Skip to:ContentBottom
Cover image for Scoping document 2, Susitna-Watana Hydroelectric Project, FERC Project no. P-14241-000.
Scoping document 2, Susitna-Watana Hydroelectric Project, FERC Project no. P-14241-000.
Title:
Scoping document 2, Susitna-Watana Hydroelectric Project, FERC Project no. P-14241-000.
Publication Information:
Washington, D.C. : Federal Energy Regulatory Commission, Office of Energy Projects, Division of Hydropower Licensing, [2012]
Physical Description:
2, iii, 70 p. : map ; 28 cm.
General Note:
This scoping document represents a statement from the Federal Energy Regulatory Commission (as named in the document on p. 1 and 56).

Includes introduction letter from the Federal Energy Regulatory Commission, Office of Energy Projects dated July 16, 2012 with the subject line: Scoping document 2 for the Susitna-Watana Hydroelectric Project.

"July 2012."

ARLIS assigned report number: SuWa 85.
Abstract:
Scoping Document 2 is intended to advise all participants of the proposed scope of the environmental impact statement (EIS) based on the written and verbal comments received during the scoping period. This document contains a brief description of: (1) the scoping process and schedule for the development of the EIS; (2) the proposed action(s) and reasonable alternatives identified to date; (3) preliminary identification of environmental issues and proposed studies; (4) a proposed EIS outline; and (5) a preliminary list of comprehensive plans that are applicable to the proposed project.
Bibliography Note:
Includes bibliographical references (p. 55-56).
Type of Report:
Federal Energy Regulatory Commission (FERC) documents.
Citation Reference Notes:
Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Federal Energy Regulatory Commission (FERC) documents.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Contents:
Introduction -- Scoping -- Proposed action and alternatives -- Scope of cumulative effects and site-specific resource issues -- Proposed studies -- EIS preparation schedule -- Proposed EIS outline -- Consistency with comprehensive plans -- Mailing list -- appendix A. Process plan and schedule -- appendix B. Entities that filed written comments.
Go to:Top of Page