0/SD_ILS:57475302024-06-02T20:08:13Z2024-06-02T20:08:13Z1982.<br/>Book<br/>JLC Title 245h [microform]<br/>Tyee Lake Hydroelectric Project transmission line construction from Bradfield River to Wrangell, erosion control plan [microform]ent://SD_ILS/0/SD_ILS:16766492024-06-02T20:08:13Z2024-06-02T20:08:13Z1982.<br/>Microform<br/>JLC Title 245h [microform]<br/>Site significance--a framework for evaluating cultural resources associated with the Susitna Hydroelectric Project in central Interior Alaskaent://SD_ILS/0/SD_ILS:20481932024-06-02T20:08:13Z2024-06-02T20:08:13Z1984]<br/>Draft.<br/>This report explains the importance of assessing cultural properties that could be effected by construction and operation of the proposed Susitna Hydroelectric Project. Section 2 addresses the determination of site significance. Section 3 presents variables recorded at each site. Section 4 presents research questions grouped by five areas (cultural chronology; effects of tephra falls on prehistoric human ecology; subsistence and settlement; population dynamics, exchange, and diffusion; and ethnography and history).<br/>Regular print<br/>Fiscal year 1986 budget bookent://SD_ILS/0/SD_ILS:3749152024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Electronic resource<br/>Drainage structure and waterway design guidelines : reportent://SD_ILS/0/SD_ILS:12373672024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>[Draft].<br/>Regular print<br/>Drainage structure and waterway design guidelines : reportent://SD_ILS/0/SD_ILS:3749512024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Final].<br/>"This manual is intended to be used by design engineers during the preparation of contract plans and specification for Alaska Power Authority Projects. The guidelines in the manual incorporate standard engineering practices and procedures, and also address Alaska Department of Fish and Game 1981 proposed habitat regulations where appropriate."--P. 1-1.<br/>Electronic resource<br/>Site significance : a framework for evaluating cultural resources associated with the Susitna Hydroelectric Project in central interior Alaska : draft reportent://SD_ILS/0/SD_ILS:35268722024-06-02T20:08:13Z2024-06-02T20:08:13Z1984]<br/>Book<br/>Downstream aquatic impact assessment reportent://SD_ILS/0/SD_ILS:23732842024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Regular print<br/>Definition and costs of thermal power alternatives to Susitna : reportent://SD_ILS/0/SD_ILS:16912372024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Flood frequency analyses for natural and with-project conditions : reportent://SD_ILS/0/SD_ILS:3752012024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Final].<br/>Flood frequency analyses were made for the Susitna River at Gold Creek and at Sunshine and Susitna Stations for natural and with-project conditions with the resulting flood peak frequency curves and flood peaks for selected recurrence intervals.<br/>Microform<br/>Streamflow time series, Susitna River at Watana and Devil Canyon : draft reportent://SD_ILS/0/SD_ILS:19526332024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Regular print<br/>Instream ice simulations, supplementary studies for middle Susitna Riverent://SD_ILS/0/SD_ILS:14576522024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Draft].<br/>"River ice simulation results are presented herein as a supplement to those included in the 'Instream Ice Simulation Study' (Harza-Ebasco 1984b)."--Summary.<br/>Regular print<br/>Socioeconomic impact projections. Air transportation from Anchorage scenario : reportent://SD_ILS/0/SD_ILS:3751012024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Electronic resource<br/>Instream ice simulations, supplementary studies for middle Susitna Riverent://SD_ILS/0/SD_ILS:14627102024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Final].<br/>"River ice simulation results are presented herein as a supplement to those included in the "Instream Ice Simulation Study" (Harza-Ebasco 1984b)."--Summary.<br/>Regular print<br/>Watana and Devil Canyon reservoir temperature/ice and suspended sediment concentration study : reportent://SD_ILS/0/SD_ILS:14562082024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Microform<br/>Reservoir/river temperatures and ice simulations for Watana only operating in 2001 : reportent://SD_ILS/0/SD_ILS:3750292024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Survey of experience in operating hydroelectric projects in cold regionsent://SD_ILS/0/SD_ILS:3749742024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Final].<br/>A literature review, mailed survey, and site visit have been made to evaluate the procedures adopted by operators of hydroelectric projects in cold regions similar to the Susitna Hydroelectric Project site in response to environmental concerns. Topics that are addressed include reservoir and powerhouse operations to mitigate ice jam related flooding, effects of reservoir ice cover and bank ice on animal crossing, management of reservoir ice cover to control cracking and associated danger to animals, and bank erosion from reservoir and river ice movement.<br/>Regular print<br/>Reconnaissance study of energy requirements and alternatives for Kaltag, Savoonga, White Mountain and Eliment://SD_ILS/0/SD_ILS:17148172024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981?]<br/>Book<br/>Anchorage/Fairbanks Intertie Transmission Line and Terror Lake Hydroelectric Project workers surveys, spring 1984 : reportent://SD_ILS/0/SD_ILS:14562052024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Reservoir/river temperatures and ice simulations for Watana and Devil Canyon operating in 2002 : reportent://SD_ILS/0/SD_ILS:3750282024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Socioeconomic impact projections. Air transportation from Fairbanks scenario : reportent://SD_ILS/0/SD_ILS:3751022024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Electronic resource<br/>Middle Susitna River sedimentation study : stream channel stability analysis of selected sloughs, side channels and main channel locations : reportent://SD_ILS/0/SD_ILS:3751792024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>"This study was conducted to evaluate potential effects of the Susitna Hydroelectric Project on channel stability at selected sites ... in the mainstem and at selected sloughs and side channels ... the study reach includes the Susitna River between Devil Canyon and the confluence of the Susitna and Chulitna rivers"--Leaf 1.<br/>Microform<br/>Analysis of the coal alternative for supplying power to the Railbelt region of Alaskaent://SD_ILS/0/SD_ILS:16755972024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>"This analysis of the coal alternative for electricity power generation in the Railbelt Region examines four issues: 1) present and projected demand for coals mined in Alaska; 2) current and projected supply of Alaska coals; 3) appropriate concepts for projecting coal prices; and 4) current and projected prices of Alaska coals."--Leaf 1.<br/>Microform<br/>Refinements to reservoir and river temperatures and ice simulations for October 1976 to May 1977, mete[o]rologic and hydrologic data : reportent://SD_ILS/0/SD_ILS:3750452024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Stream flows and flow duration curves at Watana, Gold Creek, Sunshine and Susitna Station, for Watana only operation in 1996 and 2001 : reportent://SD_ILS/0/SD_ILS:3749732024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Instream flow relationships report series fish resources and habitats in the middle Susitna River, technical report no. 1 / [microform] :ent://SD_ILS/0/SD_ILS:34831802024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform] :<br/>Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage projectent://SD_ILS/0/SD_ILS:3751252024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>"Thirty-three complete water years are contained in the period of simulation."--Page 1.<br/>Regular print<br/>Task 3, Hydrology. Field data index : reportent://SD_ILS/0/SD_ILS:3748752024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>[Final version].<br/>Index to hydrologic and climatologic data for Alaska Power Authority Susitna Hydroelectric Project study team members. Index contains historical data up to Jan. 1, 1980 and post-1980 data collected by government agencies and study team members.<br/>Microform<br/>Cantwell business survey report : reportent://SD_ILS/0/SD_ILS:17271912024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>"This business survey was designed to obtain information on types of services and products offered, length of operation and ownership, number of employees, residence of employees, business volumes, short-term expansion and start-up plans, and dependency upon fish and wildlife resources."--Leaf [1].<br/>Electronic resource<br/>Talkeetna business survey report : reportent://SD_ILS/0/SD_ILS:17269992024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>"This business survey was designed to obtain information on types of services and products offered, length of operation and ownership, number of employees, residence of employees, business volumes, short-term expansion and start-up plans, and dependence upon fish and wildlife resources."--Leaf [1].<br/>Electronic resource<br/>Close-out status report for invertebrate analysis : reportent://SD_ILS/0/SD_ILS:14562102024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Microform<br/>Impoundment area fish impact assessment and mitigation planent://SD_ILS/0/SD_ILS:14828792024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Draft].<br/>Regular print<br/>Traffic analysis report for the Susitna Hydroelectric Project : reportent://SD_ILS/0/SD_ILS:14562802024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Railhead analysis report for the Susitna Hydroelectric Project : reportent://SD_ILS/0/SD_ILS:3150542024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Instream flow relationships report series [microform] : physical processes of the middle Susitna River, technical report no. 2ent://SD_ILS/0/SD_ILS:7310932024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform] :<br/>Glacial lake physical limnology studies, Eklutna Lake, Alaskaent://SD_ILS/0/SD_ILS:14576502024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Regular print<br/>Hypothetical mining studies and coal price estimates, Beluga and Nenana coal fieldsent://SD_ILS/0/SD_ILS:16754232024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>"The Harza-Ebasco Susitna Joint Venture (H-E) has requested the Paul Weir Company (Weirco) to perform four mining studies to estimate the price of coal from the Beluga and Nenana regions of Alaska. The studies are to be based on hypothetical geologic deposits which are representative of actual geologic conditions in the two regions."--Introduction.<br/>Microform<br/>Susitna Basin hydrological-meteor[o]logical data summary October 1982-December 1984 : reportent://SD_ILS/0/SD_ILS:3750952024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>Socioeconomic impact projections summary report, comparison of car and air transportation scenarios : reportent://SD_ILS/0/SD_ILS:15067842024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>"This report provides a summary and comparison of socioeconomic impact projections of the Susitna Hydroelectric Project under alternative worker transportation scenarios for the communities that are expected to be significantly affected by the Project."--Leaf 1.<br/>Electronic resource<br/>Documentation report, socioeconomic impact modelent://SD_ILS/0/SD_ILS:14562072024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Regular print<br/>Assessment of access by spawning salmon into tributaries of the lower Susitna River [microform]ent://SD_ILS/0/SD_ILS:34834792024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform]<br/>Assessment of the effects of the proposed Susitna Hydroelectric Project on instream temperature and fish resources in the Watana to Talkeetna reach [microform] : supplemental report Case E-6 and additional Case C operating regimesent://SD_ILS/0/SD_ILS:34829232024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform] :<br/>Winter bird populations in forest habitats of the middle Susitna River Basin, Alaskaent://SD_ILS/0/SD_ILS:3751602024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Electronic resource<br/>Riparian vegetation succession report : reportent://SD_ILS/0/SD_ILS:12332912024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Electronic resource<br/>Background research and predictive model for cultural resources located along the Susitna Hydroelectric Project's linear features phase 1 report / [microform] :ent://SD_ILS/0/SD_ILS:34834932024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform] :<br/>Phase I report, Background research and predictive model for cultural resources located along the Susitna Hydroelectric Project's linear features [microform]ent://SD_ILS/0/SD_ILS:3150492024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Microform<br/>JLC Title 245h [microform]<br/>Bid documents for the site preparation contract, Bradley Lake Hydroelectric Project, Kenai Peninsula, Alaska, invitation to bid no. APA-86-R-004ent://SD_ILS/0/SD_ILS:12368442024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Regular print<br/>Characterization of aquatic habitats in the Talkeetna-to-Devil Canyon segment of the Susitna River, Alaskaent://SD_ILS/0/SD_ILS:3751422024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>[Final].<br/>Microform<br/>Task 3, Hydrology. Ice observations, 1981-82ent://SD_ILS/0/SD_ILS:19531702024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Prelim. draft.<br/>Content Time Period d1980 d1982<br/>Regular print<br/>Financial statements.ent://SD_ILS/0/SD_ILS:15473892024-06-02T20:08:13Z2024-06-02T20:08:13ZFinancial statements.<br/>Serial<br/>Annual reportent://SD_ILS/0/SD_ILS:34798122024-06-02T20:08:13Z2024-06-02T20:08:13ZAnnual report Year-end report Annual report<br/>Serial Other<br/>Annual reportent://SD_ILS/0/SD_ILS:17096632024-06-02T20:08:13Z2024-06-02T20:08:13ZAnnual report Annual report<br/>Serial Other<br/>Bioenergy newsletterent://SD_ILS/0/SD_ILS:15564452024-06-02T20:08:13Z2024-06-02T20:08:13Z[[ -198-?]<br/>Bioenergy newsletter Bioenergy news<br/>Serial<br/>Socioeconomic analysis.ent://SD_ILS/0/SD_ILS:6657462024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Book<br/>Year-end report.ent://SD_ILS/0/SD_ILS:35609962024-06-02T20:08:13Z2024-06-02T20:08:13ZYear-end report. Year end report Annual report<br/>Serial Other<br/>Year-end report.ent://SD_ILS/0/SD_ILS:17096602024-06-02T20:08:13Z2024-06-02T20:08:13ZYear-end report. Year end report<br/>Serial Other<br/>Nikolai lighting projectent://SD_ILS/0/SD_ILS:16350022024-06-02T20:08:13Z2024-06-02T20:08:13Z1989.<br/>Book<br/>Biomass resource update.ent://SD_ILS/0/SD_ILS:13966802024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>FY90 budget overviewent://SD_ILS/0/SD_ILS:15629632024-06-02T20:08:13Z2024-06-02T20:08:13Z[1989]<br/>Book<br/>Annual project status report.ent://SD_ILS/0/SD_ILS:34395832024-06-02T20:08:13Z2024-06-02T20:08:13ZAnnual project status report.<br/>Serial Other<br/>Annual project status report.ent://SD_ILS/0/SD_ILS:16536172024-06-02T20:08:13Z2024-06-02T20:08:13ZAnnual project status report.<br/>Serial Other<br/>Assessment of utility conditionent://SD_ILS/0/SD_ILS:15052672024-06-02T20:08:13Z2024-06-02T20:08:13Z[1989]<br/>Book<br/>Bradley Lake Hydroelectric Project.ent://SD_ILS/0/SD_ILS:7035992024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986?]<br/>Book<br/>Alaska water resource bibliography.ent://SD_ILS/0/SD_ILS:3856472024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984?]<br/>Collection of water resource bibliographies from multiple state of Alaska and U.S. government agencies.<br/>Book<br/>1980 year-end status reportent://SD_ILS/0/SD_ILS:29660552024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981?]<br/>Regular print<br/>Combined financial statements and schedules ...ent://SD_ILS/0/SD_ILS:16366642024-06-02T20:08:13Z2024-06-02T20:08:13ZCombined financial statements and schedules ...<br/>Serial<br/>Atka small hydropower feasibility studyent://SD_ILS/0/SD_ILS:16734612024-06-02T20:08:13Z2024-06-02T20:08:13Z1987.<br/>Book<br/>Rural technical assistance audit : Nikolaient://SD_ILS/0/SD_ILS:15376762024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>King Cove hydroelectric feasibility study.ent://SD_ILS/0/SD_ILS:35150282024-06-02T20:08:13Z2024-06-02T20:08:13Zc1988.<br/>Book<br/>Solomon Gulch hydroelectric project summary.ent://SD_ILS/0/SD_ILS:16475592024-06-02T20:08:13Z2024-06-02T20:08:13Z[1977?]<br/>Book<br/>The Larsen Bay Hydroelectric Project.ent://SD_ILS/0/SD_ILS:15820102024-06-02T20:08:13Z2024-06-02T20:08:13Z[1991?]<br/>Book<br/>Findings and recommendations, Angoon hydropowerent://SD_ILS/0/SD_ILS:15047182024-06-02T20:08:13Z2024-06-02T20:08:13Zc1984.<br/>Book<br/>Unalaska geothermal project : final reportent://SD_ILS/0/SD_ILS:2581672024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Haines-Skagway region feasibility studyent://SD_ILS/0/SD_ILS:15154052024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Book<br/>Energy program for Alaska newsletter.ent://SD_ILS/0/SD_ILS:17283252024-06-02T20:08:13Z2024-06-02T20:08:13ZEnergy program for Alaska newsletter.<br/>Serial<br/>Susitna Hydroelectric Project public meetingsent://SD_ILS/0/SD_ILS:16946602024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984?]<br/>Electronic resource<br/>Phase 1 final draft reportent://SD_ILS/0/SD_ILS:4250202024-06-02T20:08:13Z2024-06-02T20:08:13Z[1981-]<br/>Book<br/>ADF&G RSA, June 10, 1983ent://SD_ILS/0/SD_ILS:19807332024-06-02T20:08:13Z2024-06-02T20:08:13Z[1983]<br/>This document contains information on the Aquatic Studies program and budget for the Reimbursable Services Agreement (RSA) between the Alaska Power Authority and the Alaska Department of Fish and Game (ADF&G) for the 1984 fiscal year. The Department agrees to establish a Susitna Hydro Feasibility Studies Team. The reseach to be conducted by the Aquatic Studies unit is also described.<br/>Regular print<br/>Bradley Lake Hydroelectric Project management plan.ent://SD_ILS/0/SD_ILS:17133112024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Findings and recommendations, Metlakatla power alternativesent://SD_ILS/0/SD_ILS:15624562024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Draft.<br/>Book<br/>Bradley Lake Hydroelectric Project status report.ent://SD_ILS/0/SD_ILS:15116462024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Cordova power plan : findings and recommendationsent://SD_ILS/0/SD_ILS:7027112024-06-02T20:08:13Z2024-06-02T20:08:13Zc1986.<br/>Book<br/>Susitna Hydroelectric Project staged construction presentation.ent://SD_ILS/0/SD_ILS:15932532024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Findings and recommendations, Metlakatla power alternativesent://SD_ILS/0/SD_ILS:15985802024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Book<br/>Cordova power plan : findings and recommendations.ent://SD_ILS/0/SD_ILS:15988022024-06-02T20:08:13Z2024-06-02T20:08:13Zc1986.<br/>Book<br/>Railbelt intertie proposal : preliminary economic assessment.ent://SD_ILS/0/SD_ILS:16604102024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>Book<br/>Bethel area power plan findings & recommendations.ent://SD_ILS/0/SD_ILS:16100072024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Book<br/>Bradley Lake Hydroelectric Project mitigation plan.ent://SD_ILS/0/SD_ILS:2611542024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Regular print<br/>Staged construction pre-filing consultation package.ent://SD_ILS/0/SD_ILS:16240862024-06-02T20:08:13Z2024-06-02T20:08:13Z[1985]<br/>Regular print<br/>FY 83 proposed geotechnical exploration programent://SD_ILS/0/SD_ILS:20351372024-06-02T20:08:13Z2024-06-02T20:08:13Z[1982]<br/>Final.<br/>This report details the proposed Task 5 geotechnical program for the Susitna Hydroelectric Project. These activities are planned for for fiscal year 1983 (July 1, 1982 to June 30, 1983) at the Watana site. Work will include geologic mapping, geophysical exploration, subsurface investigation, and laboratory testing.<br/>Regular print<br/>Records management system, file reference reportent://SD_ILS/0/SD_ILS:15417432024-06-02T20:08:13Z2024-06-02T20:08:13Z[1987]<br/>"This file reference report is intended to provide insight into the studies and explorations that were conducted on the Susitna Hydroelectric Project and to provide practical details on the records management and retrieval system that has been established by the Alaska Power Authority."--Leaf 1.<br/>Regular print<br/>[Board of directors meeting : agenda, minutes, etc.]ent://SD_ILS/0/SD_ILS:17275232024-06-02T20:08:13Z2024-06-02T20:08:13Z[Board of directors meeting : agenda, minutes, etc.]<br/>Serial<br/>Tazimina River Hydroelectric Project : findings and recommendations.ent://SD_ILS/0/SD_ILS:16141912024-06-02T20:08:13Z2024-06-02T20:08:13Z1987.<br/>Book<br/>Bradley Lake hydroelectric project plan of finance.ent://SD_ILS/0/SD_ILS:16532262024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Supplement to the Elfin Cove reconnaissance study.ent://SD_ILS/0/SD_ILS:16530182024-06-02T20:08:13Z2024-06-02T20:08:13Z[1984]<br/>Book<br/>Findings and recommendations, Bristol Bay power plan.ent://SD_ILS/0/SD_ILS:16156912024-06-02T20:08:13Z2024-06-02T20:08:13Z[1986]<br/>Book<br/>