Geomorphology resources, Study plan Section 6 introduction, Final study plan
Title:
Geomorphology resources, Study plan Section 6 introduction, Final study plan
JLCTITLE245:
Alaska Energy Authority.
Corporate Author:
Uniform Title:
Final study plan. Study plan Section 6, Introduction, geomorphology resources
Publication Information:
[Anchorage] : Alaska Energy Authority, [2013]
Physical Description:
8 p. ; 28 cm.
General Note:
"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Abstract:
The overall goal of the geomorphology studies below Watana Dam is to assess the potential effects of the proposed Susitna-Watana Hydroelectric Project on the fluvial geomorphology of the Susitna River, with particular focus on providing information to assist in predicting Project impacts to aquatic and terrestrial habitat. In general, the geomorphology studies will focus on the likely trends and magnitudes of responses of a suite of geomorphic characteristics that make up and control the quantity, quality and distribution of riverine habitat downstream from the proposed dam.
Added Corporate Author:
Type of Report:
Final study plan.
Citation Reference Notes:
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Final study plan. Geomorphology resources introduction