Skip to:ContentBottom
Cover image for Design transmittal, Task 2, Analysis of alternative transportation for camp resupply
Design transmittal, Task 2, Analysis of alternative transportation for camp resupply
Title:
Design transmittal, Task 2, Analysis of alternative transportation for camp resupply
JLCTITLE245:
prepared by C.A. Debelius.
Personal Author:
Uniform Title:
Task 2, Analysis of alternative transportation for camp resupply. Design transmittal
Edition:
[February 1980 ed.].
Publication Information:
[Buffalo, N.Y.?] : [Acres American Incorporated], [1980]
Physical Description:
8, [14] p. ; 28 cm.
General Note:
"February 1980."

At head of title: Alaska Power Authority, Susitna Hydroelectric Project.
Abstract:
An analysis of alternative airfields to be used to supply a camp at the Watana dam site during construction of the Susitna Hydroelectric Project. Options include large and light aircraft and helicopters.
Added Corporate Author:
Citation Reference Notes:
Assigned APA Document no. 1218 in the Susitna Hydroelectric Project document index.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Alaska Power Authority, Susitna Hydroelectric Project. Design transmittal, Task 2, Analysis of alternative transportation for camp resupply

Portion of title: Analysis of alternative transportation for camp resupply
Go to:Top of Page