Skip to:ContentBottom
Cover image for 2012 river flow routing model data collection.
2012 river flow routing model data collection.
Title:
2012 river flow routing model data collection.
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2012]
Physical Description:
11, 4 p. : col. maps, col. charts ; 28 cm.
General Note:
Title from caption.

"Susitna-Watana Hydroelectric Project"--Page header.

"Susitna-Watana Hydroelectric Project FERC #14241, Alaska Energy Authority"--Page footer.

"May 2, 2012"--Page footer.

ARLIS assigned report number: SuWa 99.
Abstract:
As part of the Alaska Energy Authority's license application submitted to FERC for the proposed Susitna-Watana Hydroelectric Project, studies are required. This study plan describes data collection during 2012 for developing a river flow routing model. The model will cover the reach between River Mile 75 and the proposed dam at River Mile 184.
Bibliography Note:
Includes bibliographical references (p. 11).
Added Corporate Author:
Type of Report:
2012 environmental study plans.
Citation Reference Notes:
Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: 2012 environmental study plans.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Title on Project's Document webpage: River flow routing model data collection study plan
Contents:
[Main report] -- appendix A. Example data measurement and recording standards.
Go to:Top of Page