NEW DEEP DRILLING RIG SCHEDULED TO MOVE TO SLOPE IN TWO WEEKS.
Title:
NEW DEEP DRILLING RIG SCHEDULED TO MOVE TO SLOPE IN TWO WEEKS.
With Note:
Rasmuson call number: ALASKA PER HD9567 A4 A7.
Supplement/Special Entry:
Alaska report 1980, V.26 (SEPT. 3, 1980) SECT.1, P. 3.
Content Time Period:
1980